Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Dec 1, 2025
✓ SLA Met (2 biz days early)
🕐 Clock stopped: Completed (Nov 25, 2025)
0d
▶ Clock Running
Status: Created
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 0 of ? biz days used
0d
▶ Clock Running
Status: Assigned
Nov 25 → Nov 25, 2025
0 business days (counted)
Running total: 0 of ? biz days used
Created: Nov 25, 2025
Completed: Nov 25, 2025
Show SLA Clock Detail (2 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Nov 25 → Nov 25 |
Created |
▶ Running
|
0 |
0 |
| Nov 25 → Nov 25 |
Assigned |
▶ Running
|
0 |
0 |
Billing
1.8 days
Over SLA
Created: Nov 25, 2025
Due: Dec 1, 2025
Completed: Nov 25, 2025 (6 days early)
⏱️
1.8d in Ready to Bill
Longest Stage
🔄
4 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
AI Analysis
Powered by OpenAI
Generating AI analysis...
🚨
Primary Delay
1.8 days stuck in "Ready to Bill"
⏱️
Total Delay
0.8 business days over SLA thresholds
SLA vs Actual Time by Status
Ready to Bill
1.8d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
11/25/25 MMcNamara
Work Required (Engineer)
1. S2173 660nm 75mW Dental Probe Issue 1 A8105. Needs UDI label.
2. S2140 104 LED Cluster Probe Wavelength = 660nm & 850nm Iss 1 A7988. Needs UDI label.
3. S1022 LX2 2.3 Control Unit Issue 1 230567. Needs UDI Label..
4. S2140 104 LED Cluster Probe Wavelength = 660nm & 850nm Iss 1. Two 850 nm LED's not working , failed current test. New head required.
Rework Summary
TR179 660nm 75mW Probe (A8105)
UDI Label replaced
TR181 104 Cluster Probe (A7988)
Head replaced. Retested under issue 5 test procedure
TR170 LX2.3 Control Unit (230567)
UDI label replaced
TR181 104 Cluster Probe (A7988)
1. Head replaced and tested under issue 5.
2. UDI Label replaced.
🔧
Work Performed
TR179 660nm 75mW Probe (A8105)
UDI Label replaced
TR181 104 Cluster Probe (A7988)
Head replaced. Retested under issue 5 test procedure
TR170 LX2.3 Control Unit (230567)
UDI label replaced
TR181 104 Cluster Probe (A7988)
1. Head replaced and tested under issue 5.
2. UDI Label replaced.
🔍
Technician Findings
1. S2173 660nm 75mW Dental Probe Issue 1 A8105. Needs UDI label.
2. S2140 104 LED Cluster Probe Wavelength = 660nm & 850nm Iss 1 A7988. Needs UDI label.
3. S1022 LX2 2.3 Control Unit Issue 1 230567. Needs UDI Label..
4. S2140 104 LED Cluster Probe Wavelength = 660nm & 850nm Iss 1. Two 850 nm LED's not working , failed current test. New head required.
⚠️
Problem Description
Annual Service
Timeline
📋
Work Order:
WO-01317154
Type:
Depot
Priority:
PC
👷
👷
From:
Entered
To:
Assigned
Duration in Previous:
12m
⏱️
Type:
Labor
Status:
Open
Qty:
4.25
⏱️
✔️
From:
Assigned, Completed, Closed
To:
Completed, Closed, Ready to Bill
Duration in Previous:
18m, 0m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Ready to Bill
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.7 business hours
Work Details (2)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-03019576 |
Labor |
Open |
4.25 |
$446.25 |
Nov 25, 12:07 PM |
| WL-03019579 |
Labor |
Open |
3 |
$357.00 |
Nov 25, 12:12 PM |