28V
SYS-LC-1260-E
Contract ends 04/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB709033 1260 Quaternary Pump
G1316C
DEBAC07117 1290 Thermostatted Column Compartment
G1365C
DEAAY00759 1260 Multiple Wavelength Detector
G1329B
DEAAC22922 1260 Standard Autosampler
G4260B
DGB13460006 Agilent 1260 Infinity II ELSD
G1330BR
DE60562302 Certified Pre-owned Thermostat
Previously Unable to close the SO in Agilent CRM due to Agilent CRM application updating issues. Agilent tablet IOS update issues in progress and being addressed by Agilent.
9.23.25 Hshaw - moved WO to BR, waiting for mService to close. TBA $872.00
24 July 2025 Larry Alberty
Third attempt to schedule. Reached out to location with proposed onsite visit time frame.
22 July 2025 Larry Alberty
Second attempt. Reached out to location with proposed onsite visit time frame.
18 July 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 77 miles. Zone 2
🔧Work Performed
Completed LC PM
🔍Technician Findings
Completed LC PM
⚠️Problem Description
28V
SYS-LC-1260-E
Contract ends 04/30/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G1311B
DEAB709033 1260 Quaternary Pump
G1316C
DEBAC07117 1290 Thermostatted Column Compartment
G1365C
DEAAY00759 1260 Multiple Wavelength Detector
G1329B
DEAAC22922 1260 Standard Autosampler
G4260B
DGB13460006 Agilent 1260 Infinity II ELSD
G1330BR
DE60562302 Certified Pre-owned Thermostat
📄Description
1260 Quaternary Pump
📞Call Description
SEP 2025 LC PM
📞
Call
Completed Sep 24, 2025
24 SEP 2025 Larry Alberty
(Was able to close today in Agilent CRM)
Previously Unable to close the SO in Agilent CRM due to Agilent CRM application updating issues. Agilent tablet IOS update issues in progress and being addressed by Agilent.
📞
Call
Completed Jul 24, 2025
24 July 2025 Larry Alberty
Third attempt to schedule. Reached out to location with proposed onsite visit time frame.
📞
Call
Completed Jul 22, 2025
22 July 2025 Larry Alberty
Second attempt. Reached out to location with proposed onsite visit time frame.
📞
Call
Completed Jul 18, 2025
18 July 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.