Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01281876 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 UNIVERSITY OF CINCINNATI MEDICAL CENTER — 331 ALBERT SABIN WAY, CINCINNATI OH, 45229

Jun 19, 2025 → Oct 30, 2025

✅ Completed
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (60 biz days early)
Active: 7 biz days
Paused: 85 biz days
🕐 Clock stopped: Completed (Oct 30, 2025)
▶ Clock Running
Status: Created
Jun 19 → Jun 19, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸85d
⏸ Clock Paused
Status: Ready for Release
Jun 19 → Oct 21, 2025
85 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Oct 21 → Oct 21, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Scheduled
Oct 21 → Oct 30, 2025
7 business days (counted)
Running total: 7 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 30 → Oct 30, 2025
0 business days (counted)
Running total: 7 of ? biz days used
Created: Jun 19, 2025 Completed: Oct 30, 2025
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jun 19 → Jun 19 Created ▶ Running 0 0
Jun 19 → Oct 21 Ready for Release ⏸ Paused 85
Oct 21 → Oct 21 Ready for Scheduling ▶ Running 0 0
Oct 21 → Oct 30 Scheduled ▶ Running 7 7
Oct 30 → Oct 30 Tech On Site ▶ Running 0 7
Holding 85.0d (excluded)
Coordinators 8.1d
Field Work 0.0d
Billing 3.0d
✓ SLA Met
Holding (excluded from total)
85.0 days
Coordinators
8.1 days
Over SLA
Field Work
0.0 days
Billing
3.0 days
Over SLA
Created: Jun 19, 2025 Due: Jan 31, 2026 Completed: Oct 30, 2025 (93 days early)
📅
92.0 days Total Age
⏱️
85.0d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
8.5d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 258 days old
🚨
Primary Delay 85.0 days stuck in "Ready for Release"
⏱️
Total Delay 8.5 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
85.0d
Ready for Scheduling
0.3d / 1.0d SLA
Scheduled
7.8d / 2.0d SLA
Tech On Site
0.0d / 1.0d SLA
Closed
1.7d / 1.0d SLA
Ready to Bill
3.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
10/21/2025 DMalloy - Emailed customer advising that FSE Eric can be onsite on next week Monday 10/27/2025 for the 21 devices. michael.galloway@gehealthcare.com 10/21/2025 MK rcvd email from Mike Galloway, confirm devices. .. 10/20/2025 mklose called 1-262-794-7501; Mike Galloway. michael.galloway@gehealthcare.com. email Mike and he wiill reach out tomorrow, with a list of where all devices are and wil schedule. 10/20/2025 mklose called 1-859-274-6342 Ryan Mullins, ryan.mullins1@gehealthcare.com, LVM 10/15/2025 mklose emailed Joseph; Joseph.Hinton@gehealthcare.com, and Tyler; tyler.martinez@gehealthcare.com ... 09/03/2025 RFosbury - rec'd email from Steve stating he no longer supports for this region, he looped in ASLs Hinton, Joseph and Martinez, Tyler ... 09/03/2025 RFosbury called Steve Steinhaus, Field Support Spec GEHC @ 414-530-8334, left VM and followed up with email to Steve.steinhaus@gehealthcare.com.
🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions. Verification Test: Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
78101
⚠️ Problem Description
FMI 78101E: Venue Fit Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.4.3 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Fit Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Jun 19, 2:26 PM
Work Order: WO-01281876
Type: FCO
Priority: PC
Status: Ready for Release by Allison Belyea Jun 19, 3:09 PM
From: Entered
To: Ready for Release
Duration in Previous: 42m
🚨 85.0 business days
📅
Status: Ready for Scheduling by Megan Klose Oct 21, 11:27 AM
From: Ready for Release
To: Ready for Scheduling
Duration in Previous: 123d 20h
👷
3 Technician Assigned Oct 21, 1:32 PM
Technician Assigned → Status: Scheduled → Dispatch Scheduled
🗓️
Status: Scheduled by Erin Martin
From: Ready for Scheduling
To: Scheduled
Duration in Previous: 2h 4m
📅
Dispatch Scheduled by Erin Martin
Scheduled For: 2025-10-27T12:00:00.000+0000
⚠️ 8.0 business days
🔧
Status: Tech On Site by Eric Mancerella Oct 30, 2:00 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 9d 0h
⏱️
2x Labor Added Oct 30, 2:14 PM
Type: Labor, Parts
Status: Open
Qty: 1.5
✔️
Status: Completed by Eric Mancerella Oct 30, 2:21 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 20m
⏱️
2 Labor Added Oct 31, 11:10 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 20h 50m
3.0 business days
📨
Status: Invoice Pending by Timothy Amburgey Nov 4, 1:02 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 4d 2h
💰
Status: Invoiced by Timothy Amburgey Nov 4, 1:14 PM
From: Invoice Pending
To: Invoiced
Duration in Previous: 11m
3.0 business days
🧾
Invoice Created Nov 6, 12:43 PM
Invoice Number: SM-245560

Bottlenecks

Scheduled
Duration: 7.8 business days (threshold: 2.0 business days)
Exceeded by 5.8 business days
Closed
Duration: 1.7 business days (threshold: 1.0 business days)
Exceeded by 5.6 business hours
Ready to Bill
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PC
Type
FCO
Branch
N/A
Technician
Eric Mancerella
Scheduled
Oct 27, 8:00 AM
Created
Jun 19, 2:26 PM
Invoice #
SM-245560

Work Details (3)

Name Type Status Qty Amount Date
WL-02990021 Labor Open 1.5 $100.00 Oct 30, 2:14 PM
WL-02990022 Parts Open 1 $0.00 Oct 30, 2:14 PM
WL-02991549 Labor Open 0.016666666666667 $38.00 Oct 31, 11:10 AM

Details