Last business day of January 2026 · Target: Jan 30, 2026
✓ SLA Met (6 biz days early)
Active: 4 biz days
🕐 Clock stopped: Tech Off Site (Jan 22, 2026)
▶ Clock Running
Status: Created
Jan 15 → Jan 15, 2026
0 business days (counted)
Running total: 0 of ? biz days used
1d
▶ Clock Running
Status: Assigned
Jan 15 → Jan 16, 2026
1 business day (counted)
Running total: 1 of ? biz days used
0d
▶ Clock Running
Status: Tech On Site
Jan 16 → Jan 19, 2026
0 business days (counted)
Running total: 1 of ? biz days used
3d
▶ Clock Running
Status: Assigned
Jan 19 → Jan 22, 2026
3 business days (counted)
Running total: 4 of ? biz days used
Created: Jan 15, 2026Tech Off Site: Jan 22, 2026
Show SLA Clock Detail (4 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 15 → Jan 15
Created
▶ Running
0
0
Jan 15 → Jan 16
Assigned
▶ Running
1
1
Jan 16 → Jan 19
Tech On Site
▶ Running
0
1
Jan 19 → Jan 22
Assigned
▶ Running
3
4
Dispatch0.0d
Coordinators5.0d
Field Work2.7d
Billing5.1d
✓ SLA Met
Dispatch
0.0 days
Coordinators
5.0 days
Over SLA
Field Work
2.7 days
Billing
5.1 days
Over SLA
Created: Jan 15, 2026
Due: Feb 15, 2026
Completed: Jan 23, 2026 (23 days early)
📅
6.0 daysTotal Age
⏱️
3.0d in AssignedLongest Stage
🔄
9 transitionsStatus Changes
⚠️
4.9d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
10 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 48 days old
🚨
Primary Delay3.0 days stuck in "Assigned"
⏱️
Total Delay4.9 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
5.0d / 0.5d SLA
Tech On Site
1.0d / 1.0d SLA
Tech Off Site
1.7d / 2.0d SLA
Closed
1.0d / 1.0d SLA
Billing Review
2.5d / 2.0d SLA
Ready to Bill
0.1d / 1.0d SLA
Invoice Pending
2.4d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
1/21/2026
Tim Dinh
Disassemble unit. Clean out spec-tube, Valve block, and chassis. Replace post, 2 filaments, metal seal, plunger, all O-rings, and internal calibrate leak. Drain oil from mechanical pump and replace.
Set up parameters of new calibrate leak. Reassemble unit tune, calibrate, and leak check unit. Unit has a gain on 1.8 on filament 1, and gain of 1.9 on filament 2. Button up and clean cover.
🔍Technician Findings
PM
⚠️Problem Description
Parts Prediction
13.01.2026 13:12:40 WF-BATCH
Agent: PIERCEB Timestamp: 2026-01-13 12:12:32
670029096
VSFLDHIS
VSFLDCL
VSFLDOV
695409005
____________________
Note
13.01.2026 13:12:40 WF-BATCH
Agent: PIERCEB Timestamp: 2026-01-13 12:12:32
Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004236.
Salesperson - Tim Matthias; tim.matthias@agilent.com; Mobile: 413-362-4556.
Cust requested PM, no issues.
📄Description
VS MR15 Mobile Leak Detector
📞Call Description
VPD Bench PM Trade
Jan 23, 2026 2:59pm
@Kim Pearson @MICHAEL MCNAMARA WO has been reviewed.
Timeline
📋
▶
3
Work Order Created Jan 15, 9:31 AM
Work Order Created → Technician Assigned → Status: Assigned
👷
Technician Assigned by Kim Pearson
Technician:a0hF00000051UGPIA2, Tami Dawe
👷
Status: Assigned by Kim Pearson
From:Entered
To:Assigned
Duration in Previous:2m
🔧
Status: Tech On Site by Shawn KelleyJan 16, 9:01 AM
From:Assigned
To:Tech On Site
Duration in Previous:23h 27m
⏳1.0 business days
👷
▶
2
Technician Assigned Jan 19, 6:22 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by MICHAEL MCNAMARA
From:Tech On Site
To:Assigned
Duration in Previous:2d 21h
⏳3.0 business days
🚗
Status: Tech Off Site by Tim DinhJan 22, 1:16 PM
From:Assigned
To:Tech Off Site
Duration in Previous:3d 6h
⏱️
▶
2
3x Labor Added Jan 22, 1:24 PM
3x Labor Added → 2x Travel Added
🚗
2x Travel Added
Type:Travel
Status:Open
Qty:55
🔩
5x Parts Added Jan 23, 6:46 AM
Type:Parts
Status:Open
Qty:1
✔️
Status: Completed by Tim DinhJan 23, 7:08 AM
From:Tech Off Site, Completed
To:Completed, Closed
Duration in Previous:17h 52m, 0m
💵
Status: Billing Review by Hannah ShawJan 23, 2:59 PM
From:Closed
To:Billing Review
Duration in Previous:7h 49m
⏳3.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARAJan 27, 2:22 PM
From:Billing Review
To:Ready to Bill
Duration in Previous:3d 23h
📨
Status: Invoice Pending by Hannah ShawJan 27, 3:31 PM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:1h 9m
⏳3.0 business days
💰
▶
2
Status: Invoiced Jan 29, 5:38 PM
Status: Invoiced → Invoice Created
🧾
Invoice Created
Invoice Number:SM-252373
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Assigned
Duration: 3.0 business days (threshold: 4.0 business hours)
Exceeded by 2.5 business days
Billing Review
Duration: 2.5 business days (threshold: 2.0 business days)
Exceeded by 4.0 business hours
Invoice Pending
Duration: 2.4 business days (threshold: 2.0 business days)