📍 Illinois Department of Corrections Concordia Complex - Aetna — 1301 Concordia Court, Springfield IL, 62702
Dec 30, 2024 → Sep 17, 2025
✅ Completed
PSM
SLA Clock
Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (85 biz days late)
Active: 87 biz days
Paused: 94 biz days
🕐 Clock stopped: Completed (Sep 18, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸94d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Aug 14, 2025
94 business days (not counted)
▶ Clock Running
Status: Assigned
Aug 14 → Aug 14, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Scheduled
Aug 14 → Aug 25, 2025
7 business days (counted)
Running total: 70 of ? biz days used
▶ Clock Running
Status: Reschedule
Aug 25 → Sep 3, 2025
6 business days (counted)
Running total: 76 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 3 → Sep 10, 2025
5 business days (counted)
Running total: 81 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 10 → Sep 17, 2025
5 business days (counted)
Running total: 86 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 17 → Sep 18, 2025
1 business day (counted)
Running total: 87 of ? biz days used
Created: Dec 30, 2024Completed: Sep 18, 2025
Show SLA Clock Detail (8 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 30 → Apr 1
Created
▶ Running
63
63
Apr 1 → Aug 14
Ready for Release
⏸ Paused
94
—
Aug 14 → Aug 14
Assigned
▶ Running
0
63
Aug 14 → Aug 25
Scheduled
▶ Running
7
70
Aug 25 → Sep 3
Reschedule
▶ Running
6
76
Sep 3 → Sep 10
Assigned
▶ Running
5
81
Sep 10 → Sep 17
Scheduled
▶ Running
5
86
Sep 17 → Sep 18
Tech On Site
▶ Running
1
87
Holding158.2d (excluded)
Coordinators26.9d
Field Work0.5d
Billing0.9d
✗ SLA Missed
Holding(excluded from total)
158.2 days
Coordinators
26.9 days
Over SLA
Field Work
0.5 days
Billing
0.9 days
Created: Dec 30, 2024
Due: Dec 31, 2025
Completed: Sep 18, 2025 (104 days early)
📅
180.4 daysTotal Age
⏱️
95.0d in Ready for ReleaseLongest Stage
🔄
11 transitionsStatus Changes
⚠️
20.4d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 429 days old
🚨
Primary Delay95.0 days stuck in "Ready for Release"
⏱️
Total Delay20.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
95.0d
Scheduled
14.0d / 2.0d SLA
Reschedule
6.9d / 2.0d SLA
Assigned
6.0d / 0.5d SLA
Tech On Site
0.5d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
WO Correction Needed
0.5d
Ready to Bill
0.4d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
9/18/25 CDempsey- contacted Tim about this rejection. He is removing correction now that he sees Kevin's note.
9/10 KKelch called Mandy to schedule for 9/17 at 12 pm. Customer confirmed.
9/3 KKelch called Mandy to schedule for 9/9 at 1:30 pm. She is OOO until 9/10.
8/22 KKelch called Mandy to reschedule for 8/28 at 12:30 pm. Left VM.
8/14 KKelch called Mandy to schedule for 8/22 at 11:30 am. Customer confirmed.
7/8/25 RCook- called Mandy Page at 217-588-2200 ext 2100 to discuss scheduling. No answer. Could not leave message.
🔧Work Performed
Pm completed no customer signature. No one was available to sign.
🔍Technician Findings
No issues found
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄Description
Higi Station Hardwired
📋
Outbound to +12175582200
Completed Sep 10, 2025
9/10 KKelch called Mandy to schedule for 9/17 at 12 pm. Customer confirmed.
📋
Outbound to +12175582200
Completed Sep 3, 2025
9/3 KKelch called Mandy to schedule for 9/9 at 1:30 pm. She is OOO until 9/10.
📋
Outbound to +12175582200
Completed Aug 22, 2025
8/22 KKelch called Mandy to reschedule for 8/28 at 12:30 pm. Left VM.
📋
Outbound to +12175582200
Completed Aug 14, 2025
8/14 KKelch called Mandy to schedule for 8/22 at 11:30 am. Customer confirmed.
📋
Outbound to +12175582200
Completed Jul 8, 2025
7/8/25 RCook- called Mandy Page at 217-588-2200 ext 2100 to discuss scheduling. No answer. Could not leave message.
📅
WO-01229061 - Preventive Maintenance - ZT2776-HW - Springfield - Illinois Department of Corrections Concordia Complex - Aetna
Sep 17, 2025 1:00pm – 2:00pm
Work Order: WO-01229061
Account: HIGI LLC
Customer Case Number:
Location: Illinois Department of Corrections Concordia Complex - Aetna
Address: 1301 Concordia Court, Springfield, IL 62702
Manufacturer:
Model #: ZT2776-HW
Serial #: CSA-2018106170
Contact Name:
Contact Phone:
Contact Email:
Due D