Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01325705 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 MAITLAND FSER — 9401 SUMMIT CENTRE WAY, ORLANDO FL, 32810

Dec 12, 2025 → Feb 5, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✗ SLA Missed
Active: 6 biz days
Paused: 31 biz days
🕐 Clock stopped: Completed (Feb 6, 2026)
▶ Clock Running
Status: Created
Dec 12 → Dec 15, 2025
1 business day (counted)
Running total: 1 of ? biz days used
⏸31d
⏸ Clock Paused
Status: Ready for Release
Dec 15 → Jan 30, 2026
31 business days (not counted)
▶ Clock Running
Status: Assigned
Jan 30 → Jan 30, 2026
0 business days (counted)
Running total: 1 of ? biz days used
3d
▶ Clock Running
Status: Scheduled
Jan 30 → Feb 4, 2026
3 business days (counted)
Running total: 4 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 4 → Feb 6, 2026
2 business days (counted)
Running total: 6 of ? biz days used
Created: Dec 12, 2025 Completed: Feb 6, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Dec 12 → Dec 15 Created ▶ Running 1 1
Dec 15 → Jan 30 Ready for Release ⏸ Paused 31
Jan 30 → Jan 30 Assigned ▶ Running 0 1
Jan 30 → Feb 4 Scheduled ▶ Running 3 4
Feb 4 → Feb 6 Tech On Site ▶ Running 2 6
Dispatch 2.0d
Holding 31.9d (excluded)
Coordinators 4.0d
Field Work 1.8d
✗ SLA Missed
Dispatch
2.0 days
Over SLA
Holding (excluded from total)
31.9 days
Coordinators
4.0 days
Over SLA
Field Work
1.8 days
Over SLA
Created: Dec 12, 2025 Due: Jan 31, 2026 (33 days overdue)
📅
37.2 days Total Age
⏱️
31.9d in Ready for Release Longest Stage
🔄
5 transitions Status Changes
⚠️
6.2d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
5 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
At Risk - Monitor Closely
Ready to Bill • 82 days old
🚨
Primary Delay 31.9 days stuck in "Ready for Release"
⏱️
Total Delay 6.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
31.9d
Scheduled
4.0d / 2.0d SLA
Tech On Site
1.8d / 1.0d SLA
Closed
3.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

01/30/2026 ALuman - dispatch to Jared to complete on 2/4. Email sent to Macie and Donnie William

01/20/2026 MHamersley - called 407-330-8251, call went to Donnie's VM/LM; sent f/u email: Donnie.Williams@hcahealthcare.com


01/20/2026 MHamersley - called 407-220-7900, xfer to main hospital, xfer to Bio Med, call went to VM, mailbox is full and couldn't leave msg


01/06/2026 ALuman called 407-890-2099 listed as the main number for he HCA Florida Maitland Emergency. Number rings to Cathy Perry (Director of Communications at Oveido Medical Center). Need to locate another contact

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions. Verification Test: Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: Completed FMI 78101 by installing SW Version R4.5 and communicated with customer to scrap previous software versions. Verification Test: Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101D: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R4.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 ? OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare - Venue Go Ultrasound
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:06 AM
Work Order: WO-01325705
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:10 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 32.0 business days
👷
3 Technician Assigned Jan 30, 11:13 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Ashley Luman
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 45d 23h, 0m
📅
Dispatch Scheduled by Ashley Luman
Scheduled For: 2026-02-04T13:00:00.000+0000
4.0 business days
🔧
Status: Tech On Site by Jared Heisler Feb 4, 2:26 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 5d 3h
🔩
Parts Added Feb 4, 3:07 PM
Type: Parts
Status: Open
Qty: 2
2.0 business days
⏱️
2 3x Labor Added Feb 5, 8:45 PM
3x Labor Added → Status: Completed
✔️
Status: Completed by Jared Heisler
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 1d 6h, 0m
3.4 business days
⏱️
2 Labor Added Feb 10, 1:52 PM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 4d 17h

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 4.0 business days (threshold: 2.0 business days)
Exceeded by 2.0 business days
Tech On Site
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.3 business hours
Closed
Duration: 3.0 business days (threshold: 1.0 business days)
Exceeded by 2.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Jared Heisler
Scheduled
Feb 4, 8:00 AM
Created
Dec 12, 11:06 AM
Invoice #
N/A

Work Details (5)

Name Type Status Qty Amount Date
WL-03091462 Parts Open 2 $0.00 Feb 4, 3:07 PM
WL-03094244 Labor Open 1.5 $100.00 Feb 5, 8:45 PM
WL-03094245 Labor Open 2.5 $250.00 Feb 5, 8:45 PM
WL-03094246 Travel Open 128 $0.00 Feb 5, 8:45 PM
WL-03099245 Labor Open 0.016666666666667 $38.00 Feb 10, 1:52 PM

Details