Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 23, 2026
✓ SLA Met (1 biz days early)
🕐 Clock stopped: Completed (Jan 22, 2026)
▶ Clock Running
Status: Created
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 0 of ? biz days used
0d
▶ Clock Running
Status: Assigned
Jan 22 → Jan 22, 2026
0 business days (counted)
Running total: 0 of ? biz days used
Created: Jan 22, 2026
Completed: Jan 22, 2026
Show SLA Clock Detail (2 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 22 → Jan 22
Created
▶ Running
0
0
Jan 22 → Jan 22
Assigned
▶ Running
0
0
Billing
2.0 days
Over SLA
Created: Jan 22, 2026
Due: Jan 23, 2026
Completed: Jan 22, 2026 (1 days early)
⏱️
2.0d in Ready to Bill
Longest Stage
🔄
5 transitions
Status Changes
📦
0 orders, 0 quotes
Parts & Quotes
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1
Jan 19, 2026
Visit 2
Jan 20, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
🚨
Primary Delay
2.0 days stuck in "Ready to Bill"
⏱️
Total Delay
1.0 business days over SLA thresholds
SLA vs Actual Time by Status
Ready to Bill
2.0d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (4)
🔒
Internal CSA Notes
1/22/26 MMcNamara Problem Description : Standard Service, base unit and 4 probes Technician Findings S2173 660nm 75mW Dental Probe BOM Issue 1 Rev 2 T1676 1. Needs 2 lightguides, none returned. S2173 660nm 75mW Dental Probe Issue 1 A8608 1. Needs 2 lightguides, none returned 2. Power too low with multiple light guides. Requires recalibration. Work Performed TR181 104 Cluster Probe (T1217) No additional work required TR179 660nm 75mW Probe (T1676) Light guides added and tested TR179 660nm 75mW Probe (A8608) 1. Light guides added and tested 2. Adjusted tip of the probe (laser diode, spacer, diffuser) Was able to get the probe to read in spec with both light guides. TR170 LX2.3 Control Unit (231071) No additional work required.
🔧
Work Performed
TR181 104 Cluster Probe (T1217)
No additional work required
TR179 660nm 75mW Probe (T1676)
Light guides added and tested
TR179 660nm 75mW Probe (A8608)
1. Light guides added and tested
2. Adjusted tip of the probe (laser diode, spacer, diffuser) Was able to get the probe to read in spec with both light guides.
TR170 LX2.3 Control Unit (231071)
No additional work required
🔍
Technician Findings
S2173 660nm 75mW Dental Probe BOM Issue 1 Rev 2 T1676
1. Needs 2 lightguides, none returned.
S2173 660nm 75mW Dental Probe Issue 1 A8608
1. Needs 2 lightguides, none returned
2. Power too low with multiple light guides. Requires recalibration.
⚠️
Problem Description
Standard Service, base unit and 4 probes
Timeline
📋
💵
Type:
Expenses
Status:
Open
Qty:
1
👷
Technician:
Mike McNamara
👷
From:
Entered
To:
Assigned
Duration in Previous:
1m
⏱️
Type:
Labor
Status:
Open
Qty:
1.5, 3.5
✔️
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
0m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
🧾
Invoice Number:
SM-252158
Bottlenecks
Ready to Bill
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Work Details (4)
Name
Type
Status
Qty
Amount
Date
WL-03074615
Expenses
Open
1
$0.00
Jan 22, 5:51 AM
WL-03074636
Labor
Open
1.5
$157.50
Jan 22, 6:18 AM
WL-03074637
Labor
Open
3.5
$367.50
Jan 22, 6:18 AM
WL-03074638
Labor
Open
1.5
$178.50
Jan 22, 6:18 AM