Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (148 biz days late)
Active: 150 biz days
Paused: 95 biz days
🕐 Clock stopped: Completed (Dec 23, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸95d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Aug 15, 2025
95 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 15 → Aug 15, 2025
0 business days (counted)
Running total: 63 of ? biz days used
87d
▶ Clock Running
Status: Scheduled
Aug 15 → Dec 23, 2025
87 business days (counted)
Running total: 150 of ? biz days used
Created: Dec 30, 2024Completed: Dec 23, 2025
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 30 → Apr 1
Created
▶ Running
63
63
Apr 1 → Aug 15
Ready for Release
⏸ Paused
95
—
Aug 15 → Aug 15
Assigned
▶ Running
0
63
Aug 15 → Dec 23
Scheduled
▶ Running
87
150
Holding159.2d (excluded)
Coordinators88.0d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
159.2 days
Coordinators
88.0 days
Over SLA
Billing
0.1 days
Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Dec 23, 2025 (8 days early)
📅
245.3 daysTotal Age
⏱️
96.0d in Ready for ReleaseLongest Stage
🔄
5 transitionsStatus Changes
⚠️
86.5d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 429 days old
🚨
Primary Delay96.0 days stuck in "Ready for Release"
⏱️
Total Delay86.5 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
96.0d
Scheduled
88.0d / 2.0d SLA
Closed
1.5d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
**PM Completed.
**Lightly dusted inside and outside of higi
**Checked and calibrated audio & volume, BP, touch screen and weight bench.
**Wiped down higi with disinfectant cleaner
**Tested for functionality
**Completed full test successfully
**Verified/Changed BIOS setting to “POWER ON”
🔍Technician Findings
Unit in service
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
Work Order: WO-01227719
Account: HIGI LLC
Customer Case Number:
Location: Stop&Shop 710
Address: 368 Cottage Street, Pawtucket, RI 02861
Manufacturer: Merge SH Holdings, Inc.
Model #: KMY8202F
Serial #: KMY-120328650-029
Contact Name:
Contact Phone:
Contact Email:
Due Date: 12/31/2025
Scheduled