Created: Sep 4, 2025
Due: Nov 30, 2025
Completed: Nov 5, 2025 (25 days early)
📅
44.0 daysTotal Age
⏱️
28.0d in Ready for SchedulingLongest Stage
🔄
8 transitionsStatus Changes
⚠️
41.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 181 days old
🚨
Primary Delay28.0 days stuck in "Ready for Scheduling"
⏱️
Total Delay41.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Release
17.0d
Ready for Scheduling
28.0d / 1.0d SLA
Scheduled
0.3d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.4d / 1.0d SLA
Ready to Bill
15.6d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
09/26/2025 Mklose, per email from 09/09/2025 Brittani, Penix confirmed Devices, brittani.penix@nationwidechildrens.org ... 09/09/2025 MHamersley - called 614-355-1754, call went to Brittani's VM/LM; recd new POC info from GE: Brittani Penix, Medical Equipment Fleet Manager; sent email: brittani.penix@nationwidechildrens.org ... 08/28/2025 ABelyea - per Tabitha, ok to start calling on Nationwide now ... 07/17/2025 ABelyea - Per Tabitha Wright, placing FMI 32097 for this site On Hold until further notice ... 07/14/2025 MHamersley - called 614-234-7354, call went to Nolan's VM/LM; sent f/u email: nfuller2@mchs.com 07/09/2025 MHamersley - called 614-234-7354, call went to Nolan's VM/LM; sent f/u email: nfuller2@mchs.com 06/20/2025 MHamersley - called 614-234-7354, call went to Nolan's VM/LM; sent f/u email: nfuller2@mchs.com 06/10/2025 MHamersley - called 614-234-7354, call went to Nolan's VM/LM; sent f/u email: nfuller2@mchs.com 05/30/2025 MHamersley - called 614-234-7354, spoke to Nolan; sent email: nfuller2@mchs.com
🔧Work Performed
Template Name: FMI32097_Code 1_inspect.
Template Description: FMI32097_Code 1_inspect.
Problem Found: FMI32097_Heater door inspection.
Action Taken: FMI 32097 completed. Inspected the Heater doors and confirmed screws tightened to the specification.
Verification Test:
1. Verified the canopy moves smoothly.
2. Verified transition mode message is not present.
3. Verified doors close smoothly.
4. Verified corner pins are aligned.
5. Verified no alarms.
The device has passed all tests and is ready for customer use.
🔍Technician Findings
nr
⚠️Problem Description
FMI 32097:- Inspection of heater door screws for Giraffe OmniBed and Giraffe OmniBed Carestation Purpose:- Certain Giraffe OmniBed and Giraffe OmniBed Carestation may have defective heater doors due to improper torquing of heater door screws. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at tcs.fmiadmins@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄Description
GE Healthcare Giraffe OmniBed Carestation CS1
📞Call Description
FMI 32097
📧
Email_FCO Updates
Completed Sep 26, 2025
09/26/2025 Mklose, per email from 09/09/2025 Brittani, Penix confirmed Devices, brittani.penix@nationwidechildrens.org, updated all notes and changed status to ready for scheduling.