Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01326059 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 ST DAVIDS EMERGENCY CENTER — 3201 HIGHWAY 71, BASTROP TX, 78602

Dec 12, 2025 → Feb 19, 2026

🔴 Behind
PC
SLA Clock
Per client agreement · Target: Feb 28, 2026
✓ SLA Met (6 biz days early)
Active: 1 biz days
Paused: 44 biz days
🕐 Clock stopped: Completed (Feb 19, 2026)
▶ Clock Running
Status: Created
Dec 12 → Dec 15, 2025
1 business day (counted)
Running total: 1 of ? biz days used
⏸44d
⏸ Clock Paused
Status: Ready for Release
Dec 15 → Feb 19, 2026
44 business days (not counted)
▶ Clock Running
Status: Scheduled
Feb 19 → Feb 19, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 19 → Feb 19, 2026
0 business days (counted)
Running total: 1 of ? biz days used
Created: Dec 12, 2025 Completed: Feb 19, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Dec 12 → Dec 15 Created ▶ Running 1 1
Dec 15 → Feb 19 Ready for Release ⏸ Paused 44
Feb 19 → Feb 19 Scheduled ▶ Running 0 1
Feb 19 → Feb 19 Tech On Site ▶ Running 0 1
Dispatch 2.0d
Holding 44.8d (excluded)
Coordinators 0.0d
Field Work 0.8d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Holding (excluded from total)
44.8 days
Coordinators
0.0 days
Field Work
0.8 days
Created: Dec 12, 2025 Due: Feb 28, 2026 (5 days overdue)
📅
46.0 days Total Age
⏱️
44.8d in Ready for Release Longest Stage
🔄
6 transitions Status Changes
⚠️
3.8d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
7 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
On Track
Ready to Bill • 82 days old
🚨
Primary Delay 44.8 days stuck in "Ready for Release"
⏱️
Total Delay 3.8 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Ready for Release
44.8d
Scheduled
0.0d / 2.0d SLA
Tech On Site
0.8d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
3.3d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

02/20/2026 SRobinson- Created follow up WO as requested. (WO-01353021)

01/09/2025 Brod - called 5122844951 to speak to Holly , wnt to vm left message to schedule and confirm FSE onsite for 01/12. following up in email to holly.roten@gehealthcare.com*** 12/26/2025 MHamersley - called 512-284-4951, call went to Holly's VM/LM; sent email: Holly.roten@gehealthcare.com

🔧 Work Performed
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
🔍 Technician Findings
"Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing SW Version R3.4 and communicated with customer to scrap previous software versions”. Verification Test: “Performed Probe and Connectors Checks for all probes. Confirmed all probes pass. Completed all Peripheral Checks-system passed. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”. Template Name: Template Description: Problem Found: Action Taken: “Completed FMI 78101 by installing new supplied batteries / Batteries installed by customer and dispose of old batteries according to local regulation”. Verification Test: “Performed battery charging test - verified after 10 minutes, the scan time increased. Completed full system diagnostics-system passed. Equipment passed all required tests and has been returned to the customer fully functional”."
⚠️ Problem Description
FMI 78101B: Venue Go Thermal Event due to battery Purpose: Each affected system will have a SW Version R3.5 update installed. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at TCS.FMIAdmin@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📞 Call Description
FMI 78101

Timeline

📋
Work Order Created Dec 12, 11:07 AM
Work Order: WO-01326059
Type: FCO
Priority: PC
2.0 business days
Status: Ready for Release by Mandy Newman Dec 15, 12:19 PM
From: Entered
To: Ready for Release
Duration in Previous: 3d 1h
🚨 45.0 business days
👷
3 Technician Assigned Feb 19, 10:08 AM
Technician Assigned → Dispatch Scheduled → Status: Scheduled
📅
Dispatch Scheduled by Deon Malloy
Scheduled For: 2026-02-19T05:00:00.000+0000, 2026-02-19T00:00:00.000+0000, 2026-02-19T13:00:00.000+0000
🗓️
Status: Scheduled by Deon Malloy
From: Ready for Release
To: Scheduled
Duration in Previous: 65d 21h
🔧
Status: Tech On Site by Philmon Mehari Feb 19, 10:16 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 7m
⏱️
5x Labor Added Feb 19, 10:41 AM
Type: Labor, Travel
Status: Open
Qty: 1, 51, 52
💵
Expenses Added Feb 19, 4:15 PM
Type: Expenses
Status: Open
Qty: 1
✔️
2 Status: Completed Feb 19, 4:23 PM
Status: Completed → Status: Closed
🏁
Status: Closed by Philmon Mehari
From: Completed
To: Closed
Duration in Previous: 2m
3.9 business days
⏱️
2 Labor Added Feb 24, 11:09 AM
Labor Added → Status: Ready to Bill
📄
Status: Ready to Bill by Timothy Amburgey
From: Closed
To: Ready to Bill
Duration in Previous: 4d 18h

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Closed
Duration: 3.3 business days (threshold: 1.0 business days)
Exceeded by 2.3 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Ready to Bill
Priority
PC
Type
FCO
Branch
N/A
Technician
Philmon Mehari
Scheduled
Feb 19, 8:00 AM
Created
Dec 12, 11:07 AM
Invoice #
N/A

Work Details (7)

Name Type Status Qty Amount Date
WL-03111843 Labor Open 1 $250.00 Feb 19, 10:41 AM
WL-03111844 Labor Open 1 $0.00 Feb 19, 10:41 AM
WL-03111845 Labor Open 1 $100.00 Feb 19, 10:41 AM
WL-03111846 Travel Open 51 $0.00 Feb 19, 10:41 AM
WL-03111847 Travel Open 52 $0.00 Feb 19, 10:41 AM
WL-03112433 Expenses Open 1 $0.00 Feb 19, 4:15 PM
WL-03117477 Labor Open 0.016666666666667 $38.00 Feb 24, 11:09 AM

Details