Created: Dec 30, 2025
Due: Jan 2, 2026
Completed: Dec 30, 2025 (3 days early)
📅
0.1 daysTotal Age
⏱️
0.3d in Ready to BillLongest Stage
🔄
4 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🚩
3 visitsOn-Site Trips
📋
CoordinatorScheduling
🚩
3 On-Site Visits
3 on-site visits — why were multiple trips needed?
Visit 1Dec 23, 2025
Visit 2Dec 24, 2025
Visit 3Dec 30, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed on schedule
Invoiced • 64 days old
✅
No IssuesWork order progressed without significant delays
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.1d / 0.5d SLA
Ready to Bill
0.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
12/30/25 MMcNamara Technician Findings S1022 LX2 2.3 Control Unit Issue 1. 1. PL538 Skt 1 and Skt 2 need to be replaced with rev 4 version.. 2. Padding and mounting velcro needs to be added to the ferrites. 3. PL539 cable needs to be replaced with rev 4 version. 4. Mounting velcro needs to be added to the PL539 cable and pcb.. 5. Key switch needs to be replaced. 6. UDI label needs to be replaced..
1022 LX2 2.3 Control Unit Issue 1.
1. PL538 Skt 1 and Skt 2 replaced with rev 4 version.. 2. Padding and mounting velcro added to the ferrites. 3. PL539 cable replaced with rev 4 version. 4. Mounting velcro added to the PL539 cable and pcb.. 5. Key switch replaced. 6. UDI label replaced. 7. Unit retested.
🔧Work Performed
1022 LX2 2.3 Control Unit Issue 1.
1. PL538 Skt 1 and Skt 2 replaced with rev 4 version..
2. Padding and mounting velcro added to the ferrites.
3. PL539 cable replaced with rev 4 version.
4. Mounting velcro added to the PL539 cable and pcb..
5. Key switch replaced.
6. UDI label replaced.
7. Unit retested.
🔍Technician Findings
S1022 LX2 2.3 Control Unit Issue 1.
1. PL538 Skt 1 and Skt 2 need to be replaced with rev 4 version..
2. Padding and mounting velcro needs to be added to the ferrites.
3. PL539 cable needs to be replaced with rev 4 version.
4. Mounting velcro needs to be added to the PL539 cable and pcb..
5. Key switch needs to be replaced.
6. UDI label needs to be replaced..
⚠️Problem Description
Won't start up.
Timeline
📋
▶
4
Work Order Created Dec 30, 7:15 AM
Work Order Created → Expenses Added → Technician Assigned → Status: Assigned
💵
Expenses Added
Type:Expenses
Status:Open
Qty:1
👷
Technician Assigned by MICHAEL MCNAMARA
Technician:Mike McNamara
👷
Status: Assigned by MICHAEL MCNAMARA
From:Entered
To:Assigned
Duration in Previous:1m
⏱️
3x Labor Added Dec 30, 7:30 AM
Type:Labor
Status:Open
Qty:1, 4.5, 3.5
✔️
Status: Completed by MICHAEL MCNAMARADec 30, 7:43 AM