Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01337723 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD) • Overhaul • PSM

📍 Controls Corporation of America — 1501 Harpers Rd, Virginia Beach VA, 23454-5303

Jan 14, 2026 → Feb 13, 2026

✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (9 biz days late)
Active: 21 biz days
🕐 Clock stopped: Completed (Feb 13, 2026)
▶ Clock Running
Status: Created
Jan 14 → Jan 14, 2026
0 business days (counted)
Running total: 0 of ? biz days used
9d
▶ Clock Running
Status: Assigned
Jan 14 → Jan 28, 2026
9 business days (counted)
Running total: 9 of ? biz days used
5d
▶ Clock Running
Status: Tech On Site
Jan 28 → Feb 4, 2026
5 business days (counted)
Running total: 14 of ? biz days used
6d
▶ Clock Running
Status: Assigned
Feb 4 → Feb 12, 2026
6 business days (counted)
Running total: 20 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 12 → Feb 13, 2026
1 business day (counted)
Running total: 21 of ? biz days used
Created: Jan 14, 2026 Completed: Feb 13, 2026
Show SLA Clock Detail (5 periods)
Period Status Clock Biz Days Running Total
Jan 14 → Jan 14 Created ▶ Running 0 0
Jan 14 → Jan 28 Assigned ▶ Running 9 9
Jan 28 → Feb 4 Tech On Site ▶ Running 5 14
Feb 4 → Feb 12 Assigned ▶ Running 6 20
Feb 12 → Feb 13 Tech On Site ▶ Running 1 21
Dispatch 0.0d
Coordinators 16.5d
Field Work 7.6d
Billing 7.1d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
16.5 days
Over SLA
Field Work
7.6 days
Over SLA
Billing
7.1 days
Over SLA
Created: Jan 14, 2026 Due: Feb 14, 2026 Completed: Feb 13, 2026 (1 days early)
📅
22.0 days Total Age
⏱️
10.0d in Assigned Longest Stage
🔄
11 transitions Status Changes
⚠️
25.2d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
14 lines Work Details
🚩
3 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚩
3 On-Site Visits
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Charles Sellon — scheduling delays attributed to technician, not coordinators
Visit 1 Jan 28, 2026
Visit 2 Feb 2, 2026
Visit 3 Feb 4, 2026

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 49 days old
🚨
Primary Delay 10.0 days stuck in "Assigned"
⏱️
Total Delay 25.2 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
16.5d / 0.5d SLA
Tech On Site
7.6d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
0.8d / 1.0d SLA
Ready to Bill
1.3d / 1.0d SLA
Billing Review
0.0d / 2.0d SLA
Invoice Pending
5.8d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes
2/16/26 MMcNamara
Reference parts
R2150001                QTY    5
G8610-60009        QTY    1
642971015             QTY    1
R2040301               QTY    1
R2152301                QTY   1

 
🔧 Work Performed
1/28/2026 Evaluated for PM/Repair (Not). Spec-tube offset -10000008/-10000008. Test port 2.41 x 10-1. Covers damaged. Input power module loose and damaged. Overhaul needed. 2/2/2026 Removed vacuum system and cleaned, removed DS42 and installed new mechanical pump, cleaned inside of unit, replaced internal fan and replaced input power module. 2/4/2026 Got new exchange spec-tube, installed and restarted. Perform fine test procedure, record parameter. MDL/Helium Stability N/A Unit leak check ok replaced leaking block vent valve, fore line bellow. shut off unit, pack it up, ship unit back to customer.
🔍 Technician Findings
Bad spectrometer, Bad DS402 mechanical pump.
⚠️ Problem Description
Note 08.01.2026 08:12:13 WF-BATCH Agent: PIERCEB Timestamp: 2026-01-08 07:12:06 Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004262. Salesperson - Mike Wyant; mike.wyant@agilent.com; Mobile: 919-753-8802. Filaments Defective.
📄 Description
VS PR02 Portable Leak Detector
📞 Call Description
VPD Bench Repair Trade

Timeline

📋
3 Work Order Created Jan 14, 9:55 AM
Work Order Created → Status: Assigned → Technician Assigned
👷
Status: Assigned by Kim Pearson
From: Entered
To: Assigned
Duration in Previous: 0m
👷
Technician Assigned by Kim Pearson
Technician: Minh Huynh
🚨 10.0 business days
🔧
Status: Tech On Site by Charles Sellon Jan 28, 1:22 PM
From: Assigned
To: Tech On Site
Duration in Previous: 14d 3h
⏱️
Labor Added Jan 28, 2:32 PM
Type: Labor
Status: Open
Qty: 1
⚠️ 5.0 business days
⏱️
8x Labor Added Feb 3, 10:01 AM
Type: Labor, Parts
Status: Open
Qty: 5, 1, 2
🔩
Parts Added Feb 4, 9:42 AM
Type: Parts
Status: Open
Qty: 1
⏱️
2x Labor Added Feb 4, 2:50 PM
Type: Labor, Parts
Status: Open
Qty: 4, 1
👷
2 Technician Assigned Feb 4, 3:00 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kim Pearson
From: Tech On Site
To: Assigned
Duration in Previous: 7d 1h
⚠️ 7.0 business days
🔧
Status: Tech On Site by Charles Sellon Feb 12, 11:40 AM
From: Assigned
To: Tech On Site
Duration in Previous: 7d 20h
2.0 business days
🔩
2x Parts Added Feb 13, 12:29 PM
Type: Parts
Status: Open
Qty: 2, 1
✔️
Status: Completed by Minh Huynh Feb 13, 12:36 PM
From: Tech On Site
To: Completed
Duration in Previous: 1d 0h
🏁
Status: Closed by Minh Huynh Feb 13, 12:41 PM
From: Completed
To: Closed
Duration in Previous: 5m
1.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA Feb 16, 10:04 AM
From: Closed
To: Ready to Bill
Duration in Previous: 2d 21h
1.0 business days
💵
2 Status: Billing Review Feb 17, 9:26 PM
Status: Billing Review → Status: Ready to Bill
📄
Status: Ready to Bill by Hannah Shaw
From: Billing Review
To: Ready to Bill
Duration in Previous: 1m
📨
Status: Invoice Pending by Hannah Shaw Feb 17, 9:35 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 8m
⚠️ 5.5 business days
💰
2 Status: Invoiced Feb 25, 1:29 AM
Status: Invoiced → Invoice Created
🧾
Invoice Created
Invoice Number: SM-254235

Bottlenecks

Assigned
Duration: 10.0 business days (threshold: 4.0 business hours)
Exceeded by 9.5 business days
Tech On Site
Duration: 5.7 business days (threshold: 1.0 business days)
Exceeded by 4.7 business days
Assigned
Duration: 6.5 business days (threshold: 4.0 business hours)
Exceeded by 6.0 business days
Tech On Site
Duration: 1.9 business days (threshold: 1.0 business days)
Exceeded by 7.3 business hours
Ready to Bill
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.4 business hours
Invoice Pending
Duration: 5.8 business days (threshold: 2.0 business days)
Exceeded by 3.8 business days

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Overhaul
Branch
ERLA - PROD
Technician
Charles Sellon
Scheduled
N/A
Created
Jan 14, 9:55 AM
Invoice #
SM-254235

Work Details (14)

Name Type Status Qty Amount Date
WL-03081832 Labor Open 1 $0.00 Jan 28, 2:32 PM
WL-03089199 Labor Open 5 $960.00 Feb 3, 10:01 AM
WL-03089200 Parts Open 1 $0.00 Feb 3, 10:01 AM
WL-03089201 Parts Open 2 $0.00 Feb 3, 10:01 AM
WL-03089202 Parts Open 5 $0.00 Feb 3, 10:01 AM
WL-03089203 Parts Open 1 $0.00 Feb 3, 10:01 AM
WL-03089204 Parts Open 1 $0.00 Feb 3, 10:01 AM
WL-03089205 Parts Open 1 $0.00 Feb 3, 10:01 AM
WL-03089206 Parts Open 1 $0.00 Feb 3, 10:01 AM
WL-03090900 Parts Open 1 $0.00 Feb 4, 9:42 AM
WL-03091443 Labor Open 4 $0.00 Feb 4, 2:50 PM
WL-03091444 Parts Open 1 $0.00 Feb 4, 2:50 PM
WL-03105030 Parts Open 2 $0.00 Feb 13, 12:29 PM
WL-03105031 Parts Open 1 $0.00 Feb 13, 12:29 PM

Details