Created: Oct 2, 2025
Due: Nov 2, 2025
Completed: Oct 3, 2025 (30 days early)
📅
2.0 daysTotal Age
⏱️
6.0d in ClosedLongest Stage
🔄
6 transitionsStatus Changes
⚠️
6.5d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🚩
3 visitsOn-Site Trips
📋
CoordinatorScheduling
🚩
3 On-Site Visits
3 on-site visits — why were multiple trips needed?
Visit 1Sep 29, 2025
Visit 2Sep 30, 2025
Visit 3Oct 1, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 153 days old
🚨
Primary Delay6.0 days stuck in "Closed"
⏱️
Total Delay6.5 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
2.0d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
6.0d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Building 20 new non-vs 7 range calibrate leaks. Solder class tube, body, top cap. Grind down excessive solder and solder on copper tube. Leak check leaks. Pump down leak and fill with 45 PSI of helium. pinch and cut copper tube. Solder pinch ends and install cap. Clean of leaks. Leaks are done and are ready for plating
🔍Technician Findings
.
Timeline
📋
▶
3
Work Order Created Oct 2, 10:43 AM
Work Order Created → Technician Assigned → Status: Assigned