Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (182 biz days late)
Active: 184 biz days
Paused: 61 biz days
🕐 Clock stopped: Completed (Dec 23, 2025)
50d
▶ Clock Running
Status: Created
Dec 30 → Mar 13, 2025
50 business days (counted)
Running total: 50 of ? biz days used
▶ Clock Running
Status: Entered
Mar 13 → Mar 13, 2025
0 business days (counted)
Running total: 50 of ? biz days used
▶ Clock Running
Status: Canceled
Mar 13 → Apr 1, 2025
13 business days (counted)
Running total: 63 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Apr 4, 2025
3 business days (not counted)
▶ Clock Running
Status: Canceled
Apr 4 → Apr 7, 2025
1 business day (counted)
Running total: 64 of ? biz days used
⏸33d
⏸ Clock Paused
Status: Ready for Release
Apr 7 → May 22, 2025
33 business days (not counted)
▶ Clock Running
Status: Assigned
May 22 → May 22, 2025
0 business days (counted)
Running total: 64 of ? biz days used
▶ Clock Running
Status: Scheduled
May 22 → Jun 13, 2025
15 business days (counted)
Running total: 79 of ? biz days used
▶ Clock Running
Status: Reschedule
Jun 13 → Jun 13, 2025
0 business days (counted)
Running total: 79 of ? biz days used
▶ Clock Running
Status: Scheduled
Jun 13 → Jun 16, 2025
1 business day (counted)
Running total: 80 of ? biz days used
▶ Clock Running
Status: Reschedule
Jun 16 → Jun 16, 2025
0 business days (counted)
Running total: 80 of ? biz days used
▶ Clock Running
Status: Scheduled
Jun 16 → Jul 8, 2025
14 business days (counted)
Running total: 94 of ? biz days used
▶ Clock Running
Status: Entered
Jul 8 → Jul 8, 2025
0 business days (counted)
Running total: 94 of ? biz days used
▶ Clock Running
Status: Canceled
Jul 8 → Jul 11, 2025
3 business days (counted)
Running total: 97 of ? biz days used
⏸25d
⏸ Clock Paused
Status: Ready for Release
Jul 11 → Aug 15, 2025
25 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 15 → Aug 15, 2025
0 business days (counted)
Running total: 97 of ? biz days used
87d
▶ Clock Running
Status: Scheduled
Aug 15 → Dec 23, 2025
87 business days (counted)
Running total: 184 of ? biz days used
Created: Dec 30, 2024Completed: Dec 23, 2025
Show SLA Clock Detail (17 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 30 → Mar 13
Created
▶ Running
50
50
Mar 13 → Mar 13
Entered
▶ Running
0
50
Mar 13 → Apr 1
Canceled
▶ Running
13
63
Apr 1 → Apr 4
Ready for Release
⏸ Paused
3
—
Apr 4 → Apr 7
Canceled
▶ Running
1
64
Apr 7 → May 22
Ready for Release
⏸ Paused
33
—
May 22 → May 22
Assigned
▶ Running
0
64
May 22 → Jun 13
Scheduled
▶ Running
15
79
Jun 13 → Jun 13
Reschedule
▶ Running
0
79
Jun 13 → Jun 16
Scheduled
▶ Running
1
80
Jun 16 → Jun 16
Reschedule
▶ Running
0
80
Jun 16 → Jul 8
Scheduled
▶ Running
14
94
Jul 8 → Jul 8
Entered
▶ Running
0
94
Jul 8 → Jul 11
Canceled
▶ Running
3
97
Jul 11 → Aug 15
Ready for Release
⏸ Paused
25
—
Aug 15 → Aug 15
Assigned
▶ Running
0
97
Aug 15 → Dec 23
Scheduled
▶ Running
87
184
Holding114.1d (excluded)
Coordinators120.7d
Field Work0.0d
Billing0.0d
✗ SLA Missed
Holding(excluded from total)
114.1 days
Coordinators
120.7 days
Over SLA
Field Work
0.0 days
Billing
0.0 days
Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Dec 23, 2025 (8 days early)
📅
245.3 daysTotal Age
⏱️
88.0d in ScheduledLongest Stage
🔄
16 transitionsStatus Changes
⚠️
112.8d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 429 days old
🚨
Primary Delay88.0 days stuck in "Scheduled"
⏱️
Total Delay112.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
50.3d
Canceled
19.4d
Ready for Release
63.9d
Scheduled
120.5d / 2.0d SLA
Reschedule
0.3d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
7/8/25 lcoonrod
cancelling PM and adding to WO-01286846
6/13/25 RCook- Placed WO in reschedule status due to repairs on 6/17/25
3/13/25 0955 lcoonrod cancelling PM and adding to repair case 00473817 4/4 KHardison, cancelling, combining with repair WO.
🔧Work Performed
**PM Completed.
**Lightly dusted inside and outside of higi
**Checked and calibrated audio & volume, BP, touch screen and weight bench.
**Wiped down higi with disinfectant cleaner
**Tested for functionality
**Completed full test successfully
**Verified/Changed BIOS setting to “POWER ON”
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01227597
Account: HIGI LLC
Customer Case Number:
Location: Stop & Shop 2701
Address: 1925 Pawtucket Avenue, East Providence, RI 02914
Manufacturer: Merge SH Holdings, Inc.
Model #: KMY8202F
Serial #: KMY-120328650-027
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/20