← WO Overview

WO-01228972 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Bicentennial Building - Aetna — 320 W Washington St, Springfield IL, 62768

Dec 30, 2024 → Sep 15, 2025

✅ Completed
PSM
SLA Clock
Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (77 biz days late)
Active: 79 biz days
Paused: 99 biz days
🕐 Clock stopped: Tech Off Site (Sep 15, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸99d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Aug 21, 2025
99 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 21 → Aug 21, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 21 → Aug 26, 2025
3 business days (counted)
Running total: 66 of ? biz days used
▶ Clock Running
Status: Reschedule
Aug 26 → Aug 28, 2025
2 business days (counted)
Running total: 68 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 28 → Aug 29, 2025
1 business day (counted)
Running total: 69 of ? biz days used
▶ Clock Running
Status: Reschedule
Aug 29 → Sep 3, 2025
2 business days (counted)
Running total: 71 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 3 → Sep 15, 2025
8 business days (counted)
Running total: 79 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 15 → Sep 15, 2025
0 business days (counted)
Running total: 79 of ? biz days used
Created: Dec 30, 2024 Tech Off Site: Sep 15, 2025
Show SLA Clock Detail (9 periods)
Period Status Clock Biz Days Running Total
Dec 30 → Apr 1 Created ▶ Running 63 63
Apr 1 → Aug 21 Ready for Release ⏸ Paused 99
Aug 21 → Aug 21 Assigned ▶ Running 0 63
Aug 21 → Aug 26 Scheduled ▶ Running 3 66
Aug 26 → Aug 28 Reschedule ▶ Running 2 68
Aug 28 → Aug 29 Scheduled ▶ Running 1 69
Aug 29 → Sep 3 Reschedule ▶ Running 2 71
Sep 3 → Sep 15 Scheduled ▶ Running 8 79
Sep 15 → Sep 15 Tech On Site ▶ Running 0 79
Holding 163.2d (excluded)
Coordinators 20.5d
Field Work 0.6d
Billing 0.1d
✗ SLA Missed
Holding (excluded from total)
163.2 days
Coordinators
20.5 days
Over SLA
Field Work
0.6 days
Billing
0.1 days
Created: Dec 30, 2024 Due: Dec 31, 2025 Completed: Sep 15, 2025 (107 days early)
📅
178.3 days Total Age
⏱️
100.0d in Ready for Release Longest Stage
🔄
11 transitions Status Changes
⚠️
10.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 429 days old
🚨
Primary Delay 100.0 days stuck in "Ready for Release"
⏱️
Total Delay 10.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
100.0d
Scheduled
15.0d / 2.0d SLA
Reschedule
5.5d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Tech Off Site
0.5d / 2.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

8/26 KKelch placed in R/S due to tech needing replacement Surface and CC. SUP CDempsey placed orders for both

8/21 KKelch called site to schedule for 8/25 at 4 pm. Customer confirmed. 

8/20 KKelch called site to schedule for 8/25 at 4 pm. Left VM. 

8/14 KKelch called site to schedule for 8/19 at 11 am. Left VM. 

7/8/25 RCook- LM at 217-341-5276 to discuss scheduling

🔧 Work Performed
Performed pm
🔍 Technician Findings
no issue found
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Higi Station Hardwired

Timeline

📋
Work Order Created Dec 30, 4:49 PM
Work Order: WO-01228972
Type: Preventive Maintenance
Priority: PSM
🚨 63.9 business days
Status: Ready for Release by Stephanie Ramen Apr 1, 12:18 PM
From: On Hold
To: Ready for Release
Duration in Previous: 91d 18h
🚨 100.0 business days
👷
3 Technician Assigned Aug 21, 10:12 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 141d 21h, 0m
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-08-25T21:00:00.000+0000
4.0 business days
🔄
Status: Reschedule by Kaitlyn Kelch Aug 26, 9:06 AM
From: Scheduled
To: Reschedule
Duration in Previous: 4d 22h
3.0 business days
📅
2 Dispatch Scheduled Aug 28, 10:58 AM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Kaitlyn Kelch
From: Reschedule
To: Scheduled
Duration in Previous: 2d 1h
2.0 business days
🔄
Status: Reschedule by Kaitlyn Kelch Aug 29, 3:37 PM
From: Scheduled
To: Reschedule
Duration in Previous: 1d 4h
3.0 business days
📅
2 Dispatch Scheduled Sep 3, 12:13 PM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Kaitlyn Kelch
From: Reschedule
To: Scheduled
Duration in Previous: 4d 20h
📅
Dispatch Scheduled by Kaitlyn Kelch Sep 4, 9:57 AM
Scheduled For: 2025-09-11T17:00:00.000+0000
⚠️ 5.0 business days
📅
Dispatch Scheduled by Kaitlyn Kelch Sep 10, 9:21 AM
Scheduled For: 2025-09-15T17:00:00.000+0000
2.0 business days
📅
2 Dispatch Scheduled Sep 11, 12:52 PM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-09-15T15:30:00.000+0000
3.0 business days
🔧
Status: Tech On Site by Kevin Cox Sep 15, 2:50 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 12d 2h
🚗
Status: Tech Off Site by Kevin Cox Sep 15, 3:34 PM
From: Tech On Site
To: Tech Off Site
Duration in Previous: 43m
⏱️
2 3x Labor Added Sep 15, 7:50 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Kevin Cox
From: Tech Off Site, Completed
To: Completed, Closed
Duration in Previous: 4h 20m
📄
Status: Ready to Bill by Timothy Amburgey Sep 16, 8:54 AM
From: Closed
To: Ready to Bill
Duration in Previous: 12h 58m
📨
Status: Invoice Pending by Timothy Amburgey Sep 16, 9:21 AM
From: Ready to Bill, Invoice Pending
To: Invoice Pending, Invoiced
Duration in Previous: 27m, 0m
4.0 business days
🧾
Invoice Created Sep 21, 8:45 PM
Invoice Number: SM-241037

Bottlenecks

Scheduled
Duration: 4.0 business days (threshold: 2.0 business days)
Exceeded by 2.0 business days
Reschedule
Duration: 3.0 business days (threshold: 2.0 business days)
Exceeded by 1.0 business days
Reschedule
Duration: 2.5 business days (threshold: 2.0 business days)
Exceeded by 4.4 business hours
Scheduled
Duration: 9.0 business days (threshold: 2.0 business days)
Exceeded by 7.0 business days
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.1 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Kevin Cox
Scheduled
Sep 15, 11:30 AM
Created
Dec 30, 4:49 PM
Invoice #
SM-241037

Work Details (3)

Name Type Status Qty Amount Date
WL-02936626 Labor Open 2.1666666666667 $0.00 Sep 15, 7:50 PM
WL-02936627 Labor Open 0.83333333333333 $0.00 Sep 15, 7:50 PM
WL-02936628 Travel Open 121 $0.00 Sep 15, 7:50 PM

Details