📍 Stop&Shop 22 — 55 Long Pond Drive, South Yarmouth MA, 02664
Dec 30, 2024 → Sep 9, 2025
✅ Completed
PSM
SLA Clock
Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (72 biz days late)
Active: 74 biz days
Paused: 100 biz days
🕐 Clock stopped: Completed (Sep 9, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸100d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Aug 22, 2025
100 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 22 → Aug 22, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 22 → Sep 9, 2025
11 business days (counted)
Running total: 74 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 74 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 74 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 9 → Sep 9, 2025
0 business days (counted)
Running total: 74 of ? biz days used
Created: Dec 30, 2024Completed: Sep 9, 2025
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 30 → Apr 1
Created
▶ Running
63
63
Apr 1 → Aug 22
Ready for Release
⏸ Paused
100
—
Aug 22 → Aug 22
Assigned
▶ Running
0
63
Aug 22 → Sep 9
Scheduled
▶ Running
11
74
Sep 9 → Sep 9
Tech On Site
▶ Running
0
74
Sep 9 → Sep 9
Tech Off Site
▶ Running
0
74
Sep 9 → Sep 9
Tech On Site
▶ Running
0
74
Holding164.2d (excluded)
Coordinators11.0d
Field Work2.1d
Billing0.3d
✗ SLA Missed
Holding(excluded from total)
164.2 days
Coordinators
11.0 days
Over SLA
Field Work
2.1 days
Billing
0.3 days
Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Sep 9, 2025 (113 days early)
📅
174.3 daysTotal Age
⏱️
101.0d in Ready for ReleaseLongest Stage
🔄
9 transitionsStatus Changes
⚠️
9.1d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
2 visitsOn-Site Trips
👤
Self-ScheduledScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by David Trost — scheduling delays attributed to technician, not coordinators
Visit 1Sep 9, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 429 days old
🚨
Primary Delay101.0 days stuck in "Ready for Release"
⏱️
Total Delay9.1 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
101.0d
Scheduled
11.0d / 2.0d SLA
Tech On Site
1.1d / 1.0d SLA
Tech Off Site
1.0d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.1d / 1.0d SLA
Ready to Bill
0.3d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Upon arrival, unit was up and running. LED's illuminated. Cabinetry and good condition.
Performed and completed preventative maintenance procedures on this unit. unit passes functional testing and has been returned to service.
🔍Technician Findings
Upon arrival, unit was up and running. LED's illuminated. Cabinetry and good condition.
Performed and completed preventative maintenance procedures on this unit. unit passes functional testing and has been returned to service.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01227608
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 22
Address: 55 Long Pond Drive, South Yarmouth, MA 02664
Manufacturer: Merge SH Holdings, Inc.
Model #: KMY8202F
Serial #: KMY-120630950-745
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2025
Sched