Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed
Active: 2 biz days
Paused: 27 biz days
🕐 Clock stopped: Completed (Feb 18, 2026)
▶ Clock Running
Status: Created
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 1 of ? biz days used
⏸27d
⏸ Clock Paused
Status: Ready for Release
Jan 7 → Feb 17, 2026
27 business days (not counted)
▶ Clock Running
Status: Assigned
Feb 17 → Feb 17, 2026
0 business days (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Scheduled
Feb 17 → Feb 18, 2026
1 business day (counted)
Running total: 2 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 18 → Feb 18, 2026
0 business days (counted)
Running total: 2 of ? biz days used
Created: Jan 6, 2026Completed: Feb 18, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 6 → Jan 7
Created
▶ Running
1
1
Jan 7 → Feb 17
Ready for Release
⏸ Paused
27
—
Feb 17 → Feb 17
Assigned
▶ Running
0
1
Feb 17 → Feb 18
Scheduled
▶ Running
1
2
Feb 18 → Feb 18
Tech On Site
▶ Running
0
2
Holding29.6d (excluded)
Coordinators1.4d
Field Work0.8d
Billing0.1d
✗ SLA Missed
Holding(excluded from total)
29.6 days
Coordinators
1.4 days
Field Work
0.8 days
Billing
0.1 days
Created: Jan 6, 2026
Due: Dec 31, 2026
Completed: Feb 19, 2026 (315 days early)
📅
30.2 daysTotal Age
⏱️
28.0d in Ready for ReleaseLongest Stage
🔄
9 transitionsStatus Changes
⚠️
6.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
1 visitOn-Site Trips
👤
Self-ScheduledScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 57 days old
🚨
Primary Delay28.0 days stuck in "Ready for Release"
⏱️
Total Delay6.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
On Hold
1.6d
Ready for Release
28.0d
Assigned
0.0d / 0.5d SLA
Scheduled
1.4d / 2.0d SLA
Tech On Site
0.1d / 1.0d SLA
Completed
0.6d / 1.0d SLA
Closed
7.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
Performed a PM on higi kiosk. I checked all connections and did a user test.
🔍Technician Findings
Higi was on and running upon arrival. Tower and seat LEDs are out and the seat locking mechanism doesn’t work. Touchscreen has a discoloration line in the screen.
⚠️Problem Description
Please Perform a PM on this Kiosk and attach all required photos from the PM Checklist
Note this is a Non-retail account and requires a call to schedule. Please navigate to the location page for contact details
Regardless if a PM was completed or not a Checklist and photos are required as well as a signed field service report for every work order
If a follow up is needed: Confirm with Tech support, select New issue, enter in the troubleshooting performed and part needed for the follow up in the follow up notes field
Trunk stock work order: email dispatch@emsar.com with current work order # and the description of the repair that is required to be performed prior to PM completion (Example LED lights, bamboo seat replacement, Leveler replacement etc. all parts that can be found in your trunk stock )
Link to Work Instructions & Checklist on last page: SZZT (Higi Green) https://emsar-portal1.sharepoint.com/SOPs%20and%20Work%20Instructions/Higi%20&%20Legacy%20Kiosk%20Group/Higi%20Green/WI-ST-310%20Higi%20Green%20Preventative%20Maintenance.pdf
📄Description
Merge KMY Kiosk
Feb 20, 2026 1:54am
@Matthew Bateman please look at this one. No LED lights on hand and safety concern that was not called in to L2 nor was the unit documented to be taken out of service.
@Jessica Foley @Nicole Floyd can you please have someone call the store and put an out of order sign on this kiosk.