Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01229052 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Iles Park Place Building #400 - Aetna — 600 E Ash St, Springfield IL

Dec 30, 2024 → Dec 30, 2025

✅ Completed
PSM
SLA Clock
Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (150 biz days late)
Active: 152 biz days
Paused: 98 biz days
🕐 Clock stopped: Completed (Dec 31, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸98d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Aug 20, 2025
98 business days (not counted)
72d
▶ Clock Running
Status: On Hold
Aug 20 → Dec 5, 2025
72 business days (counted)
Running total: 135 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 5 → Dec 5, 2025
0 business days (counted)
Running total: 135 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 5 → Dec 16, 2025
7 business days (counted)
Running total: 142 of ? biz days used
▶ Clock Running
Status: Scheduled
Dec 16 → Dec 30, 2025
9 business days (counted)
Running total: 151 of ? biz days used
▶ Clock Running
Status: Tech On Site
Dec 30 → Dec 31, 2025
1 business day (counted)
Running total: 152 of ? biz days used
Created: Dec 30, 2024 Completed: Dec 31, 2025
Show SLA Clock Detail (7 periods)
Period Status Clock Biz Days Running Total
Dec 30 → Apr 1 Created ▶ Running 63 63
Apr 1 → Aug 20 Ready for Release ⏸ Paused 98
Aug 20 → Dec 5 On Hold ▶ Running 72 135
Dec 5 → Dec 5 Ready for Scheduling ▶ Running 0 135
Dec 5 → Dec 16 Assigned ▶ Running 7 142
Dec 16 → Dec 30 Scheduled ▶ Running 9 151
Dec 30 → Dec 31 Tech On Site ▶ Running 1 152
Holding 234.9d (excluded)
Coordinators 17.9d
Field Work 0.6d
Billing 0.4d
✗ SLA Missed
Holding (excluded from total)
234.9 days
Coordinators
17.9 days
Over SLA
Field Work
0.6 days
Billing
0.4 days
Created: Dec 30, 2024 Due: Dec 31, 2025 Completed: Dec 31, 2025 (on time)
📅
249.4 days Total Age
⏱️
99.0d in Ready for Release Longest Stage
🔄
11 transitions Status Changes
⚠️
15.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 429 days old
🚨
Primary Delay 99.0 days stuck in "Ready for Release"
⏱️
Total Delay 15.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
136.0d
Ready for Release
99.0d
Ready for Scheduling
0.0d / 1.0d SLA
Assigned
7.9d / 0.5d SLA
Scheduled
10.0d / 2.0d SLA
Tech On Site
0.6d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.4d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

12/16/2025 LHill-rec'd call from Brandon Jennings at 217-725-0928. Tech can come onsite anytime. Go to Security Guard and they will show him to the HIGI machine. May need to mention Brandon Jennings name.


12/16/2025 LHill-LM at 217-725-0928 for Warren Evans to try to schedule tech visit.


12/8 KKelch called site to schedule for 12/15 between 12 and 2 pm. Left VM.

12/5 KKelch called site to schedule for 12/15 between 1 and 2 pm. Left VM.

12/5/2025. Updated contact. ALTERNATE # 217-725-0928. RFS


8/20 KKelch called site to schedule for 8/25 at 2:30 pm. Left VM. Placed on hold due to 3 failed attempts to schedule. 

8/14 KKelch called site to schedule for 8/19 at 2 pm. Left VM. 

7/22 KKelch called site to schedule for 8/1 at 12:30 pm. Left VM.

7/8/25 RCook- LM with 217) 725-0928 to discuss scheduling

🔧 Work Performed
Preventive maintenance completed
🔍 Technician Findings
No issue found
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Higi Station Hardwired

Timeline

📋
Work Order Created Dec 30, 4:49 PM
Work Order: WO-01229052
Type: Preventive Maintenance
Priority: PSM
🚨 63.9 business days
Status: Ready for Release by Stephanie Ramen Apr 1, 12:18 PM
From: On Hold
To: Ready for Release
Duration in Previous: 91d 18h
🚨 99.0 business days
⏸️
Status: On Hold by Kaitlyn Kelch Aug 20, 2:24 PM
From: Ready for Release
To: On Hold
Duration in Previous: 141d 2h
🚨 73.0 business days
📅
Status: Ready for Scheduling by Chris Bakkemo Dec 5, 11:50 AM
From: On Hold
To: Ready for Scheduling
Duration in Previous: 106d 22h
👷
2 Technician Assigned Dec 5, 12:09 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 18m
⚠️ 8.0 business days
📅
2 Dispatch Scheduled Dec 16, 11:17 AM
Dispatch Scheduled → Status: Scheduled
🗓️
Status: Scheduled by Kaitlyn Kelch
From: Assigned
To: Scheduled
Duration in Previous: 10d 23h
⚠️ 6.0 business days
📅
Dispatch Scheduled by Kaitlyn Kelch Dec 23, 10:55 AM
Scheduled For: 2025-12-30T19:30:00.000+0000
⚠️ 5.0 business days
🔧
Status: Tech On Site by Kevin Cox Dec 30, 3:29 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 14d 4h
⏱️
3 5x Labor Added Dec 30, 7:56 PM
5x Labor Added → Status: Completed → Status: Closed
✔️
Status: Completed by Kevin Cox
From: Tech On Site
To: Completed
Duration in Previous: 4h 30m
🏁
Status: Closed by Kevin Cox
From: Completed
To: Closed
Duration in Previous: 1m
📄
Status: Ready to Bill by Hannah Shaw Dec 31, 9:15 AM
From: Closed
To: Ready to Bill
Duration in Previous: 13h 14m
📨
2 Status: Invoice Pending Dec 31, 12:28 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 3m
2.0 business days
🧾
Invoice Created Jan 4, 11:49 PM
Invoice Number: SM-250230

Bottlenecks

Assigned
Duration: 7.9 business days (threshold: 4.0 business hours)
Exceeded by 7.4 business days
Scheduled
Duration: 10.0 business days (threshold: 2.0 business days)
Exceeded by 8.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Kevin Cox
Scheduled
Dec 30, 2:30 PM
Created
Dec 30, 4:49 PM
Invoice #
SM-250230

Work Details (5)

Name Type Status Qty Amount Date
WL-03050384 Labor Open 2.25 $0.00 Dec 30, 7:56 PM
WL-03050385 Labor Open 0.91667 $0.00 Dec 30, 7:56 PM
WL-03050386 Labor Open 0.16667 $0.00 Dec 30, 7:56 PM
WL-03050387 Travel Open 2 $0.00 Dec 30, 7:56 PM
WL-03050388 Travel Open 119 $0.00 Dec 30, 7:56 PM

Details