TR170 LX2.3 Control Unit (231040) Requires full qualification testing,
Work Performed:: Rework Summary 24-Feb-2026 TR179 660nm 75mW Probe (T0426) Configured with a new light guide.
TR181 104 Cluster Probe (T1211) No additional work required.
TR170 LX2.3 Control Unit (231040) Requires full qualification testing, Standard test performed. Completed.
🔧Work Performed
Rework Summary
Repair Completed Date
24-Feb-2026
TR179 660nm 75mW Probe (T0426)
Configured with a new light guide
TR181 104 Cluster Probe (T1211)
No additional work required
TR170 LX2.3 Control Unit (231040)
Requires full qualification testing, Standard test performed. Completed.
🔍Technician Findings
S2173 660nm 75mW Dental Probe Issue 1 T0426
Missing 1 lightguide.
TR170 LX2.3 Control Unit (231040)
Requires full qualification testing, Standard test performed.
⚠️Problem Description
Thor loaner return
Timeline
📋
▶
4
Work Order Created Feb 27, 6:32 AM
Work Order Created → Expenses Added → Technician Assigned → Status: Assigned
💵
Expenses Added
Type:Expenses
Status:Open
Qty:1
👷
Technician Assigned by MICHAEL MCNAMARA
Technician:Mike McNamara
👷
Status: Assigned by MICHAEL MCNAMARA
From:Entered
To:Assigned
Duration in Previous:2m
⏱️
Labor Added Feb 27, 6:41 AM
Type:Labor
Status:Open
Qty:0.25
⏱️
▶
2
2x Labor Added Feb 27, 6:46 AM
2x Labor Added → Labor Added
⏱️
Labor Added
Type:Labor
Status:Open
Qty:1.5
✔️
Status: Completed by MICHAEL MCNAMARAFeb 27, 6:53 AM
From:Assigned, Completed, Closed, Billing Review
To:Completed, Closed, Billing Review, Ready to Bill