Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01280408 ↗ ServiceMax

AGILENT TECHNOLOGIES (VPD-FIELD) • Overhaul • PSM

📍 BE AEROSPACE INC — 15701 W 95th St, LENEXA KS, 66219

Jun 18, 2025 → Sep 7, 2025

✅ Completed
PSM
SLA Clock
Last business day of June 2025 · Target: Jun 30, 2025
✗ SLA Missed (42 biz days late)
Active: 50 biz days
Paused: 4 biz days
🕐 Clock stopped: Completed (Sep 5, 2025)
▶ Clock Running
Status: Created
Jun 18 → Jun 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jun 18 → Jun 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
10d
▶ Clock Running
Status: Assigned
Jun 18 → Jul 3, 2025
10 business days (counted)
Running total: 10 of ? biz days used
⏸4d
⏸ Clock Paused
Status: Awaiting Parts - Customer
Jul 3 → Jul 10, 2025
4 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Jul 10 → Jul 10, 2025
0 business days (counted)
Running total: 10 of ? biz days used
▶ Clock Running
Status: Assigned
Jul 10 → Jul 14, 2025
2 business days (counted)
Running total: 12 of ? biz days used
14d
▶ Clock Running
Status: Scheduled
Jul 14 → Aug 3, 2025
14 business days (counted)
Running total: 26 of ? biz days used
▶ Clock Running
Status: Completed
Aug 3 → Aug 3, 2025
0 business days (counted)
Running total: 26 of ? biz days used
▶ Clock Running
Status: Closed
Aug 3 → Aug 4, 2025
1 business day (counted)
Running total: 27 of ? biz days used
▶ Clock Running
Status: On Hold
Aug 4 → Aug 4, 2025
0 business days (counted)
Running total: 27 of ? biz days used
⏸ Clock Paused
Status: Awaiting Parts
Aug 4 → Aug 4, 2025
0 business days (not counted)
10d
▶ Clock Running
Status: Scheduled
Aug 4 → Aug 18, 2025
10 business days (counted)
Running total: 37 of ? biz days used
▶ Clock Running
Status: Reschedule
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 37 of ? biz days used
6d
▶ Clock Running
Status: Scheduled
Aug 18 → Aug 26, 2025
6 business days (counted)
Running total: 43 of ? biz days used
▶ Clock Running
Status: Tech On Site
Aug 26 → Aug 27, 2025
1 business day (counted)
Running total: 44 of ? biz days used
5d
▶ Clock Running
Status: Scheduled
Aug 27 → Sep 4, 2025
5 business days (counted)
Running total: 49 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 4 → Sep 5, 2025
1 business day (counted)
Running total: 50 of ? biz days used
Created: Jun 18, 2025 Completed: Sep 5, 2025
Show SLA Clock Detail (17 periods)
Period Status Clock Biz Days Running Total
Jun 18 → Jun 18 Created ▶ Running 0 0
Jun 18 → Jun 18 Ready for Scheduling ▶ Running 0 0
Jun 18 → Jul 3 Assigned ▶ Running 10 10
Jul 3 → Jul 10 Awaiting Parts - Customer ⏸ Paused 4
Jul 10 → Jul 10 Ready for Scheduling ▶ Running 0 10
Jul 10 → Jul 14 Assigned ▶ Running 2 12
Jul 14 → Aug 3 Scheduled ▶ Running 14 26
Aug 3 → Aug 3 Completed ▶ Running 0 26
Aug 3 → Aug 4 Closed ▶ Running 1 27
Aug 4 → Aug 4 On Hold ▶ Running 0 27
Aug 4 → Aug 4 Awaiting Parts ⏸ Paused 0
Aug 4 → Aug 18 Scheduled ▶ Running 10 37
Aug 18 → Aug 18 Reschedule ▶ Running 0 37
Aug 18 → Aug 26 Scheduled ▶ Running 6 43
Aug 26 → Aug 27 Tech On Site ▶ Running 1 44
Aug 27 → Sep 4 Scheduled ▶ Running 5 49
Sep 4 → Sep 5 Tech On Site ▶ Running 1 50
Dispatch 0.0d
Material Management 5.7d
Holding 0.3d (excluded)
Coordinators 52.3d
Field Work 5.3d
Billing 4.1d
✗ SLA Missed
Dispatch
0.0 days
Material Management
5.7 days
Holding (excluded from total)
0.3 days
Coordinators
52.3 days
Over SLA
Field Work
5.3 days
Over SLA
Billing
4.1 days
Over SLA
Created: Jun 18, 2025 Due: Aug 12, 2025 Completed: Sep 8, 2025 (26 days late)
📅
55.3 days Total Age
⏱️
15.0d in Scheduled Longest Stage
🔄
24 transitions Status Changes
⚠️
49.3d over Total Delay
📦
0 orders, 0 quotes Parts & Quotes
📝
39 lines Work Details
🚩
6 visits On-Site Trips
👤
Self-Scheduled Scheduling
🚨
6 On-Site Visits (1 reschedule)
6 on-site visits — critical red flag: repeated failure to resolve
👤 Self-scheduled by Curtis Sprague — scheduling delays attributed to technician, not coordinators
Visit 1 Jul 30, 2025
Visit 2 Aug 1, 2025
Visit 3 Aug 25, 2025
Visit 4 Aug 26, 2025
Visit 5 Sep 3, 2025
Visit 6 Sep 4, 2025

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00502981
6007862993
Closed
Note 06/17/2025 15:23:40 MOHPANDE [06-17-2025 ATI RM TEAM Mohit Pandey] Part VSFLDHIS “HOT ION SOURCE KIT” Qty-1 is on Backorder in 2810. Nothing is in transit and WW. Expedited with the Controller via email to improve the date. Part controllers are expected to respond within 24 hours and we will update as soon as we receive a response. Email sent to FSE and Controller. ____________________ Note 06/17/2025 13:07:52 PIERCEB Instrument repaired earlier under SO#6007757348. Customer has not stated - "We had this leak detector repaired in May, a week afterwards we heard some additional noise on the system, it eventually disappeared and was operating correctly. Today when we tried to power it up it became stuck in the fault “Hold (System Pressure wait)” and will not let us start a new cycle." See attached email ____________________ Note 04/28/2025 16:44:19 RUTIWARI [04-28-2025 ATI RM TEAM Ruchi Tiwari] Part VSFLDHIS “HOT ION SOURCE KIT” Qty 1: may be available in 2810 Location. Email sent to LCA to review the stock. Part # VSFLDCL “VS SERIES CALIBRATED LEAK REPLACEMENT” Qty-1 is on Backorder in 2810. Part is in transit from MY10 Plant to 2810 with an ETA of 05/06/2025 under PO # 2352058172 with AWB # 287973249107 . Once stock is received at 2810 shipment will be made. ____________________ Parts Prediction 04/28/2025 15:22:00 WF-BATCH Agent: WIGEORGE Timestamp: 2025-04-28 15:21:48 670029096 VSFLDHIS VSFLDCL VSFLDOV VSFLDDP X3828-69510 G8603-60002 ____________________ Note 04/28/2025 15:22:00 WF-BATCH Agent: WIGEORGE Timestamp: 2025-04-28 15:21:48 warranty overhaul; spec tube error; suspect scroll sales Matsua Garcia-Mendez matsua.garcia-mendez@agilent.com
Priority
High
Origin
Web
Reason
New Case
Contact
Nina Zepeda
Owner
Leona Coonrod
Created
Jun 18, 2025
Work Orders from this Case (1)
WO-01280408 (current) Invoiced
Overhaul • Curtis Sprague
Created: Jun 18, 2025 • Closed: Sep 7, 2025
Completed with significant delays
Invoiced • 259 days old
🚨
Primary Delay 15.0 days stuck in "Scheduled"
⏱️
Total Delay 49.3 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
Ready for Scheduling
0.3d / 1.0d SLA
Assigned
13.2d / 0.5d SLA
Awaiting Parts - Customer
5.0d
Scheduled
38.8d / 2.0d SLA
Completed
1.3d / 1.0d SLA
Closed
6.0d / 1.0d SLA
On Hold
0.3d
Awaiting Parts
0.7d / 3.0d SLA
Reschedule
0.0d / 2.0d SLA
Tech On Site
4.0d / 1.0d SLA
WO Correction Needed
2.0d
Ready to Bill
2.0d / 1.0d SLA
Invoice Pending
0.1d / 2.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

9/8/25 CDempsey- put wo into correction per request from Curtis.

9/5/25 CDempsey- Jim Smalley got laptop working. Curtis can now complete paperwork.

8/18 KKelch scheduled per logged email from Nina

8/18 KKelch sent Nina an email for rescheduling due to FSE calling out sick

8/7/25 lcoonrod

391684405380 Delivered Monday, 8/4/25 at 9:13 AM Signed for by: J.BLOOMER



8/4 KKelch scheduled per logged email from Nina

8/4/25 MMcNamara: Waiting for parts EX9699518M001 and EX8699367. SCHEDULED DELIVERY DATE8/4/25 before 10:30 Am.


7/31 KKelch rescheduled per logged email from Nina. Delayed due to lost luggage

7/14 KHensley scheduled per logged email from Nina. This was scheduled past the due date due to parts/tech availability

7/11 KHensley- per logged email from POC Nina, she is on PTO until 7/14

7/10 KHensley called Nina to schedule for 7/22 between 9 and 10 am. Unable to leave VM, sent email.

7/10/25 lcoonrod

shipped.

Way bill 390101609227Delivered on 6/18/25Way bill 390101643851Delivered on 6/18/25Way bill 390850434127Delivery date 7/10/25

 

7/1/25 lcoonrod

part VSFLDHIS still showing on back order.

 

7/1 KHensley sent LCoonrod a chatter for update on parts

6/30/25 CDempsey- still waiting on parts

6/27/25 lcoonrod

VSFLDHIS still on back order

6/24 KHensley called Nina to let her know that the parts needed are currently on back order and that we are waiting to schedule until then. Left VM. 

6/23/25 lcoonrod

VSFLDHIS still on back order

6/18/25 lcoonrod parts 670029096, VSFLDOV, KC25SV and EX8699367 shipped on way bill 390101609227 part VSFLDHIS is back ordered

__PRESENT

🔧 Work Performed
Returned to site. Met with POC Zack Keith. Zack brought in another unit for PM. Replaced all parts that were provided to customer. Cleaned spec tube out due to burning from filaments. Unit's turbo would not go past 45000 RPM, even after replacing the old turbo with the one provided by Agilent. 10[2/25 MMcnamara Unit was shipped to Billerica for repair under SO 6008051721, WO 01303428. Analysis showed a bent spec tube connector and a DEFOA turbopump was sent to repair the unit creating a comples troubleshooting scnerio Spoke with George on the phone and tried to troubleshoot why turbo still wasn't working. Determined that it was possibly the control board for turbo or the turbo itself was bad. 8/26/25 Curtis: Arrived onsite and checked in with POC Nina. I replaced the turbo and turbo control board. Unit was only getting to 7500 rpm before I installed new turbo and board. Now the unit was getting to 35000 rpm. Checked on the diaphram pump. Diaphragm pump was destroyed on the inside. Spoke with George from Agilent and ordered a new diaphragm pump. Will have to return to install. 9/4/2025 Curtis: Installed diaphragm pump. This didnt fix the issue of the turbo not exceeding 30,000 RPM. Called and spoke to George and Bruce at Agilent and collectively decided that unit needs to be shipped to Mike McNamara to be rebuilt. 9/9/25 MMcNamara- To test the scroll pump on the defective unit, Curtis hooked the scroll to a non defective leak detector. The scroll from the defective unit worked fine in the non defective leak detector. 10/2/25 MMcnamara Unit sent to Billerica for advanced troubleshooting (6008051721). Unit had a deformed spectube connection and a DEFOA turbopump was sent to repair the unit in the field.
🔍 Technician Findings
See worked performed.
⚠️ Problem Description
Note 06/17/2025 15:23:40 MOHPANDE [06-17-2025 ATI RM TEAM Mohit Pandey] Part VSFLDHIS “HOT ION SOURCE KIT” Qty-1 is on Backorder in 2810. Nothing is in transit and WW. Expedited with the Controller via email to improve the date. Part controllers are expected to respond within 24 hours and we will update as soon as we receive a response. Email sent to FSE and Controller. ____________________ Note 06/17/2025 13:07:52 PIERCEB Instrument repaired earlier under SO#6007757348. Customer has not stated - "We had this leak detector repaired in May, a week afterwards we heard some additional noise on the system, it eventually disappeared and was operating correctly. Today when we tried to power it up it became stuck in the fault “Hold (System Pressure wait)” and will not let us start a new cycle." See attached email ____________________ Note 04/28/2025 16:44:19 RUTIWARI [04-28-2025 ATI RM TEAM Ruchi Tiwari] Part VSFLDHIS “HOT ION SOURCE KIT” Qty 1: may be available in 2810 Location. Email sent to LCA to review the stock. Part # VSFLDCL “VS SERIES CALIBRATED LEAK REPLACEMENT” Qty-1 is on Backorder in 2810. Part is in transit from MY10 Plant to 2810 with an ETA of 05/06/2025 under PO # 2352058172 with AWB # 287973249107 . Once stock is received at 2810 shipment will be made. ____________________ Parts Prediction 04/28/2025 15:22:00 WF-BATCH Agent: WIGEORGE Timestamp: 2025-04-28 15:21:48 670029096 VSFLDHIS VSFLDCL VSFLDOV VSFLDDP X3828-69510 G8603-60002 ____________________ Note 04/28/2025 15:22:00 WF-BATCH Agent: WIGEORGE Timestamp: 2025-04-28 15:21:48 warranty overhaul; spec tube error; suspect scroll sales Matsua Garcia-Mendez matsua.garcia-mendez@agilent.com
📄 Description
Helium Leak Detector, BD30 configuration
📞 Call Description
VPD Field Re-Repair Trade

Timeline

📞
3 Case Linked Jun 18, 8:25 AM
Case Linked → Work Order Created → 5x Parts Added
📋
Work Order Created
Work Order: WO-01280408
Type: Overhaul
Priority: PSM
🔩
5x Parts Added
Type: Parts
Status: Open
Qty: 1
📅
Status: Ready for Scheduling by Leona Coonrod Jun 18, 8:30 AM
From: Entered
To: Ready for Scheduling
Duration in Previous: 2m
👷
2 Technician Assigned Jun 18, 8:58 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 27m
🚨 10.0 business days
👤
Status: Awaiting Parts - Customer by Stephanie Ramen Jul 2, 9:34 PM
From: Assigned
To: Awaiting Parts - Customer
Duration in Previous: 14d 12h
⚠️ 5.3 business days
📅
Status: Ready for Scheduling by Leona Coonrod Jul 10, 9:16 AM
From: Awaiting Parts - Customer
To: Ready for Scheduling
Duration in Previous: 7d 11h
👷
2 Technician Assigned Jul 10, 11:16 AM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Kaitlyn Kelch
From: Ready for Scheduling
To: Assigned
Duration in Previous: 2h 0m
3.0 business days
🗓️
2 Status: Scheduled Jul 14, 9:04 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-07-31T14:00:00.000+0000
💵
3x Expenses Added Jul 14, 11:47 AM
Type: Expenses
Status: Open
Qty: 1
🚨 14.0 business days
📅
Dispatch Scheduled by Kaitlyn Kelch Jul 31, 3:35 PM
Scheduled For: 2025-08-01T12:00:00.000+0000
💵
Expenses Added Aug 1, 11:21 AM
Type: Expenses
Status: Open
Qty: 1
⏱️
5x Labor Added Aug 1, 6:36 PM
Type: Labor, Travel
Status: Open
Qty: 8, 0.5, 830, 12
0.7 business days
💵
3 5x Expenses Added Aug 3, 6:37 PM
5x Expenses Added → Status: Completed → Expenses Added
✔️
Status: Completed by Curtis Sprague
From: Scheduled
To: Completed
Duration in Previous: 20d 9h
💵
Expenses Added
Type: Expenses
Status: Open
Qty: 1
🏁
Status: Closed by Curtis Sprague Aug 3, 7:30 PM
From: Completed
To: Closed
Duration in Previous: 50m
⏸️
2 Status: On Hold Aug 4, 6:40 AM
Status: On Hold → Status: Awaiting Parts
📦
Status: Awaiting Parts by MICHAEL MCNAMARA
From: On Hold
To: Awaiting Parts
Duration in Previous: 2m
💵
Expenses Added Aug 4, 9:48 AM
Type: Expenses
Status: Open
Qty: 1
💵
Expenses Added Aug 4, 9:58 AM
Type: Expenses
Status: Open
Qty: 1
🗓️
2 Status: Scheduled Aug 4, 12:22 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-08-19T12:00:00.000+0000
⚠️ 6.0 business days
💵
2x Expenses Added Aug 11, 5:15 PM
Type: Expenses
Status: Open
Qty: 1
⚠️ 5.8 business days
🔄
Status: Reschedule by Kaitlyn Kelch Aug 18, 10:04 AM
From: Scheduled
To: Reschedule
Duration in Previous: 13d 21h
🗓️
2 Status: Scheduled Aug 18, 10:11 AM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-08-26T12:00:00.000+0000
3.0 business days
💵
Expenses Added Aug 20, 3:22 PM
Type: Expenses
Status: Open
Qty: 1
⚠️ 5.0 business days
🔧
Status: Tech On Site by Curtis Sprague Aug 26, 9:37 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 23h
💵
Expenses Added Aug 26, 2:23 PM
Type: Expenses
Status: Open
Qty: 1
🔩
Parts Added Aug 27, 9:09 AM
Type: Parts
Status: Open
Qty: 1
⏱️
2 3x Labor Added Aug 27, 10:12 AM
3x Labor Added → 4x Travel Added
🚗
4x Travel Added
Type: Travel, Expenses
Status: Open
Qty: 830, 1, 12
🗓️
2 Status: Scheduled Aug 27, 1:34 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Kaitlyn Kelch
Scheduled For: 2025-09-04T12:00:00.000+0000
⚠️ 6.0 business days
🔧
Status: Tech On Site by Craig Dempsey Sep 4, 9:17 AM
From: Scheduled
To: Tech On Site
Duration in Previous: 7d 19h
2.0 business days
✔️
Status: Completed by Craig Dempsey Sep 5, 11:55 AM
From: Tech On Site
To: Completed
Duration in Previous: 1d 2h
1.0 business days
⏱️
2 5x Labor Added Sep 7, 10:27 PM
5x Labor Added → Status: Closed
🏁
Status: Closed by Curtis Sprague
From: Completed
To: Closed
Duration in Previous: 2d 10h
⏸️
Status: On Hold by MICHAEL MCNAMARA Sep 8, 7:25 AM
From: Closed
To: On Hold
Duration in Previous: 8h 54m
✏️
Status: WO Correction Needed by Craig Dempsey Sep 8, 9:26 AM
From: On Hold
To: WO Correction Needed
Duration in Previous: 2h 1m
2.0 business days
🏁
Status: Closed by Curtis Sprague Sep 9, 11:07 AM
From: WO Correction Needed
To: Closed
Duration in Previous: 1d 1h
4.0 business days
📄
Status: Ready to Bill by MICHAEL MCNAMARA Sep 12, 7:49 AM
From: Closed
To: Ready to Bill
Duration in Previous: 2d 20h
2.0 business days
📨
Status: Invoice Pending by Hannah Shaw Sep 15, 12:57 PM
From: Ready to Bill
To: Invoice Pending
Duration in Previous: 3d 5h
💰
Status: Invoiced by Hannah Shaw Sep 15, 1:25 PM
From: Invoice Pending
To: Invoiced
Duration in Previous: 27m
🚨 14.0 business days
🧾
Invoice Created Oct 2, 7:45 AM
Invoice Number: SM-240958

Bottlenecks

Assigned
Duration: 10.2 business days (threshold: 4.0 business hours)
Exceeded by 9.7 business days
Assigned
Duration: 3.0 business days (threshold: 4.0 business hours)
Exceeded by 2.5 business days
Scheduled
Duration: 15.0 business days (threshold: 2.0 business days)
Exceeded by 13.0 business days
Scheduled
Duration: 11.0 business days (threshold: 2.0 business days)
Exceeded by 9.0 business days
Scheduled
Duration: 7.0 business days (threshold: 2.0 business days)
Exceeded by 5.0 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Scheduled
Duration: 5.8 business days (threshold: 2.0 business days)
Exceeded by 3.8 business days
Tech On Site
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Completed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.5 business hours
Closed
Duration: 4.0 business days (threshold: 1.0 business days)
Exceeded by 3.0 business days
Ready to Bill
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days

🔗 Related Artifacts

📞
Case 00502981
Closed

ℹ️ Work Order Details

Status
Invoiced
Priority
PSM
Type
Overhaul
Branch
ERLA - PROD
Technician
Curtis Sprague
Scheduled
N/A
Created
Jun 18, 8:28 AM
Invoice #
SM-240958

Work Details (39)

Name Type Status Qty Amount Date
WL-02834441 Parts Open 1 $0.00 Jun 18, 8:30 AM
WL-02834442 Parts Open 1 $0.00 Jun 18, 8:30 AM
WL-02834443 Parts Open 1 $0.00 Jun 18, 8:30 AM
WL-02834444 Parts Open 1 $0.00 Jun 18, 8:30 AM
WL-02834445 Parts Open 1 $0.00 Jun 18, 8:30 AM
WL-02864614 Expenses Open 1 $177.49 Jul 14, 11:47 AM
WL-02864615 Expenses Open 1 $143.82 Jul 14, 11:47 AM
WL-02864616 Expenses Open 1 $314.61 Jul 14, 11:47 AM
WL-02887194 Expenses Open 1 $541.80 Aug 1, 11:21 AM
WL-02887997 Labor Open 8 $0.00 Aug 1, 6:36 PM
WL-02887998 Labor Open 0.5 $0.00 Aug 1, 6:36 PM
WL-02887999 Labor Open 8 $541.00 Aug 1, 6:36 PM
WL-02888000 Travel Open 830 $800.00 Aug 1, 6:36 PM
WL-02888001 Travel Open 12 $150.00 Aug 1, 6:36 PM
WL-02889186 Expenses Open 1 $50.00 Aug 3, 6:37 PM
WL-02889187 Expenses Open 1 $25.00 Aug 3, 6:37 PM
WL-02889188 Expenses Open 1 $85.00 Aug 3, 6:37 PM
WL-02889189 Expenses Open 1 $10.89 Aug 3, 6:37 PM
WL-02889190 Labor Open 11 $0.00 Aug 3, 6:38 PM
WL-02889191 Expenses Open 1 $50.00 Aug 3, 6:40 PM
WL-02889482 Expenses Open 1 $50.00 Aug 4, 9:48 AM
WL-02889502 Expenses Open 1 $50.00 Aug 4, 9:58 AM
WL-02898219 Expenses Open 1 $5.00 Aug 11, 5:15 PM
WL-02898216 Expenses Open 1 $712.17 Aug 11, 5:15 PM
WL-02908488 Expenses Open 1 $164.84 Aug 20, 3:22 PM
WL-02915231 Expenses Open 1 $344.66 Aug 26, 2:23 PM
WL-02916388 Parts Open 1 $0.00 Aug 27, 9:09 AM
WL-02916493 Labor Open 0.5 $0.00 Aug 27, 10:12 AM
WL-02916492 Labor Open 11 $0.00 Aug 27, 10:12 AM
WL-02916494 Labor Open 7 $630.00 Aug 27, 10:12 AM
WL-02916497 Travel Open 830 $0.00 Aug 27, 10:14 AM
WL-02916495 Expenses Open 1 $50.00 Aug 27, 10:14 AM
WL-02916496 Expenses Open 1 $50.00 Aug 27, 10:14 AM
WL-02916498 Travel Open 12 $800.00 Aug 27, 10:14 AM
WL-02927858 Labor Open 5.5 $0.00 Sep 7, 10:27 PM
WL-02927859 Labor Open 0.5 $0.00 Sep 7, 10:27 PM
WL-02927860 Labor Open 4.5 $405.00 Sep 7, 10:27 PM
WL-02927861 Labor Open 10.5 $0.00 Sep 7, 10:27 PM
WL-02927862 Travel Open 4 $150.00 Sep 7, 10:27 PM

Details