📍 Exothermics Inc — 14 Columbia Dr, Amherst NH, 03031
Dec 8, 2025 → Dec 15, 2025
✅ Completed
PSM
SLA Clock
Last business day of December 2025 · Target: Dec 31, 2025
✓ SLA Met (10 biz days early)
Active: 6 biz days
🕐 Clock stopped: Completed (Dec 16, 2025)
▶ Clock Running
Status: Created
Dec 8 → Dec 8, 2025
0 business days (counted)
Running total: 0 of ? biz days used
6d
▶ Clock Running
Status: Assigned
Dec 8 → Dec 16, 2025
6 business days (counted)
Running total: 6 of ? biz days used
Created: Dec 8, 2025Completed: Dec 16, 2025
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 8 → Dec 8
Created
▶ Running
0
0
Dec 8 → Dec 16
Assigned
▶ Running
6
6
Dispatch0.0d
Holding3.0d (excluded)
Coordinators6.5d
Field Work0.0d
Billing7.5d
✓ SLA Met
Dispatch
0.0 days
Holding(excluded from total)
3.0 days
Coordinators
6.5 days
Over SLA
Field Work
0.0 days
Billing
7.5 days
Over SLA
Created: Dec 8, 2025
Due: Jan 8, 2026
Completed: Dec 15, 2025 (24 days early)
📅
5.6 daysTotal Age
⏱️
6.5d in AssignedLongest Stage
🔄
8 transitionsStatus Changes
⚠️
11.4d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
6 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 86 days old
🚨
Primary Delay6.5 days stuck in "Assigned"
⏱️
Total Delay11.4 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
6.5d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
1.6d / 1.0d SLA
Ready to Bill
6.8d / 1.0d SLA
On Hold
3.0d
Invoice Pending
0.7d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Perform Bench Overhaul: Evaluated, unit's turbo pump crashed.
12/15/2025 started tear down unit, Cleaned valve block, replace all O-ring, plunger seal, internal leak valve, internal calibrated leak, exchange turbo pump. Cleaned inside spec-tube body, installed hot source filament kit, metal gasket, retorque spec-tube header.
perform fine test procedure, record parameter, MDL/Helium Stability N/A unit leak check
ok shut off unit, pack it up, ship unit back to customer. Replaced mother board battery,
fixed remote handheld.
🔍Technician Findings
Turbo pump Crashed.
⚠️Problem Description
Shipper's Note
08.12.2025 10:43:07 PIERCEB
No Charge Domestic 6466861 has been saved
____________________
Note
04.12.2025 15:03:38 PIERCEB
Also the remote for this unit is randomly losing connection after a few minutes of use.
____________________
Note
04.12.2025 11:07:39 WF-BATCH
Agent: PIERCEB Timestamp: 2025-12-04 10:07:28
Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004262.
Salesperson - Bill Trotter.
Turbo RPM is at 6000
📄Description
VS MD30 Mobile Leak Detector
📞Call Description
VPD Bench Overhaul Trade
Dec 17, 2025 12:52pm
@MICHAEL MCNAMARA @Kim Pearson WO has been reviewed and moved to WO. Thank you.
Timeline
📋
Work Order Created Dec 8, 2:34 PM
Work Order:WO-01324365
Type:Overhaul
Priority:PSM
👷
▶
2
Technician Assigned Dec 8, 2:50 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kim Pearson
From:Entered
To:Assigned
Duration in Previous:15m
⚠️7.0 business days
🔩
5x Parts Added Dec 16, 1:40 PM
Type:Parts
Status:Open
Qty:1
⏱️
▶
3
Labor Added Dec 16, 2:00 PM
Labor Added → Status: Completed → Status: Closed
✔️
Status: Completed by Minh Huynh
From:Assigned
To:Completed
Duration in Previous:7d 23h
🏁
Status: Closed by Minh Huynh
From:Completed
To:Closed
Duration in Previous:1m
📄
Status: Ready to Bill by Hannah ShawDec 17, 12:51 PM
From:Closed
To:Ready to Bill
Duration in Previous:22h 49m
⏳3.0 business days
⏸️
Status: On Hold by MICHAEL MCNAMARADec 21, 9:55 AM
From:Ready to Bill
To:On Hold
Duration in Previous:3d 21h
⏳2.8 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARADec 24, 6:09 AM
From:On Hold
To:Ready to Bill
Duration in Previous:2d 20h
⏳4.0 business days
📨
Status: Invoice Pending by Hannah ShawDec 30, 9:42 AM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:6d 3h
💰
▶
2
Status: Invoiced Dec 30, 3:23 PM
Status: Invoiced → Invoice Created
🧾
Invoice Created
Invoice Number:SM-250104
Bottlenecks
Assigned
Duration: 6.5 business days (threshold: 4.0 business hours)
Exceeded by 6.0 business days
Closed
Duration: 1.6 business days (threshold: 1.0 business days)
Exceeded by 5.0 business hours
Ready to Bill
Duration: 2.8 business days (threshold: 1.0 business days)
Exceeded by 1.8 business days
Ready to Bill
Duration: 4.0 business days (threshold: 1.0 business days)