Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01300185 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD) • Overhaul • PSM

📍 Dow Chemical Co — 6413 E Hwy 332, Freeport TX, 77541

Aug 28, 2025 → Sep 17, 2025

✅ Completed
PSM
SLA Clock
Last business day of August 2025 · Target: Aug 29, 2025
✗ SLA Missed (13 biz days late)
Active: 15 biz days
🕐 Clock stopped: Completed (Sep 19, 2025)
▶ Clock Running
Status: Created
Aug 28 → Aug 28, 2025
0 business days (counted)
Running total: 0 of ? biz days used
10d
▶ Clock Running
Status: Assigned
Aug 28 → Sep 12, 2025
10 business days (counted)
Running total: 10 of ? biz days used
5d
▶ Clock Running
Status: Tech On Site
Sep 12 → Sep 19, 2025
5 business days (counted)
Running total: 15 of ? biz days used
Created: Aug 28, 2025 Completed: Sep 19, 2025
Show SLA Clock Detail (3 periods)
Period Status Clock Biz Days Running Total
Aug 28 → Aug 28 Created ▶ Running 0 0
Aug 28 → Sep 12 Assigned ▶ Running 10 10
Sep 12 → Sep 19 Tech On Site ▶ Running 5 15
Dispatch 0.0d
Coordinators 10.8d
Field Work 6.0d
Billing 2.4d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
10.8 days
Over SLA
Field Work
6.0 days
Over SLA
Billing
2.4 days
Over SLA
Created: Aug 28, 2025 Due: Sep 28, 2025 Completed: Sep 17, 2025 (11 days early)
📅
13.8 days Total Age
⏱️
10.8d in Assigned Longest Stage
🔄
8 transitions Status Changes
⚠️
15.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
9 lines Work Details
🏠
2 visits On-Site Trips
📋
Coordinator Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1 Sep 12, 2025
Visit 2 Sep 16, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 188 days old
🚨
Primary Delay 10.8 days stuck in "Assigned"
⏱️
Total Delay 15.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
10.8d / 0.5d SLA
Tech On Site
6.0d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
2.4d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
9/11/2025 Evaluated. 9/12/2025 Support bracket by spec-tube broken at both ends. Used torr seal to repair. Cleaned spec-tube, replaced stack and filaments. Tested. Replaced turbo pump. 9/15/2025 Replaced filaments after gain of 7 with both filaments. 9/16/2025 Recleaned spec-tube and replaced filaments again, tested OK. Valve block cleaned, new O-rings and valve pads. New internal leak and TC. Started unit. Touch number are all to the left. Perform fine test procedure, record parameter, Chart record MDL/Helium Stability. Unit leak check ok shut off unit, pack it up, ship unit back to customer.
🔍 Technician Findings
BAD TURBO PUMP.
⚠️ Problem Description
Note 05.06.2025 14:23:10 WIGEORGE see attachment ____________________ Note 05.06.2025 14:13:15 WF-BATCH Agent: WIGEORGE Timestamp: 2025-06-05 14:13:09 NOnce the quotation has been accepted, please create a service order, and assign it to the service employee group 98004017 Trade services; if a "Request for RA" form is returned with the purchase order, please attach it to the notification e-mail. bench overhaul slow to vent; intermittent lockup of vent/test; test port pressure inconsistent
📄 Description
VS MR15 Mobile Leak Detector
📞 Call Description
VPD Bench Overhaul Trade

Timeline

📋
3 Work Order Created Aug 28, 1:27 PM
Work Order Created → Technician Assigned → Status: Assigned
👷
Technician Assigned by Kim Pearson
Technician: a0hF0000002XLPBIA4, Minh Huynh
👷
Status: Assigned by Kim Pearson
From: Entered
To: Assigned
Duration in Previous: 1m
🚨 11.0 business days
🔧
Status: Tech On Site by Charles Sellon Sep 12, 11:38 AM
From: Assigned
To: Tech On Site
Duration in Previous: 14d 22h
⏱️
6x Labor Added Sep 12, 12:00 PM
Type: Labor, Parts
Status: Open
Qty: 6, 2, 1
2.0 business days
🔩
Parts Added Sep 15, 1:27 PM
Type: Parts
Status: Open
Qty: 2
2.0 business days
⏱️
2x Labor Added Sep 16, 3:05 PM
Type: Labor, Parts
Status: Open
Qty: 6, 1
4.0 business days
✔️
2 Status: Completed Sep 19, 9:30 AM
Status: Completed → Status: Closed
🏁
Status: Closed by Minh Huynh
From: Completed
To: Closed
Duration in Previous: 4m
1.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA Sep 21, 11:43 AM
From: Closed
To: Ready to Bill
Duration in Previous: 2d 2h
1.0 business days
💵
Status: Billing Review by Hannah Shaw Sep 22, 4:28 PM
From: Ready to Bill, Billing Review
To: Billing Review, Ready to Bill
Duration in Previous: 1d 4h, 0m
📨
2 Status: Invoice Pending Sep 23, 3:38 PM
Status: Invoice Pending → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 2m
🧾
Invoice Created Sep 24, 10:38 AM
Invoice Number: SM-241826

Bottlenecks

Assigned
Duration: 10.8 business days (threshold: 4.0 business hours)
Exceeded by 10.3 business days
Tech On Site
Duration: 6.0 business days (threshold: 1.0 business days)
Exceeded by 5.0 business days
Ready to Bill
Duration: 1.4 business days (threshold: 1.0 business days)
Exceeded by 3.5 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Overhaul
Branch
ERLA - PROD
Technician
Minh Huynh
Scheduled
N/A
Created
Aug 28, 1:27 PM
Invoice #
SM-241826

Work Details (9)

Name Type Status Qty Amount Date
WL-02933993 Labor Open 6 $960.00 Sep 12, 12:00 PM
WL-02933994 Parts Open 2 $0.00 Sep 12, 12:00 PM
WL-02933995 Parts Open 1 $0.00 Sep 12, 12:00 PM
WL-02933996 Parts Open 1 $0.00 Sep 12, 12:00 PM
WL-02933997 Parts Open 1 $0.00 Sep 12, 12:00 PM
WL-02933998 Parts Open 1 $0.00 Sep 12, 12:00 PM
WL-02936082 Parts Open 2 $0.00 Sep 15, 1:27 PM
WL-02937434 Labor Open 6 $0.00 Sep 16, 3:05 PM
WL-02937435 Parts Open 1 $0.00 Sep 16, 3:05 PM

Details