📍 CVS - CVS-07021 — 2203 Wayne Memorial Drive, Goldsboro NC, 27534
Jan 2, 2025 → Jan 2, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2025 · Target: Jan 31, 2025
✗ SLA Missed (217 biz days late)
Active: 238 biz days
Paused: 11 biz days
🕐 Clock stopped: Completed (Jan 2, 2026)
236d
▶ Clock Running
Status: Created
Jan 2 → Dec 12, 2025
236 business days (counted)
Running total: 236 of ? biz days used
⏸ Clock Paused
Status: Ready for Release
Dec 12 → Dec 30, 2025
11 business days (not counted)
▶ Clock Running
Status: Assigned
Dec 30 → Dec 30, 2025
0 business days (counted)
Running total: 236 of ? biz days used
▶ Clock Running
Status: Scheduled
Dec 30 → Jan 2, 2026
2 business days (counted)
Running total: 238 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 2 → Jan 2, 2026
0 business days (counted)
Running total: 238 of ? biz days used
Created: Jan 2, 2025Completed: Jan 2, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 2 → Dec 12
Created
▶ Running
236
236
Dec 12 → Dec 30
Ready for Release
⏸ Paused
11
—
Dec 30 → Dec 30
Assigned
▶ Running
0
236
Dec 30 → Jan 2
Scheduled
▶ Running
2
238
Jan 2 → Jan 2
Tech On Site
▶ Running
0
238
Holding248.2d (excluded)
Coordinators2.9d
Field Work0.4d
Billing20.0d
✗ SLA Missed
Holding(excluded from total)
248.2 days
Coordinators
2.9 days
Over SLA
Field Work
0.4 days
Billing
20.0 days
Over SLA
Created: Jan 2, 2025
Due: Dec 31, 2026
Completed: Jan 3, 2026 (362 days early)
📅
249.5 daysTotal Age
⏱️
236.5d in On HoldLongest Stage
🔄
9 transitionsStatus Changes
⚠️
19.9d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 426 days old
🚨
Primary Delay236.5 days stuck in "On Hold"
⏱️
Total Delay19.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
236.5d
Ready for Release
11.7d
Assigned
0.0d / 0.5d SLA
Scheduled
2.9d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.3d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
20.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
1/2/26 PC- PM
Technician Findings upon arrival: No unit on-site
Actions Taken/Work Performed: Went to pharmacy area and no unit was there. Spoke to store manager and was told unit was not there. I check the back of store not on-site.
Final Resolution: No unit on-site.
🔍Technician Findings
1/2/26 PC- PM
Technician Findings upon arrival: No unit on-site
Actions Taken/Work Performed: Went to pharmacy area and no unit was there. Spoke to store manager and was told unit was not there. I check the back of store not on-site.
Final Resolution: No unit on-site.
⚠️Problem Description
Please Perform PM: PM Checklist can be found as a link in the work order under WO actions
If Kiosk is not on the Sales floor request to speak to a manager to find out if kiosk is being stored in the back room or if it was disposed. Offer to help bring the kiosk to the salesfloor or advise that EMSAR can replace a disposed kiosk. If store does not want to bring the kiosk out of storage or if kiosk was disposed, close out work order with Repair code '37 Store intervention required' and document who you spoke with and outcome of conversation. Labor line shall be a trip charge.
***Important: Please make sure to document if kiosk is disposed or in storage***
If kiosk fails a PM, checklist is still required to be completed. Please use Code 35 - Follow up needed and detail in the Tech Findings, Work Performed and Final condition the result and cause for a follow up. Close out the work order. Dispatch will create a follow up repair work order to send parts.