📍 Sam's Club #4816 — 6201 South Aurora Parkway, Aurora CO, 80016
Jan 6, 2026 → Jan 26, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✓ SLA Met (3 biz days early)
Active: 4 biz days
Paused: 10 biz days
🕐 Clock stopped: Completed (Jan 27, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸10d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Jan 22, 2026
10 business days (not counted)
▶ Clock Running
Status: Assigned
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 1 of ? biz days used
2d
▶ Clock Running
Status: Scheduled
Jan 22 → Jan 26, 2026
2 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 26 → Jan 27, 2026
1 business day (counted)
Running total: 4 of ? biz days used
Created: Jan 6, 2026Completed: Jan 27, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Jan 22
Ready for Release
⏸ Paused
10
—
Jan 22 → Jan 22
Assigned
▶ Running
0
1
Jan 22 → Jan 26
Scheduled
▶ Running
2
3
Jan 26 → Jan 27
Tech On Site
▶ Running
1
4
Holding12.6d (excluded)
Coordinators3.0d
Field Work0.1d
Billing1.3d
✓ SLA Met
Holding(excluded from total)
12.6 days
Coordinators
3.0 days
Over SLA
Field Work
0.1 days
Billing
1.3 days
Over SLA
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Jan 27, 2026 (338 days early)
📅
13.6 daysTotal Age
⏱️
11.0d in Ready for ReleaseLongest Stage
🔄
7 transitionsStatus Changes
⚠️
1.3d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
3 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 57 days old
🚨
Primary Delay11.0 days stuck in "Ready for Release"
⏱️
Total Delay1.3 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
11.0d
Scheduled
3.0d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
1.3d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1.27.26 hshaw - confirm with tech if WO was the last job.
🔧Work Performed
Performed PM per manufacturer specifications.
🔍Technician Findings
Kiosk was fully operational
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Higi Green Kiosk with 4G installed
Jan 27, 2026 11:22am
@Jason Morris please confirm if this was your last WO for the day. If so, Labor travel and mileage from site need to be entered. @Nicholas Willick
Please note these bellow corrections for future reference;
Comment/Notes on the very bottom of PM checklist can't be blank. I have fixed it and re-attached to all your WO's.
Tech Finding Note; should be explaining kiosk condition upon tech arrival