Created: Feb 10, 2026
Due: Feb 13, 2026
Completed: Feb 10, 2026 (3 days early)
📅
0.1 daysTotal Age
⏱️
2.0d in Ready to BillLongest Stage
🔄
4 transitionsStatus Changes
⚠️
1.0d overTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Invoiced • 22 days old
🚨
Primary Delay2.0 days stuck in "Ready to Bill"
⏱️
Total Delay1.0 business days over SLA thresholds
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.0d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Ready to Bill
2.0d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/10/26 MMcNamara
Problem Description: Loaner Return recertification. LX2.3 and 3 probes.
Technician Findings : Unit will require complete recertification . Unit was not returned with 2 lightguides for the dental probe and will require configuration with 2 new ones.
Work Performed: Full qualification test performed. Two new lightguides configured with the dental probe.
🔧Work Performed
Full qualification test performed. Two new lightguides configured with the dental probe.
🔍Technician Findings
Unit will require complete recertification . Unit was not returned with 2 lightguides for the dental probe and will require configuration with 2 new ones.