📍 CPC-Cryolab — 4430 E Adamo Dr Ste 305, Tampa FL, 33605
Jan 29, 2026 → Feb 26, 2026
✅ Completed
PSM
SLA Clock
Last business day of January 2026 · Target: Jan 30, 2026
✗ SLA Missed (18 biz days late)
Active: 20 biz days
🕐 Clock stopped: Completed (Feb 27, 2026)
▶ Clock Running
Status: Created
Jan 29 → Jan 29, 2026
0 business days (counted)
Running total: 0 of ? biz days used
13d
▶ Clock Running
Status: Assigned
Jan 29 → Feb 18, 2026
13 business days (counted)
Running total: 13 of ? biz days used
7d
▶ Clock Running
Status: Tech On Site
Feb 18 → Feb 27, 2026
7 business days (counted)
Running total: 20 of ? biz days used
Created: Jan 29, 2026Completed: Feb 27, 2026
Show SLA Clock Detail (3 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 29 → Jan 29
Created
▶ Running
0
0
Jan 29 → Feb 18
Assigned
▶ Running
13
13
Feb 18 → Feb 27
Tech On Site
▶ Running
7
20
Dispatch0.0d
Coordinators14.0d
Field Work8.0d
Billing3.5d
✗ SLA Missed
Dispatch
0.0 days
Coordinators
14.0 days
Over SLA
Field Work
8.0 days
Over SLA
Billing
3.5 days
Over SLA
Created: Jan 29, 2026
Due: Mar 1, 2026
Completed: Feb 26, 2026 (3 days early)
📅
20.0 daysTotal Age
⏱️
14.0d in AssignedLongest Stage
🔄
8 transitionsStatus Changes
⚠️
22.2d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
7 linesWork Details
🏠
2 visitsOn-Site Trips
📋
CoordinatorScheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
Visit 1Feb 19, 2026
Visit 2Feb 20, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with significant delays
Invoiced • 34 days old
🚨
Primary Delay14.0 days stuck in "Assigned"
⏱️
Total Delay22.2 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
14.0d / 0.5d SLA
Tech On Site
8.0d / 1.0d SLA
Completed
0.0d / 1.0d SLA
Closed
2.0d / 1.0d SLA
Billing Review
0.2d / 2.0d SLA
Ready to Bill
1.7d / 1.0d SLA
Invoice Pending
1.6d / 2.0d SLA
💬 Activities, Notes & Communications
🔧Work Performed
2/18/2026 Evaluation found fil 1 out. Unit calibrates with a gain of 4 with fil 2. No rough pump sent in. Leak rate in 9 range.
2/19/2026 Cleaned spec-tube and replaced filaments. Cleaned vacuum system. Reassembled and started.
2/24/2026 Leak around Internal leak valve. Replaced and restarted.
2/26/2026 Perform fine test procedure, record parameter, chart record N/A. unit leak check ok
shut off unit, pack it up, ship unit back to customer.
🔍Technician Findings
Filament #1 burnt out, Filament #2 High gain of 4
⚠️Problem Description
Note
21.01.2026 15:21:16 WF-BATCH
Agent: PIERCEB Timestamp: 2026-01-21 14:21:09
Machine won't pull down to its required range 1x10-09. The problem appears to be a drifting background, where you can zero it out but the signal comes back almost instantly.
____________________
Parts Prediction
21.01.2026 09:00:00 WF-BATCH
Agent: PIERCEB Timestamp: 2026-01-21 07:59:53
670029096
VSFLDHIS
VSFLDCL
VSFLDOV
695409005
G8603-60002
____________________
Note
21.01.2026 09:00:00 WF-BATCH
Agent: PIERCEB Timestamp: 2026-01-21 07:59:53
Once the quotation has been accepted, please create a service order and assign it to the service employee group 98004236.
Salesperson - Mike Wyant; mike.wyant@agilent.com; Mobile: 919-753-8802.
Machine won't pull down to its required range 1x10-09.
📄Description
BR15
📞Call Description
VPD Bench Overhaul Trade
Mar 2, 2026 7:11am
@MICHAEL MCNAMARA @Kim Pearson WO has been reviewed. Thank you
Timeline
📋
▶
3
Work Order Created Jan 29, 10:25 AM
Work Order Created → Technician Assigned → Status: Assigned
👷
Technician Assigned by Kim Pearson
Technician:Minh Huynh
👷
Status: Assigned by Kim Pearson
From:Entered
To:Assigned
Duration in Previous:0m
🚨14.0 business days
🔧
Status: Tech On Site by Charles SellonFeb 18, 10:30 AM
From:Assigned
To:Tech On Site
Duration in Previous:20d 0h
⏳3.0 business days
⏱️
5x Labor Added Feb 20, 7:53 AM
Type:Labor, Parts
Status:Open
Qty:4, 1
⏳3.0 business days
🔩
2x Parts Added Feb 24, 9:03 AM
Type:Parts
Status:Open
Qty:1
⏳4.0 business days
✔️
▶
2
Status: Completed Feb 27, 8:43 AM
Status: Completed → Status: Closed
🏁
Status: Closed by Minh Huynh
From:Completed
To:Closed
Duration in Previous:3m
⏳1.9 business days
💵
Status: Billing Review by Hannah ShawMar 2, 7:11 AM
From:Closed
To:Billing Review
Duration in Previous:2d 22h
📄
Status: Ready to Bill by MICHAEL MCNAMARAMar 2, 9:08 AM
From:Billing Review
To:Ready to Bill
Duration in Previous:1h 56m
📨
Status: Invoice Pending by Hannah ShawMar 3, 12:57 AM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:15h 48m
🧾
▶
2
Invoice Created Mar 3, 11:27 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Hannah Shaw
From:Invoice Pending
To:Invoiced
Duration in Previous:22h 29m
Bottlenecks
Assigned
Duration: 14.0 business days (threshold: 4.0 business hours)
Exceeded by 13.5 business days
Tech On Site
Duration: 8.0 business days (threshold: 1.0 business days)
Exceeded by 7.0 business days
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 1.7 business days (threshold: 1.0 business days)