5 business days from creation · Target: Dec 16, 2025
✓ SLA Met (2 biz days early)
Active: 3 biz days
Budget: 5 biz days
🕐 Clock stopped: Completed (Dec 12, 2025)
SLA Target
▶ Clock Running
Status: Created
Dec 9 → Dec 9, 2025
0 business days (counted)
Running total: 0 of 5 biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 9 → Dec 9, 2025
0 business days (counted)
Running total: 0 of 5 biz days used
3d
▶ Clock Running
Status: Assigned
Dec 9 → Dec 12, 2025
3 business days (counted)
Running total: 3 of 5 biz days used
Created: Dec 9, 2025Completed: Dec 12, 2025
Business Days Used3 / 5
05d budget
Show SLA Clock Detail (3 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 9 → Dec 9
Created
▶ Running
0
0 / 5
Dec 9 → Dec 9
Ready for Scheduling
▶ Running
0
0 / 5
Dec 9 → Dec 12
Assigned
▶ Running
3
3 / 5
Dispatch0.0d
Coordinators3.7d
Billing0.0d
✓ SLA Met
Dispatch
0.0 days
Coordinators
3.7 days
Over SLA
Billing
0.0 days
Created: Dec 9, 2025
Due: Dec 16, 2025
Completed: Dec 12, 2025 (4 days early)
📅
3.7 daysTotal Age
⏱️
3.6d in AssignedLongest Stage
🔄
6 transitionsStatus Changes
⚠️
3.9d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
2 visitsOn-Site Trips
📋
CoordinatorScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1Dec 10, 2025
Visit 2Dec 12, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 85 days old
🚨
Primary Delay3.6 days stuck in "Assigned"
⏱️
Total Delay3.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.1d / 1.0d SLA
Assigned
3.6d / 0.5d SLA
Closed
1.8d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
12.10.2025 UNIT was staged for trainee to troubleshoot/locate root-cause of issue
🔧Work Performed
12.12.2025
Inspected unit due to lockout condition. Located missing footboard and reinstalled securely. Lockout condition was cleared once footboard was properly installed. Unit was powered on and all functions were tested for proper operation. Unit passed functional testing and was returned to service.
🔍Technician Findings
Unit was found in a locked-out state due to missing footboard. Lockout is designed to engage when required components are not installed. After reinstalling the footboard, lockout condition was resolved and unit operated normally. No further issues noted.