Created: Oct 31, 2025
Due: Nov 7, 2025
Completed: Oct 31, 2025 (7 days early)
📅
0.2 daysTotal Age
⏱️
4.0d in Ready to BillLongest Stage
🔄
4 transitionsStatus Changes
⚠️
3.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🚩
3 visitsOn-Site Trips
📋
CoordinatorScheduling
🚩
3 On-Site Visits
3 on-site visits — why were multiple trips needed?
Visit 1Oct 14, 2025
Visit 2Oct 30, 2025
Visit 3Oct 31, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 124 days old
🚨
Primary Delay4.0 days stuck in "Ready to Bill"
⏱️
Total Delay3.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.2d / 0.5d SLA
Assigned
0.0d / 0.5d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
4.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
10/31/25 MMcNamara
Technician Findings: Initial survey of unit and 4 probes: 1. S2092 810nm 200mW Standard Tip Issue 1 needs UDI label A7027 2, S2110 69 LED Cluster Probe needs UDI label A6442 3. S2160 810nm 1W Cluster (5x200mW) Issue 1 Needs UDI label A6588 4. Bad Key Switch, needs replacing. 5. Needs 2 Probe Socket Assembly's rev 4 6. Needs new PL539 Main bd to PS cable, rev4 7. Boot around the mains input module (P-1307) is split 8. LX2.3 needs UDI Label Note: Unit came with no bag or power cord.
Work Performed LX2.3 1. Replaced key switch 2. Replaced both probe sockets 1 and 2 with issue 4 assemblies. added mounting velcro and padding. 3. Replaced PL539 Main bd to PS cable with issue 3 version, added mounting velcro. 4. Replaced P-1307 boot around the mains input module. 5. Replaced UDI Label 5. Performed complete re-test of LX2.3 unit.
S2092 810nm 200mW Standard Tip 1. Created and applied new UDI label.
S2110 69 LED Cluster Probe 1. Created and applied new UDI label.
S2160 810nm 1W Cluster (5x200mW) 1. Created and applied new UDI label.
🔧Work Performed
LX2.3
1. Replaced key switch
2. Replaced both probe sockets 1 and 2 with issue 4 assemblies. added mounting velcro and padding.
3. Replaced PL539 Main bd to PS cable with issue 3 version, added mounting velcro.
4. Replaced P-1307 boot around the mains input module.
5. Replaced UDI Label
5. Performed complete re-test of LX2.3 unit.
S2092 810nm 200mW Standard Tip
1. Created and applied new UDI label.
S2110 69 LED Cluster Probe
1. Created and applied new UDI label.
S2160 810nm 1W Cluster (5x200mW)
1. Created and applied new UDI label.
🔍Technician Findings
1. S2092 810nm 200mW Standard Tip Issue 1 needs UDI label A7027
2, S2110 69 LED Cluster Probe needs UDI label A6442
3. S2160 810nm 1W Cluster (5x200mW) Issue 1 Needs UDI label A6588
4. Bad Key Switch, needs replacing.
5. Needs 2 Probe Socket Assembly's rev 4
6. Needs new PL539 Main bd to PS cable, rev4
7. Boot around the mains input module (P-1307) is split
8. LX2.3 needs UDI Label
Note: Unit came with no bag or power cord.
⚠️Problem Description
Faults
Unit won't power on. Intermittent power with activation of keyswitch.
Timeline
📋
▶
2
Work Order Created Oct 31, 7:37 AM
Work Order Created → Expenses Added
💵
Expenses Added
Type:Expenses
Status:Open
Qty:1
⏱️
3x Labor Added Oct 31, 8:42 AM
Type:Labor
Status:Open
Qty:3.75, 4.75, 3.5
👷
▶
2
Technician Assigned Oct 31, 9:10 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by MICHAEL MCNAMARA
From:Entered
To:Assigned
Duration in Previous:1h 32m
✔️
Status: Completed by MICHAEL MCNAMARAOct 31, 9:20 AM
From:Assigned, Completed
To:Completed, Closed
Duration in Previous:9m, 0m
⏳1.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARANov 2, 6:05 AM
From:Closed
To:Ready to Bill
Duration in Previous:1d 21h
⏳4.0 business days
📨
Status: Invoice Pending by Diane PattonNov 6, 4:03 PM
From:Ready to Bill, Invoice Pending
To:Invoice Pending, Invoiced
Duration in Previous:4d 9h, 0m
🧾
Invoice Created Nov 7, 12:18 AM
Invoice Number:SM-245765
Bottlenecks
Ready to Bill
Duration: 4.0 business days (threshold: 1.0 business days)