Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01231154 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Publix 1498 — 13775 Highway 19 S, Thomasville GA, 31792

Dec 30, 2024 → Sep 24, 2025

✅ Completed
PSM
SLA Clock
Last business day of December 2024 · Target: Dec 31, 2024
✗ SLA Missed (67 biz days late)
Active: 69 biz days
Paused: 116 biz days
🕐 Clock stopped: Completed (Sep 24, 2025)
63d
▶ Clock Running
Status: Created
Dec 30 → Apr 1, 2025
63 business days (counted)
Running total: 63 of ? biz days used
⏸116d
⏸ Clock Paused
Status: Ready for Release
Apr 1 → Sep 16, 2025
116 business days (not counted)
▶ Clock Running
Status: Assigned
Sep 16 → Sep 16, 2025
0 business days (counted)
Running total: 63 of ? biz days used
▶ Clock Running
Status: Scheduled
Sep 16 → Sep 24, 2025
6 business days (counted)
Running total: 69 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 24 → Sep 24, 2025
0 business days (counted)
Running total: 69 of ? biz days used
Created: Dec 30, 2024 Completed: Sep 24, 2025
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Dec 30 → Apr 1 Created ▶ Running 63 63
Apr 1 → Sep 16 Ready for Release ⏸ Paused 116
Sep 16 → Sep 16 Assigned ▶ Running 0 63
Sep 16 → Sep 24 Scheduled ▶ Running 6 69
Sep 24 → Sep 24 Tech On Site ▶ Running 0 69
Holding 180.2d (excluded)
Coordinators 6.7d
Field Work 0.7d
Billing 0.2d
✗ SLA Missed
Holding (excluded from total)
180.2 days
Coordinators
6.7 days
Over SLA
Field Work
0.7 days
Billing
0.2 days
Created: Dec 30, 2024 Due: Dec 31, 2025 Completed: Sep 25, 2025 (97 days early)
📅
185.3 days Total Age
⏱️
117.0d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
4.6d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 429 days old
🚨
Primary Delay 117.0 days stuck in "Ready for Release"
⏱️
Total Delay 4.6 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
63.3d
Ready for Release
117.0d
Assigned
0.0d / 0.5d SLA
Scheduled
6.6d / 2.0d SLA
Tech On Site
0.2d / 1.0d SLA
Completed
0.6d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.2d / 1.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
PM Service
🔍 Technician Findings
Fully functioning Kiosk
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from Checklist Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance%20009%20DCR652.pdf
📄 Description
Higi Green Kiosk with a Wifi Installed and Storm Key pad

Timeline

📋
Work Order Created Dec 30, 4:52 PM
Work Order: WO-01231154
Type: Preventive Maintenance
Priority: PSM
🚨 63.9 business days
Status: Ready for Release by Stephanie Ramen Apr 1, 12:17 PM
From: On Hold
To: Ready for Release
Duration in Previous: 91d 18h
🚨 117.0 business days
👷
2 Technician Assigned Sep 16, 2:33 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Abby Jinerson
From: Ready for Release
To: Assigned
Duration in Previous: 168d 2h
🗓️
2 Status: Scheduled Sep 16, 2:48 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Abby Jinerson
Scheduled For: 2025-09-23T16:00:00.000+0000
📅
Dispatch Scheduled by Abby Jinerson Sep 16, 2:57 PM
Scheduled For: 2025-09-24T16:00:00.000+0000
📅
2 Dispatch Scheduled Sep 17, 10:34 AM
Dispatch Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Abby Jinerson
Scheduled For: 2025-09-24T17:00:00.000+0000
⚠️ 6.0 business days
📅
Dispatch Scheduled by Rob Rivera Sep 24, 9:37 AM
Scheduled For: 2025-09-24T19:00:00.000+0000
🔧
Status: Tech On Site by Rob Rivera Sep 24, 2:26 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 23h
✔️
Status: Completed by Rob Rivera Sep 24, 3:44 PM
From: Tech On Site
To: Completed
Duration in Previous: 1h 17m
⏱️
3x Labor Added Sep 24, 8:14 PM
Type: Labor, Travel
Status: Open
Qty: 1, 40
🏁
Status: Closed by Rob Rivera Sep 24, 8:22 PM
From: Completed
To: Closed
Duration in Previous: 4h 38m
📄
Status: Ready to Bill by Hannah Shaw Sep 25, 9:35 AM
From: Closed
To: Ready to Bill
Duration in Previous: 13h 12m
📨
Status: Invoice Pending by Hannah Shaw Sep 25, 10:58 AM
From: Ready to Bill, Invoice Pending
To: Invoice Pending, Invoiced
Duration in Previous: 1h 23m, 0m
2.0 business days
🧾
Invoice Created Sep 28, 12:14 PM
Invoice Number: SM-241935

Bottlenecks

Scheduled
Duration: 6.6 business days (threshold: 2.0 business days)
Exceeded by 4.6 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Robert Rivera
Scheduled
Sep 24, 3:00 PM
Created
Dec 30, 4:52 PM
Invoice #
SM-241935

Work Details (3)

Name Type Status Qty Amount Date
WL-02948286 Labor Open 1 $0.00 Sep 24, 8:14 PM
WL-02948287 Travel Open 40 $0.00 Sep 24, 8:14 PM
WL-02948288 Labor Open 1 $0.00 Sep 24, 8:14 PM

Details