Created: Feb 27, 2026
Due: Feb 27, 2026
Completed: Feb 27, 2026 (on time)
📅
0.1 daysTotal Age
⏱️
0.7d in Ready to BillLongest Stage
🔄
5 transitionsStatus Changes
✅
On timeTotal Delay
📦
0 orders, 0 quotesParts & Quotes
📝
4 linesWork Details
🏠
1 visitOn-Site Trips
📋
CoordinatorScheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
Completed on schedule
Invoiced • 5 days old
✅
No IssuesWork order progressed without significant delays
SLA vs Actual Time by Status
Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Assigned
0.1d / 0.5d SLA
Completed
0.0d / 1.0d SLA
Closed
0.0d / 1.0d SLA
Ready to Bill
0.7d / 1.0d SLA
💬 Activities, Notes & Communications
🔒Internal CSA Notes
2/27/26 MMcNamara
Problem Description: Thor loaner return.
Technician Findings: TR200 S2197 LED Lollipop (T1339) No work required.
TR181 104 Cluster Probe (T1485) No work required.
TR170 LX2.3 Control Unit (231018) Functional test only.
Work Performed: TR200 S2197 LED Lollipop (T1339) No work required.
TR181 104 Cluster Probe (T1485) No work required
TR170 LX2.3 Control Unit (231018) Functional test only. Completed.
🔧Work Performed
TR200 S2197 LED Lollipop (T1339)
No work required
TR181 104 Cluster Probe (T1485)
No work required
TR170 LX2.3 Control Unit (231018)
Functional test only. Completed.
🔍Technician Findings
TR200 S2197 LED Lollipop (T1339)
No work required
TR181 104 Cluster Probe (T1485)
No work required
TR170 LX2.3 Control Unit (231018)
Functional test only.
⚠️Problem Description
Thor loaner return
Timeline
📋
▶
4
Work Order Created Feb 27, 7:25 AM
Work Order Created → Expenses Added → Technician Assigned → Status: Assigned