📍 Joliet Inpatient Treatment Center — 2448 McDonough Street, Joliet IL, 60436
Jan 6, 2026 → Jan 29, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✓ SLA Met (1 biz days early)
Active: 4 biz days
Paused: 12 biz days
🕐 Clock stopped: Completed (Jan 29, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸12d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 26, 2026
12 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Jan 26 → Jan 26, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Jan 26 → Jan 26, 2026
0 business days (counted)
Running total: 1 of ? biz days used
2d
▶ Clock Running
Status: Scheduled
Jan 26 → Jan 28, 2026
2 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 28 → Jan 29, 2026
1 business day (counted)
Running total: 4 of ? biz days used
Created: Jan 6, 2026Completed: Jan 29, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 26
Ready for Release
⏸ Paused
12
—
Jan 26 → Jan 26
Ready for Scheduling
▶ Running
0
1
Jan 26 → Jan 26
Assigned
▶ Running
0
1
Jan 26 → Jan 28
Scheduled
▶ Running
2
3
Jan 28 → Jan 29
Tech On Site
▶ Running
1
4
Holding14.6d (excluded)
Coordinators2.7d
Field Work1.4d
Billing0.0d
✓ SLA Met
Holding(excluded from total)
14.6 days
Coordinators
2.7 days
Over SLA
Field Work
1.4 days
Over SLA
Billing
0.0 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Jan 29, 2026 (336 days early)
📅
16.3 daysTotal Age
⏱️
13.0d in Ready for ReleaseLongest Stage
🔄
8 transitionsStatus Changes
⚠️
0.7d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 57 days old
🚨
Primary Delay13.0 days stuck in "Ready for Release"
⏱️
Total Delay0.7 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
13.0d
Ready for Scheduling
0.4d / 1.0d SLA
Scheduled
2.3d / 2.0d SLA
Tech On Site
1.4d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.0d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/28/26 VNyathi - I did not initially have the required site clearance; access was granted after an extended waiting period. For future visits, prior site clearance is required, and the site must be notified a minimum of 72 hours in advance of scheduling. The correct site contacts are as follows: : kristina.gardner@illinois.gov and mercy.kolenchery@illinois.gov
1/26/2026 CRamen spoke to Elizabeth and scheduled for Wednesday 1/28/2026 with tech arrival between 10-12
1/26/2026 Recent repair was performed by Alan Page however PM was not performed as PM WO had been CX secondary to inability to contact. Please complete 2026 PM. If clearance is required for this site, send Alan Page.
🔧Work Performed
PM
🔍Technician Findings
System online
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Station Hardwired
📋
Outbound to +18157304400
Completed Jan 26, 2026
1/26/2026 CRamen spoke to Elizabeth and scheduled for Wednesday 1/28/2026 with tech arrival between 10-12