Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01353637 ↗ ServiceMax

GE Healthcare FMI • FCO • PC

📍 Ben Taub Hospital — 1504 Ben Taub Loop, Houston Tx, 77030

Feb 24, 2026 → Mar 4, 2026

✅ Completed
PC
SLA Clock
Per client agreement · Target: Apr 27, 2026
✓ SLA Met (37 biz days early)
Active: 6 biz days
🕐 Clock stopped: Completed (Mar 5, 2026)
1d
▶ Clock Running
Status: Created
Feb 25 → Feb 26, 2026
1 business day (counted)
Running total: 1 of ? biz days used
▶ Clock Running
Status: Assigned
Feb 26 → Feb 26, 2026
0 business days (counted)
Running total: 1 of ? biz days used
4d
▶ Clock Running
Status: Scheduled
Feb 26 → Mar 4, 2026
4 business days (counted)
Running total: 5 of ? biz days used
▶ Clock Running
Status: Tech On Site
Mar 4 → Mar 5, 2026
1 business day (counted)
Running total: 6 of ? biz days used
Created: Feb 25, 2026 Completed: Mar 5, 2026
Show SLA Clock Detail (4 periods)
Period Status Clock Biz Days Running Total
Feb 25 → Feb 26 Created ▶ Running 1 1
Feb 26 → Feb 26 Assigned ▶ Running 0 1
Feb 26 → Mar 4 Scheduled ▶ Running 4 5
Mar 4 → Mar 5 Tech On Site ▶ Running 1 6
Dispatch 2.0d
Coordinators 5.0d
Field Work 1.1d
✓ SLA Met
Dispatch
2.0 days
Over SLA
Coordinators
5.0 days
Over SLA
Field Work
1.1 days
Over SLA
Created: Feb 25, 2026 Due: Apr 27, 2026 Completed: Mar 5, 2026 (53 days early)
📅
6.1 days Total Age
⏱️
5.0d in Scheduled Longest Stage
🔄
4 transitions Status Changes
⚠️
4.6d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
3 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...
Completed with minor delays
Closed • 8 days old
🚨
Primary Delay 5.0 days stuck in "Scheduled"
⏱️
Total Delay 4.6 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
2.0d / 0.5d SLA
Scheduled
5.0d / 2.0d SLA
Tech On Site
1.1d / 1.0d SLA
Completed
0.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

02/26/2026 MNewman - dispatching for March 6th per Teams message from Marvin

🔧 Work Performed
Template Name: FMI32097_Code 1_part_replace. Template Description: FMI32097_Code 1_part_replace. Problem Found: FMI32097_Heater door replacement. Action Taken: FMI 32097 completed. Inspected the Heater doors. Heater doors found to be damaged. Replaced both heater doors as per Service Manual Addendum (5971733) and screws tightened as per instructions. Verification Test: 1. Verified the canopy moves smoothly. 2. Verified transition mode message is not present. 3. Verified doors close smoothly. 4. Verified corner pins are aligned. 5. Verified no alarms. The device has passed all tests and is ready for customer use.
🔍 Technician Findings
FMI 32097 implemented.
⚠️ Problem Description
FMI 32097:- Inspection of heater door screws for Giraffe OmniBed and Giraffe OmniBed Carestation Purpose:- Certain Giraffe OmniBed and Giraffe OmniBed Carestation may have defective heater doors due to improper torquing of heater door screws. FMI Type: Mandatory Recall FMI For code 2, 3, 4 and 5 closures, please reach out to FMI admin team at tcs.fmiadmins@gehealthcare.com or 8668836784 – OPT. 5 for assistance in closing and correct objective evidence attachment to Activity/SR.
📄 Description
GE Healthcare Giraffe OmniBed Carestation CS1
📞 Call Description
FMI 32097

Timeline

📋
Work Order Created Feb 24, 7:27 PM
Work Order: WO-01353637
Type: FCO
Priority: PC
2.6 business days
👷
3 Technician Assigned Feb 26, 11:14 AM
Technician Assigned → Status: Assigned → Dispatch Scheduled
👷
Status: Assigned by Mandy Newman
From: Entered, Assigned
To: Assigned, Scheduled
Duration in Previous: 1d 15h, 0m
📅
Dispatch Scheduled by Mandy Newman
Scheduled For: 2026-03-06T13:00:00.000+0000
⚠️ 5.0 business days
🔧
Status: Tech On Site by Marvin Rivas Mar 4, 11:12 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 5d 23h
⏱️
2 2x Labor Added Mar 4, 7:34 PM
2x Labor Added → Labor Added
⏱️
Labor Added
Type: Labor
Status: Open
Qty: 1.5
✔️
2 Status: Completed Mar 4, 7:55 PM
Status: Completed → Status: Closed
🏁
Status: Closed by Marvin Rivas
From: Completed
To: Closed
Duration in Previous: 3m

Bottlenecks

Entered
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 5.0 business days (threshold: 2.0 business days)
Exceeded by 3.0 business days
Tech On Site
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.7 business hours

🔗 Related Artifacts

No related artifacts

ℹ️ Work Order Details

Status
Closed
Priority
PC
Type
FCO
Branch
N/A
Technician
Marvin Rivas
Scheduled
Mar 6, 8:00 AM
Created
Feb 24, 7:27 PM
Invoice #
N/A

Work Details (3)

Name Type Status Qty Amount Date
WL-03130662 Labor Open 1 $100.00 Mar 4, 7:34 PM
WL-03130663 Travel Open 25 $0.00 Mar 4, 7:34 PM
WL-03130665 Labor Open 1.5 $100.00 Mar 4, 7:35 PM

Details