Created: Sep 25, 2025
Due: Oct 31, 2025
Completed: Oct 8, 2025 (23 days early)
📅
9.5 daysTotal Age
⏱️
5.7d in AssignedLongest Stage
🔄
10 transitionsStatus Changes
⚠️
8.6d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
8 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 160 days old
🚨
Primary Delay5.7 days stuck in "Assigned"
⏱️
Total Delay8.6 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Ready for Scheduling
1.5d / 1.0d SLA
Assigned
5.7d / 0.5d SLA
Scheduled
3.0d / 2.0d SLA
Tech On Site
0.5d / 1.0d SLA
Completed
1.4d / 1.0d SLA
Closed
3.6d / 1.0d SLA
L2 Review
0.4d
💬 Activities, Notes & Communications
🔒Internal CSA Notes
10/3/2025 CRamen spoke with Matthew Herring 864-710-5231 and scheduled for tech to arrive directly from airport eta around noon on Tuesday 10/7 to PM 1 unit and arriva around 8am on Wednesday 10/8 to PM the other. Tech to drive past employee parking to top of the hill to the facility. Tech to check in with security and state that hes there to see Matt Herring in the lap to PM Xylem unit. Tech will need steel toed boots and safety glasses but if he doesnt have them facility will provide slip-ons and safety glasses. Tech to bring in as little tools as possible for security screening. Tech will have to watch a safety video followed by a 5 question test prior to Matt getting call to get tech. This is a 24hr facility. Call logged on WO-01306276.
10/2/2025 Bill emailed to call 740-336-2537. Called and left a vm for Bill to return call to schedule.
10/2/2025 CRamen left a vm that parts will deliver tomorrow (Friday 10/3/2025) and for a returned call to schedule for next week. Call logged on WO-01306275
9/26 MOwens Sent chatter to CRamen this is assigned to Ronnie
🔧Work Performed
10/7/25
Traveled to site
Completed safety training
Completed PM according to standards of Xylem.
Tested unit twice (with back cover off and with back cover on)
Completed paperwork
Closed WO
10/3/2025 CRamen spoke with Matthew Herring 864-710-5231 and scheduled for tech to arrive directly from airport eta around noon on Tuesday 10/7 to PM 1 unit and arriva around 8am on Wednesday 10/8 to PM the other. Tech to drive past employee parking to top of the hill to the facility. Tech to check in with security and state that hes there to see Matt Herring in the lap to PM Xylem unit. Tech will need steel toed boots and safety glasses but if he doesnt have them facility will provide slip-ons
Sep 26, 2025 2:28pm
@Charles Ramen This WO is for Ronnie Salone
Oct 8, 2025 4:03pm
/WO-01306276 review complete, report to be mailed 10/8/25 with WO-01306275