Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01331178 ↗ ServiceMax

HIGI LLC • Preventive Maintenance • PSM

📍 Meijer #204 — 10509 Heartland Blvd, Camby IN, 46113

Jan 6, 2026 → Feb 17, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 3 biz days
Paused: 26 biz days
🕐 Clock stopped: Completed (Feb 18, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸26d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 16, 2026
26 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 16 → Feb 17, 2026
1 business day (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 17 → Feb 18, 2026
1 business day (counted)
Running total: 3 of ? biz days used
Created: Jan 6, 2026 Completed: Feb 18, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jan 6 → Jan 7 Created ▶ Running 1 1
Jan 7 → Feb 16 Ready for Release ⏸ Paused 26
Feb 16 → Feb 16 Assigned ▶ Running 0 1
Feb 16 → Feb 17 Scheduled ▶ Running 1 2
Feb 17 → Feb 18 Tech On Site ▶ Running 1 3
Holding 28.6d (excluded)
Coordinators 1.0d
Field Work 1.0d
Billing 0.2d
✗ SLA Missed
Holding (excluded from total)
28.6 days
Coordinators
1.0 days
Field Work
1.0 days
Billing
0.2 days
Created: Jan 6, 2026 Due: Dec 31, 2026 Completed: Feb 18, 2026 (316 days early)
📅
29.1 days Total Age
⏱️
27.0d in Ready for Release Longest Stage
🔄
7 transitions Status Changes
⚠️
6.6d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 57 days old
🚨
Primary Delay 27.0 days stuck in "Ready for Release"
⏱️
Total Delay 6.6 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
27.0d
Scheduled
1.0d / 2.0d SLA
Tech On Site
1.0d / 1.0d SLA
Closed
7.6d / 1.0d SLA
Ready to Bill
0.2d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA

💬 Activities, Notes & Communications

🔧 Work Performed
PM Body fat test failed, kiosk not detecting body composition
🔍 Technician Findings
System online
⚠️ Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock ) Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄 Description
Higi Green Kiosk with 4G installed

Timeline

📋
Work Order Created Jan 6, 2:14 PM
Work Order: WO-01331178
Type: Preventive Maintenance
Priority: PSM
Status: Ready for Release by Stephanie Ramen Jan 7, 10:03 AM
From: On Hold
To: Ready for Release
Duration in Previous: 19h 48m
🚨 27.0 business days
👷
3 Technician Assigned Feb 16, 4:19 PM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Charles Ramen
From: Ready for Release, Assigned
To: Assigned, Scheduled
Duration in Previous: 40d 6h, 0m
📅
Dispatch Scheduled by Charles Ramen
Scheduled For: 2026-02-17T17:00:00.000+0000, 2026-02-17T17:30:00.000+0000
🔧
Status: Tech On Site by Vincent Nyathi Feb 17, 3:24 PM
From: Scheduled
To: Tech On Site
Duration in Previous: 23h 3m
🚗
Travel Added Feb 17, 11:00 PM
Type: Travel
Status: Open
Qty: 8.3
⏱️
2 2x Labor Added Feb 17, 11:15 PM
2x Labor Added → Status: Completed
✔️
Status: Completed by Vincent Nyathi
From: Tech On Site, Completed
To: Completed, Closed
Duration in Previous: 7h 54m, 0m
⚠️ 7.1 business days
📄
Status: Ready to Bill by Hannah Shaw Feb 26, 11:31 PM
From: Closed
To: Ready to Bill
Duration in Previous: 9d 0h
📨
3 Status: Invoice Pending Feb 27, 12:45 AM
Status: Invoice Pending → Invoice Created → Status: Invoiced
🧾
Invoice Created
Invoice Number: SM-255027
💰
Status: Invoiced by Hannah Shaw
From: Invoice Pending
To: Invoiced
Duration in Previous: 1m

Bottlenecks

Closed
Duration: 7.6 business days (threshold: 1.0 business days)
Exceeded by 6.6 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Preventive Maintenance
Branch
N/A
Technician
Vincent Nyathi
Scheduled
Feb 17, 12:30 PM
Created
Jan 6, 2:14 PM
Invoice #
SM-255027

Work Details (3)

Name Type Status Qty Amount Date
WL-03109750 Travel Open 8.3 $0.00 Feb 17, 11:00 PM
WL-03109800 Labor Open 1 $0.00 Feb 17, 11:15 PM
WL-03109801 Labor Open 0.41666666666667 $0.00 Feb 17, 11:15 PM

Details