Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01325970 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 PARKLAND HEALTH & HOSPITAL SYSTEM DISTRIBUTION CENTER — 10880 GOODNIGHT LN, DALLAS TX, 75220

Dec 12, 2025 → Feb 22, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Feb 28, 2026
✓ SLA Met (4 biz days early)
Active: 6 biz days
Paused: 41 biz days
🕐 Clock stopped: Completed (Feb 23, 2026)
▶ Clock Running
Status: Created
Dec 12 → Dec 15, 2025
1 business day (counted)
Running total: 1 of ? biz days used
⏸41d
⏸ Clock Paused
Status: Ready for Release
Dec 15 → Feb 13, 2026
41 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 13 → Feb 13, 2026
0 business days (counted)
Running total: 1 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Feb 13 → Feb 23, 2026
5 business days (counted)
Running total: 6 of ? biz days used
Created: Dec 12, 2025 Completed: Feb 23, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Dec 12 → Dec 15 Created ▶ Running 1 1
Dec 15 → Feb 13 Ready for Release ⏸ Paused 41
Feb 13 → Feb 13 Assigned ▶ Running 0 1
Feb 13 → Feb 23 Scheduled ▶ Running 5 6
Dispatch 2.0d
Holding 41.8d (excluded)
Coordinators 5.4d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Holding (excluded from total)
41.8 days
Coordinators
5.4 days
Over SLA
Created: Dec 12, 2025 Due: Feb 28, 2026 (5 days overdue)
📅
47.3 days Total Age
⏱️
41.8d in Ready for Release Longest Stage
🔄
5 transitions Status Changes
⚠️
5.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
📋
Coordinator Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
At Risk - Monitor Closely
Ready to Bill • 82 days old
🚨
Primary Delay 41.8 days stuck in "Ready for Release"
⏱️
Total Delay 5.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
41.8d
Assigned
0.0d / 0.5d SLA
Scheduled
5.3d / 2.0d SLA
Closed
2.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

02/23/2026 SRobinson- Created follow up WO as requested. (WO-01353240)

02/12/2026 mklose dispatch to Davon per Fady 02/10/2026 LHill-sent email to Dwayne Connor-trying to schedule tech visit for 14 devices. See logged email on WO-01325956 02/10/2026 LHill-Called 469-419-0375. Left message for Dwayne Connor . Trying to schedule tech visit for about 14 devices. See logged call on WO-01325956. 12/29/2025 MHamersley - recd email from Patrick providing contact information and cc in email: Dwayne Connor, Radiology Service Engineer, 469-419-0375; DWAYNE.CONNOR@phhs.org; ... 12/29/2025 MHamersley - called 214-590-8000 xfer to 5 different depts, spoke to Trisha Diaz, she said to contact: Patrick Eaton, 469-419-0274; email: patrick.eaton@phhs.org; called left VM and sent email.

🔧 Work Performed
Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 or R3.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
🔍 Technician Findings
Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 or R3.5 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”.
⚠️ Problem Description
FMI 78101B: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:06 AM
Work Order: WO-01325970
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:19 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 42.0 business days
👷
2 Technician Assigned Feb 13, 9:09 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Megan Klose
From: Ready for Release
To: Assigned
Duration in Previous: 59d 20h
🗓️
2 Status: Scheduled Feb 13, 9:27 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Megan Klose
Scheduled For: 2026-02-16T13:00:00.000+0000
⚠️ 5.0 business days
⏱️
2 2x Labor Added Feb 22, 9:40 PM
2x Labor Added → Status: Completed
✔️
Status: Completed by Davon Cox
From: Scheduled, Completed
To: Completed, Closed
Duration in Previous: 9d 12h, 0m
2.0 business days
⏱️
2 Labor Added Feb 24, 10:42 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 1d 13h

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 5.3 business days (threshold: 2.0 business days)
Exceeded by 3.3 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Davon Cox
Scheduled
Feb 16, 8:00 AM
Created
Dec 12, 11:06 AM
Invoice #
N/A

Work Details (3)

Name Type Status Qty Amount Date
WL-03115721 Labor Open 1.25 $100.00 Feb 22, 9:40 PM
WL-03115722 Parts Open 1 $0.00 Feb 22, 9:40 PM
WL-03117407 Labor Open 0.016666666666667 $38.00 Feb 24, 10:42 AM

Details