📍 Atrium Health - Cleveland Carolina Health — 201 E Grover St, Shelby NC, 28150
Dec 9, 2025 → Dec 15, 2025
✅ Completed
PC
SLA Clock
Per client agreement · Target: Dec 23, 2025
✓ SLA Met (5 biz days early)
Active: 5 biz days
🕐 Clock stopped: Completed (Dec 16, 2025)
▶ Clock Running
Status: Created
Dec 9 → Dec 9, 2025
0 business days (counted)
Running total: 0 of ? biz days used
3d
▶ Clock Running
Status: Assigned
Dec 9 → Dec 12, 2025
3 business days (counted)
Running total: 3 of ? biz days used
2d
▶ Clock Running
Status: Scheduled
Dec 12 → Dec 16, 2025
2 business days (counted)
Running total: 5 of ? biz days used
Created: Dec 9, 2025Completed: Dec 16, 2025
Show SLA Clock Detail (3 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 9 → Dec 9
Created
▶ Running
0
0
Dec 9 → Dec 12
Assigned
▶ Running
3
3
Dec 12 → Dec 16
Scheduled
▶ Running
2
5
Dispatch0.2d
Coordinators5.8d
Field Work0.0d
Billing1.5d
✓ SLA Met
Dispatch
0.2 days
Coordinators
5.8 days
Over SLA
Field Work
0.0 days
Billing
1.5 days
Over SLA
Created: Dec 9, 2025
Due: Dec 23, 2025
Completed: Dec 16, 2025 (7 days early)
📅
5.3 daysTotal Age
⏱️
4.0d in AssignedLongest Stage
🔄
7 transitionsStatus Changes
⚠️
5.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 85 days old
🚨
Primary Delay4.0 days stuck in "Assigned"
⏱️
Total Delay5.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.2d / 0.5d SLA
Assigned
4.0d / 0.5d SLA
Scheduled
1.8d / 2.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA
07e-Partial Project
2.0d
Ready to Bill
1.5d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
12/11/2025 EMartin dispatching to FSE onsite per request for mon 12/15/25
12/09/2025 EMartin per FSE will attempt to get back onsite sometime this week if possible WO will be dispatched once requested by FSE
12/09/2025 SRobinson- Created follow up WO as requested. (Old WO-01310807) -follow up notes - Incorrect Part delivered. Part# was correct but actual part in box was not. Returning part and need to reschedule repair.
-Previous notes -
12/04/2025 Cever updated to Dec 8th per FSE
11/05/2025 EMartin quote amended on 11/01/25 awaiting approval currently in sent status to Danny Williams
11/03/2025 EMartin per FSE getting with Fady on device as it keeps failing the repair with multiply attempts
10/23/2025 EMartin per FSE getting with Fady on device as it keeps failing the repair with multiply attempts
10/22/2025 EMartin reached out to FSE via teams for update on device
🔧Work Performed
Travel to site. Get to Biomed. setup equipment, wait for part to arrive. Completed repair successfully. All T&V tests passed.
🔍Technician Findings
O2 connector needs replacement. Repair
⚠️Problem Description
Taqiyy Coley Upon initial inspection of device failed, System Leak Verification: Pressure Drop over 10s OPERATOR FAIL cmH2O FAIL
WO-01324453 - Repair - Trilogy EV300 Vent - Shelby - Atrium Health - Cleveland Carolina Health
Dec 15, 2025 8:00am – 5:00pm
Work Order: WO-01324453
Account: PHILIPS HEALTHCARE
Customer Case Number: WO-14068646
Location: Atrium Health - Cleveland Carolina Health
Address: 201 E Grover St, Shelby, NC 28150
Manufacturer: Philips Healthcare
Model #: Trilogy EV300 Vent
Serial #: H2839599417F8
Contact Name: Danny Williams
Conta
Timeline
📋
Work Order Created Dec 9, 9:12 AM
Work Order:WO-01324453
Type:Repair
Priority:PC
👷
▶
2
Technician Assigned Dec 9, 11:00 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Erin Martin
From:Entered
To:Assigned
Duration in Previous:1h 48m
⏳4.0 business days
🗓️
▶
2
Status: Scheduled Dec 12, 2:42 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Erin Martin
Scheduled For:2025-12-15T13:00:00.000+0000
⏳2.0 business days
⏱️
3x Labor Added Dec 15, 7:13 PM
Type:Labor, Travel
Status:Open
Qty:2, 67
✔️
▶
2
Status: Completed Dec 15, 9:25 PM
Status: Completed → Status: Closed
🏁
Status: Closed by Patricia Gordon
From:Completed
To:Closed
Duration in Previous:1m
⏳2.3 business days
⏱️
▶
2
Labor Added Dec 17, 8:34 AM
Labor Added → Status: 07e-Partial Project
📋
Status: 07e-Partial Project by Timothy Amburgey
From:Closed
To:07e-Partial Project
Duration in Previous:1d 11h
⏳2.0 business days
📄
Status: Ready to Bill by Timothy AmburgeyDec 18, 3:12 PM
From:07e-Partial Project
To:Ready to Bill
Duration in Previous:1d 6h
💰
Status: Invoiced by Josh LongwayDec 19, 4:01 AM
From:Ready to Bill
To:Invoiced
Duration in Previous:12h 48m
Bottlenecks
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 1.5 business days (threshold: 1.0 business days)