📍 Rutherford Regional Health System — 288 South Ridgecrest Avenue, Rutherfordton NC, 28139
Jan 8, 2026 → Jan 12, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✓ SLA Met (12 biz days early)
Active: 3 biz days
🕐 Clock stopped: Completed (Jan 13, 2026)
▶ Clock Running
Status: Assigned
Jan 8 → Jan 8, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 8 → Jan 8, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Entered
Jan 8 → Jan 8, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 8 → Jan 8, 2026
0 business days (counted)
Running total: 0 of ? biz days used
3d
▶ Clock Running
Status: Assigned
Jan 8 → Jan 13, 2026
3 business days (counted)
Running total: 3 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 13 → Jan 13, 2026
0 business days (counted)
Running total: 3 of ? biz days used
Created: Jan 8, 2026Completed: Jan 13, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 8 → Jan 8
Assigned
▶ Running
0
0
Jan 8 → Jan 8
Ready for Scheduling
▶ Running
0
0
Jan 8 → Jan 8
Entered
▶ Running
0
0
Jan 8 → Jan 8
Ready for Scheduling
▶ Running
0
0
Jan 8 → Jan 13
Assigned
▶ Running
3
3
Jan 13 → Jan 13
Tech On Site
▶ Running
0
3
Coordinators2.8d
Field Work0.0d
Billing0.1d
✓ SLA Met
Coordinators
2.8 days
Over SLA
Field Work
0.0 days
Billing
0.1 days
Created: Jan 8, 2026
Due: Jan 31, 2026
Completed: Jan 13, 2026 (18 days early)
📅
2.8 daysTotal Age
⏱️
2.7d in AssignedLongest Stage
🔄
8 transitionsStatus Changes
⚠️
2.2d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
5 linesWork Details
🏠
2 visitsOn-Site Trips
👤
Self-ScheduledScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Michael Swingle — scheduling delays attributed to technician, not coordinators
Visit 1Jan 11, 2026
Visit 2Jan 12, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 55 days old
🚨
Primary Delay2.7 days stuck in "Assigned"
⏱️
Total Delay2.2 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.2d / 1.0d SLA
Assigned
2.7d / 0.5d SLA
Tech On Site
0.0d / 1.0d SLA
Closed
1.0d / 1.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
0.0d / 2.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
1/8/26 AJinerson - WO appeared on maps layer as SC GE site, this got assigned incorrectly during mass assigning the SC GE PMs by accident due to placement on maps layer. Placing back into RFS.
🔧Work Performed
checked all functions of bed to ensure all were functioning properly. I checked electrical with analyzer, checked scale with 2 50 LB weights and checked side communications with side rail tester. all functions were within spec and working fine.