Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01325275 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 BAPTIST HOSPITALS OF SOUTHEAST — 3220 FANNIN ST, BEAUMONT TX, 77701

Dec 12, 2025 → Feb 27, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Feb 28, 2026
✓ SLA Met
Active: 4 biz days
Paused: 47 biz days
🕐 Clock stopped: Completed (Feb 27, 2026)
▶ Clock Running
Status: Created
Dec 12 → Dec 15, 2025
1 business day (counted)
Running total: 1 of ? biz days used
⏸40d
⏸ Clock Paused
Status: Ready for Release
Dec 15 → Feb 12, 2026
40 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 12 → Feb 18, 2026
3 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 18 → Feb 18, 2026
0 business days (counted)
Running total: 4 of ? biz days used
⏸7d
⏸ Clock Paused
Status: Awaiting Parts
Feb 18 → Feb 27, 2026
7 business days (not counted)
▶ Clock Running
Status: Scheduled
Feb 27 → Feb 27, 2026
0 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 27 → Feb 27, 2026
0 business days (counted)
Running total: 4 of ? biz days used
Created: Dec 12, 2025 Completed: Feb 27, 2026
Show SLA Clock Detail (7 periods)
Period Status Clock Biz Days Running Total
Dec 12 → Dec 15 Created ▶ Running 1 1
Dec 15 → Feb 12 Ready for Release ⏸ Paused 40
Feb 12 → Feb 18 Assigned ▶ Running 3 4
Feb 18 → Feb 18 Scheduled ▶ Running 0 4
Feb 18 → Feb 27 Awaiting Parts ⏸ Paused 7
Feb 27 → Feb 27 Scheduled ▶ Running 0 4
Feb 27 → Feb 27 Tech On Site ▶ Running 0 4
Dispatch 2.0d
Material Management 7.8d
Holding 40.8d (excluded)
Coordinators 3.6d
Field Work 0.9d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Material Management
7.8 days
Over SLA
Holding (excluded from total)
40.8 days
Coordinators
3.6 days
Over SLA
Field Work
0.9 days
Created: Dec 12, 2025 Due: Feb 28, 2026 (5 days overdue)
📅
52.0 days Total Age
⏱️
40.8d in Ready for Release Longest Stage
🔄
8 transitions Status Changes
⚠️
9.6d over Total Delay
📦
1 orders, 0 quotes Parts & Quotes
📝
4 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
At Risk - Monitor Closely
Ready to Bill • 82 days old
🚨
Primary Delay 40.8 days stuck in "Ready for Release"
⏱️
Total Delay 9.6 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
40.8d
Assigned
3.6d / 0.5d SLA
Scheduled
0.0d / 2.0d SLA
Awaiting Parts
7.8d / 3.0d SLA
Tech On Site
0.9d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
1.2d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

02/18/2026 Brod - called 2103745799 to speak to Jaime Torres, he confirmed FSE onsite for 02/23 at 9 am . sending confirmation to jtorres@renovo1.com 


02/18/2026 Brod - called 4095405281 to speak to Zach Thibodeaux , he stated he wasnt at work today told me to call Jaime Torres at 210-374-5799. 


02/10/2026 YEspino Called 409-540-5281 to speak to Zach Thibodeaux to verify the device in question.Was sent straight to vm and could not leave a message because the mailbox was full.


02/10/2026 YEspino Called 409-212-5000 to verify the device in question. Asked to be transferred over to the biomed dept but was unable to speak to anybody or leave a message because the mailbox was full.

🔧 Work Performed
Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R4.4.3 or R4.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
🔍 Technician Findings
FMI 78101E/F implemented.
⚠️ Problem Description
FMI 78101E: Venue Fit Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Fit Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:06 AM
Work Order: WO-01325275
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:18 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 41.0 business days
👷
2 Technician Assigned Feb 12, 2:35 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Brandi Rodriguez
From: Ready for Release
To: Assigned
Duration in Previous: 59d 2h
4.0 business days
🗓️
5 Status: Scheduled Feb 18, 12:14 PM
Status: Scheduled → Dispatch Scheduled → Dispatch Scheduled → Parts Requested → Status: Awaiting Parts
📅
Dispatch Scheduled by Brandi Rodriguez
Scheduled For: 2026-02-23T06:00:00.000+0000, 2026-02-23T00:00:00.000+0000
📅
Dispatch Scheduled by Brandi Rodriguez
Scheduled For: 2026-02-23T15:00:00.000+0000
📦
Parts Requested
Order: 00090614
Status: Canceled
📦
Status: Awaiting Parts by Brandi Rodriguez
From: Scheduled
To: Awaiting Parts
Duration in Previous: 3m
⚠️ 8.0 business days
🗓️
2 Status: Scheduled Feb 27, 10:22 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Marvin Rivas
Scheduled For: 2026-02-27T14:00:00.000+0000
⏱️
2 Labor Added Feb 27, 12:42 PM
Labor Added → 2x Labor Added
⏱️
2x Labor Added
Type: Labor, Travel
Status: Open
Qty: 2.5, 100
✔️
Status: Completed by Marvin Rivas Feb 27, 5:23 PM
From: Tech On Site
To: Completed
Duration in Previous: 7h 1m
🏁
Status: Closed by Marvin Rivas Feb 27, 5:29 PM
From: Completed
To: Closed
Duration in Previous: 5m
1.8 business days
⏱️
2 Labor Added Mar 2, 12:46 PM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 2d 19h

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Assigned
Duration: 3.6 business days (threshold: 4.0 business hours)
Exceeded by 3.1 business days
Awaiting Parts
Duration: 7.8 business days (threshold: 3.0 business days)
Exceeded by 4.8 business days
Closed
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.5 business hours

🔗 Related Artifacts

📦
Parts Order 00090614
Canceled

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Marvin Rivas
Scheduled
Feb 27, 9:00 AM
Created
Dec 12, 11:06 AM
Invoice #
N/A

Work Details (4)

Name Type Status Qty Amount Date
WL-03123355 Labor Open 2 $250.00 Feb 27, 12:42 PM
WL-03123360 Labor Open 2.5 $100.00 Feb 27, 12:45 PM
WL-03123361 Travel Open 100 $0.00 Feb 27, 12:45 PM
WL-03126135 Labor Open 0.016666666666667 $38.00 Mar 2, 12:46 PM

Details