Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01326026 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 SCOTT & WHITE HOSPITAL — 810 W HIGHWAY 71, MARBLE FALLS TX, 78654

Dec 12, 2025 → Mar 4, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Mar 31, 2026
✓ SLA Met (18 biz days early)
Active: 4 biz days
Paused: 51 biz days
🕐 Clock stopped: Completed (Mar 5, 2026)
▶ Clock Running
Status: Created
Dec 12 → Dec 15, 2025
1 business day (counted)
Running total: 1 of ? biz days used
⏸51d
⏸ Clock Paused
Status: Ready for Release
Dec 15 → Mar 2, 2026
51 business days (not counted)
▶ Clock Running
Status: Scheduled
Mar 2 → Mar 3, 2026
1 business day (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 3 → Mar 5, 2026
2 business days (counted)
Running total: 4 of ? biz days used
Created: Dec 12, 2025 Completed: Mar 5, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Dec 12 → Dec 15 Created ▶ Running 1 1
Dec 15 → Mar 2 Ready for Release ⏸ Paused 51
Mar 2 → Mar 3 Scheduled ▶ Running 1 2
Mar 3 → Mar 5 Tech On Site ▶ Running 2 4
Dispatch 2.0d
Holding 51.8d (excluded)
Coordinators 0.5d
Field Work 2.3d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Holding (excluded from total)
51.8 days
Coordinators
0.5 days
Field Work
2.3 days
Over SLA
Created: Dec 12, 2025 Due: Mar 31, 2026 Completed: Mar 5, 2026 (26 days early)
📅
55.3 days Total Age
⏱️
51.8d in Ready for Release Longest Stage
🔄
4 transitions Status Changes
⚠️
2.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
2 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Closed • 82 days old
🚨
Primary Delay 51.8 days stuck in "Ready for Release"
⏱️
Total Delay 2.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
51.8d
Scheduled
0.5d / 2.0d SLA
Tech On Site
2.3d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

03/02/2026 mklose Phil at location,

02/26/2026: ARoosa- Called; 830-201-8000, xfer to radiology. xfer to radiology Mngr. Spoke to Matt who asked for email to be sent to matthew.gerdes@bswhealth.org

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101B: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:07 AM
Work Order: WO-01326026
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:18 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 52.0 business days
📅
3 Dispatch Scheduled Mar 2, 3:17 PM
Dispatch Scheduled → Status: Scheduled → Technician Assigned
🗓️
Status: Scheduled by Megan Klose
From: Ready for Release
To: Scheduled
Duration in Previous: 77d 2h
👷
Technician Assigned by Megan Klose
Technician: Philmon Mehari
🔧
Status: Tech On Site by Philmon Mehari Mar 2, 7:17 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 3h 59m
⏱️
Labor Added Mar 3, 2:46 PM
Type: Labor
Status: Open
Qty: 1.5
2.0 business days
🔩
Parts Added Mar 4, 9:09 PM
Type: Parts
Status: Open
Qty: 2
✔️
Status: Completed by Philmon Mehari Mar 4, 9:28 PM
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 2d 2h, 0m

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Tech On Site
Duration: 2.3 business days (threshold: 1.0 business days)
Exceeded by 1.3 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Closed
Priority
PC
Type
FCO
Branch
N/A
Technician
Philmon Mehari
Scheduled
Mar 2, 3:30 PM
Created
Dec 12, 11:07 AM
Invoice #
N/A

Work Details (2)

Name Type Status Qty Amount Date
WL-03128052 Labor Open 1.5 $100.00 Mar 3, 2:46 PM
WL-03130818 Parts Open 2 $0.00 Mar 4, 9:09 PM

Details