📍 Publix 587 — 10128 Two Notch Road, Columbia SC, 29223
Jan 6, 2026 → Feb 5, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 19 biz days
🕐 Clock stopped: Completed (Feb 5, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸19d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 4, 2026
19 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 4 → Feb 4, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 4 → Feb 5, 2026
1 business day (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 5 → Feb 5, 2026
0 business days (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026Completed: Feb 5, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Feb 4
Ready for Release
⏸ Paused
19
—
Feb 4 → Feb 4
Assigned
▶ Running
0
1
Feb 4 → Feb 5
Scheduled
▶ Running
1
2
Feb 5 → Feb 5
Tech On Site
▶ Running
0
2
Holding21.6d (excluded)
Coordinators1.4d
Field Work0.4d
Billing1.6d
✗ SLA Missed
Holding(excluded from total)
21.6 days
Coordinators
1.4 days
Field Work
0.4 days
Billing
1.6 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Feb 5, 2026 (329 days early)
📅
21.6 daysTotal Age
⏱️
20.0d in Ready for ReleaseLongest Stage
🔄
10 transitionsStatus Changes
⚠️
2.8d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 57 days old
🚨
Primary Delay20.0 days stuck in "Ready for Release"
⏱️
Total Delay2.8 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
20.0d
Assigned
0.0d / 0.5d SLA
Scheduled
1.4d / 2.0d SLA
Tech On Site
0.3d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
4.8d / 1.0d SLA
WO Correction Needed
1.5d
Ready to Bill
0.1d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2.6.26 hshaw - missing FSR form with cust signature
🔧Work Performed
ATTEMPTED PM - ATTEMPTED TO GET POWER TO TOP SCREEN - ATTEMPTED RECALIBRATION TO MAIN SCREEN - REACHED OUT TO TECH SUPPORT LEFT VM
🔍Technician Findings
FOUND UNIT NEEDING PM - UNITS TOP SCREEN IS DEAD - RESEATED CONNECTIONS/ RESTARTED SYSTEM ISSUE REMAINED - MAIN SCREEN RIGHT SIDE NO TOUCH/ATTEMPTED CALIBRATION ISSUE REMAINED
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf