Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (61 biz days late)
Active: 63 biz days
Paused: 129 biz days
🕐 Clock stopped: Completed (Oct 3, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸129d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Oct 3, 2025
129 business days (not counted)
▶ Clock Running
Status: Assigned
Oct 3 → Oct 3, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Scheduled
Oct 3 → Oct 3, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 3 → Oct 3, 2025
0 business days (counted)
Running total: 63 of ? biz days used
Created: Dec 30, 2024Completed: Oct 3, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 30 → Apr 1
Created
▶ Running
63
63
Apr 1 → Oct 3
Ready for Release
⏸ Paused
129
—
Oct 3 → Oct 3
Assigned
▶ Running
0
63
Oct 3 → Oct 3
Scheduled
▶ Running
0
63
Oct 3 → Oct 3
Tech On Site
▶ Running
0
63
Holding193.2d (excluded)
Coordinators0.4d
Field Work1.0d
Billing0.0d
✗ SLA Missed
Holding(excluded from total)
193.2 days
Coordinators
0.4 days
Field Work
1.0 days
Billing
0.0 days
Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Oct 4, 2025 (88 days early)
📅
192.3 daysTotal Age
⏱️
130.0d in Ready for ReleaseLongest Stage
🔄
7 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
6 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed on schedule
Invoiced • 429 days old
🚨
Primary Delay130.0 days stuck in "Ready for Release"
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
130.0d
Scheduled
0.4d / 2.0d SLA
Tech On Site
0.4d / 1.0d SLA
Completed
0.6d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Reorganized all wires and placed connections that weren’t connected to PC. Plugged kiosk back in and PC wouldn’t boot back up, has TP Link installed and showing solid green light. Connected spare Systech router from trunk stock and still wouldn’t boot up. Held power and reset simultaneously on PC for 45 seconds and unplugged power from outlet for 1 minute, and plugged back in. Waited 30 minutes and still wouldn’t boot back up, issue with PC and will need a follow up for PC replacement.
🔍Technician Findings
Touchscreen showing toolkit shortcut folder, top monitor showing ad advertisements. Wires unorganized in kiosk cabinet and some connections not connected to PC.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf