Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01282894 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 BAYSTATE MEDICAL CENTER INC — 759 CHESTNUT ST, SPRINGFIELD MA, 01199

Jun 19, 2025 → Feb 4, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✗ SLA Missed
Active: 139 biz days
Paused: 16 biz days
🕐 Clock stopped: Tech Off Site (Feb 4, 2026)
▶ Clock Running
Status: Created
Jun 19 → Jun 19, 2025
0 business days (counted)
Running total: 0 of ? biz days used
⏸16d
⏸ Clock Paused
Status: Ready for Release
Jun 19 → Jul 14, 2025
16 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Jul 14 → Jul 28, 2025
10 business days (counted)
Running total: 10 of ? biz days used
33d
▶ Clock Running
Status: Scheduled
Jul 28 → Sep 12, 2025
33 business days (counted)
Running total: 43 of ? biz days used
▶ Clock Running
Status: Assigned
Sep 12 → Sep 12, 2025
0 business days (counted)
Running total: 43 of ? biz days used
▶ Clock Running
Status: Entered
Sep 12 → Sep 12, 2025
0 business days (counted)
Running total: 43 of ? biz days used
92d
▶ Clock Running
Status: Ready for Scheduling
Sep 12 → Jan 29, 2026
92 business days (counted)
Running total: 135 of ? biz days used
▶ Clock Running
Status: Assigned
Jan 29 → Jan 29, 2026
0 business days (counted)
Running total: 135 of ? biz days used
▶ Clock Running
Status: Scheduled
Jan 29 → Feb 4, 2026
4 business days (counted)
Running total: 139 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 4 → Feb 4, 2026
0 business days (counted)
Running total: 139 of ? biz days used
Created: Jun 19, 2025 Tech Off Site: Feb 4, 2026
Show SLA Clock Detail (10 periods)
Period Status Clock Biz Days Running Total
Jun 19 → Jun 19 Created ▶ Running 0 0
Jun 19 → Jul 14 Ready for Release ⏸ Paused 16
Jul 14 → Jul 28 Ready for Scheduling ▶ Running 10 10
Jul 28 → Sep 12 Scheduled ▶ Running 33 43
Sep 12 → Sep 12 Assigned ▶ Running 0 43
Sep 12 → Sep 12 Entered ▶ Running 0 43
Sep 12 → Jan 29 Ready for Scheduling ▶ Running 92 135
Jan 29 → Jan 29 Assigned ▶ Running 0 135
Jan 29 → Feb 4 Scheduled ▶ Running 4 139
Feb 4 → Feb 4 Tech On Site ▶ Running 0 139
Holding 16.0d (excluded)
Coordinators 142.3d
Field Work 0.2d
✗ SLA Missed
Holding (excluded from total)
16.0 days
Coordinators
142.3 days
Over SLA
Field Work
0.2 days
Created: Jun 19, 2025 Due: Jan 31, 2026 (33 days overdue)
📅
155.0 days Total Age
⏱️
92.6d in Ready for Scheduling Longest Stage
🔄
11 transitions Status Changes
⚠️
139.7d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
2 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Behind Schedule - Needs Attention
Ready to Bill • 258 days old
🚨
Primary Delay 92.6 days stuck in "Ready for Scheduling"
⏱️
Total Delay 139.7 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
16.0d
Ready for Scheduling
103.6d / 1.0d SLA
Scheduled
38.4d / 2.0d SLA
Assigned
0.2d / 0.5d SLA
Tech On Site
0.2d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
4.6d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
01/29/2026 Mklose rcvd email from POC confirm Joseph Feb 4th. 01/29/2026 Mklose called (774) 786-0316, (413) 794-0774, (413) 896-9708, left VM, 01/28/2026 Mklose called Nigel, he adv he is retiring, Kristen Steele would be POC. called 413-896-9708, no answer resent email 01/16/2026 Mklose called Nigel, offered January 22nd 01/12/2026 Mklose emailed and offered April January 13th, 11/11/2025 Brod - called nigel to schedule FSE onsite for 11/12 for ULS PMs and to start remediation on batteries. he stated he will follow up with me . following up in email. *** 09/12/2025 Brod - emailed Niigel to let him know FSE is behind schedule per Fady, we will reach out at a later date to schedule the remaining 18 units. **** 07/22/2025 Brod - rec'd email reply from Nigel confirming scheduled date 07/24/2025; called 413-896-9104 to speak to Nigel, went to vm left message to have FSE onsite for 07/24. following up in email to nigel.cubin@baystatehealth.org 07/09/2025 Brod - received email back from Nigel confirming , i offered 07/15 to have FSE onsite. ... 07/03/2025 MHamersley - called 413-896-9104, spoke to Nigel, he is POC for several Baystate Medical locations, sent him excel list of 34 serial numbers; email: nigel.cubin@baystatehealth.org
🔧 Work Performed
Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
🔍 Technician Findings
Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
⚠️ Problem Description
FMI 78101D: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 ? OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Go Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Jun 19, 2:28 PM
Work Order: WO-01282894
Type: FCO
Priority: PC
Status: Ready for Release by Allison Belyea Jun 19, 3:07 PM
From: Entered
To: Ready for Release
Duration in Previous: 39m
🚨 16.0 business days
📅
Status: Ready for Scheduling by Mary Hamersley Jul 14, 11:25 AM
From: Ready for Release
To: Ready for Scheduling
Duration in Previous: 24d 20h
🚨 11.0 business days
👷
3 Technician Assigned Jul 28, 3:30 PM
Technician Assigned → Status: Scheduled → Dispatch Scheduled
🗓️
Status: Scheduled by Erin Martin
From: Ready for Scheduling
To: Scheduled
Duration in Previous: 14d 4h
📅
Dispatch Scheduled by Erin Martin
Scheduled For: 2025-08-11T12:00:00.000+0000
🚨 16.0 business days
📅
Dispatch Scheduled by Brandi Rodriguez Aug 18, 11:38 AM
Scheduled For: 2025-08-25T12:00:00.000+0000
⚠️ 5.0 business days
📅
Dispatch Scheduled by Brandi Rodriguez Aug 22, 11:33 AM
Scheduled For: 2025-09-03T12:00:00.000+0000
4.0 business days
📅
Dispatch Scheduled by Brandi Rodriguez Aug 27, 12:47 PM
Scheduled For: 2025-09-17T12:00:00.000+0000
🚨 12.0 business days
👷
Status: Assigned by Brandi Rodriguez Sep 12, 1:16 PM
From: Scheduled
To: Assigned
Duration in Previous: 45d 21h
🆕
Status: Entered by Brandi Rodriguez Sep 12, 2:52 PM
From: Assigned, Entered
To: Entered, Ready for Scheduling
Duration in Previous: 1h 36m, 0m
🚨 93.0 business days
👷
2 Technician Assigned Jan 29, 11:54 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Megan Klose
From: Ready for Scheduling
To: Assigned
Duration in Previous: 138d 22h
🗓️
2 Status: Scheduled Jan 29, 12:00 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Megan Klose
Scheduled For: 2026-02-05T14:00:00.000+0000
⚠️ 5.0 business days
📅
Dispatch Scheduled by Joseph Nuovo Feb 4, 9:46 AM
Scheduled For: 2026-02-04T14:00:00.000+0000
🔧
Status: Tech On Site by Joseph Nuovo Feb 4, 12:40 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 6d 0h
⏱️
3 Labor Added Feb 4, 2:15 PM
Labor Added → Status: Tech Off Site → Status: Closed
🚗
Status: Tech Off Site by Joseph Nuovo
From: Tech On Site, Tech Off Site
To: Tech Off Site, Completed
Duration in Previous: 1h 35m, 0m
🏁
Status: Closed by Joseph Nuovo
From: Completed
To: Closed
Duration in Previous: 0m
⚠️ 5.0 business days
⏱️
2 Labor Added Feb 10, 10:13 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 5d 19h

Bottlenecks

Ready for Scheduling
Duration: 11.0 business days (threshold: 1.0 business days)
Exceeded by 10.0 business days
Scheduled
Duration: 33.6 business days (threshold: 2.0 business days)
Exceeded by 31.6 business days
Ready for Scheduling
Duration: 92.6 business days (threshold: 1.0 business days)
Exceeded by 91.6 business days
Scheduled
Duration: 4.9 business days (threshold: 2.0 business days)
Exceeded by 2.9 business days
Closed
Duration: 4.6 business days (threshold: 1.0 business days)
Exceeded by 3.6 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Joseph Nuovo
Scheduled
Feb 4, 9:00 AM
Created
Jun 19, 2:28 PM
Invoice #
N/A

Work Details (2)

Name Type Status Qty Amount Date
WL-03091372 Labor Open 1 $100.00 Feb 4, 2:15 PM
WL-03098926 Labor Open 0.016666666666667 $38.00 Feb 10, 10:13 AM

Details