Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met (8 biz days early)
🕐 Clock stopped: Tech Off Site (Oct 21, 2025)
▶ Clock Running
Status: Created
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
19d
▶ Clock Running
Status: Assigned
Jul 23 → Aug 19, 2025
19 business days (counted)
Running total: 19 of ? biz days used
38d
▶ Clock Running
Status: Scheduled
Aug 19 → Oct 14, 2025
38 business days (counted)
Running total: 57 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 14 → Oct 15, 2025
1 business day (counted)
Running total: 58 of ? biz days used
▶ Clock Running
Status: Scheduled
Oct 15 → Oct 20, 2025
3 business days (counted)
Running total: 61 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 20 → Oct 21, 2025
1 business day (counted)
Running total: 62 of ? biz days used
Created: Jul 23, 2025
Tech Off Site: Oct 21, 2025
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Jul 23 → Jul 23
Created
▶ Running
0
0
Jul 23 → Jul 23
Ready for Scheduling
▶ Running
0
0
Jul 23 → Aug 19
Assigned
▶ Running
19
19
Aug 19 → Oct 14
Scheduled
▶ Running
38
57
Oct 14 → Oct 15
Tech On Site
▶ Running
1
58
Oct 15 → Oct 20
Scheduled
▶ Running
3
61
Oct 20 → Oct 21
Tech On Site
▶ Running
1
62
Coordinators
62.5 days
Over SLA
Field Work
4.1 days
Over SLA
Billing
13.6 days
Over SLA
Created: Jul 23, 2025
Due: Oct 31, 2025
Completed: Oct 22, 2025 (9 days early)
⏱️
38.5d in Scheduled
Longest Stage
🔄
11 transitions
Status Changes
⚠️
71.7d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Hermilo Solano — scheduling delays attributed to technician, not coordinators
Visit 1
Oct 14, 2025
Visit 2
Oct 20, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00512828
6007894105
Closed
15L
SYS-LC-1200
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1329A
DE64763080 1200 Series Standard Autosampler
G1314B
DE71359717 1260 Variable Wavelength Detector VL
G1322A-B
JP62359991 1200 Vacuum Degasser
G1316A-B
DE63064138 1200 Thermostatted Column Compartment
G1312A
DE63058069 1200 Series Binary Pump
Contact
Roderick DelRosario
🚨
Primary Delay
38.5 days stuck in "Scheduled"
⏱️
Total Delay
71.7 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
20.0d
/ 0.5d SLA
Scheduled
42.5d
/ 2.0d SLA
Tech On Site
2.4d
/ 1.0d SLA
Tech Off Site
0.4d
/ 2.0d SLA
Completed
1.3d
/ 1.0d SLA
Ready to Bill
13.6d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
10-20-HSolano- "Travel from Site" is in WO-01293398.
10-14-HSolano-I arrived on site, and the instrument was not ready for service, it was in use and relocated to a different laboratory.
Please assign to Hermilo Solano
ARP to site is 46 miles. Zone 1
🔧
Work Performed
Performed annual Preventative Maintenance. All required PM parts were replaced. All recommended PM tests passed.
🔍
Technician Findings
N/A
⚠️
Problem Description
15L
SYS-LC-1200
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1329A
DE64763080 1200 Series Standard Autosampler
G1314B
DE71359717 1260 Variable Wavelength Detector VL
G1322A-B
JP62359991 1200 Vacuum Degasser
G1316A-B
DE63064138 1200 Thermostatted Column Compartment
G1312A
DE63058069 1200 Series Binary Pump
📄
Description
LC 1200 System
📞
Call Description
OCT 2025 LC PMPLUS
📅
WO-01293396 - Preventive Maintenance - SYS-LC-1200 - Torrance - Bachem Inc
Oct 20, 2025 11:00am – 2:30am
Work Order: WO-01293396
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007894105
Location: Bachem Inc
Address: 3132 Kashiwa St, Torrance, CA 90505
Manufacturer:
Model #: SYS-LC-1200
Serial #: S-BACH-LC-68192555947
Contact Name: Roderick DelRosario
Contact Phone: 310 784 3317
Contact Ema
Timeline
📞
📋
Work Order:
WO-01293396
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Hermilo Solano
🗓️
📅
Scheduled For:
2025-10-14T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
56d 1h
🗓️
📅
Scheduled For:
2025-10-20T15:00:00.000+0000
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1.25, 46
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
5d 15h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1.5, 4.75, 46
🔩
Type:
Parts
Status:
Open
Qty:
1, 2
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
22h 45m
✔️
From:
Tech Off Site
To:
Completed
Duration in Previous:
3h 26m
🏁
From:
Completed
To:
Closed
Duration in Previous:
10h 21m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
13h 18m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
🧾
Invoice Number:
SM-246148
Bottlenecks
Assigned
Duration: 20.0 business days (threshold: 4.0 business hours)
Exceeded by 19.5 business days
Scheduled
Duration: 38.5 business days (threshold: 2.0 business days)
Exceeded by 36.5 business days
Scheduled
Duration: 4.0 business days (threshold: 2.0 business days)
Exceeded by 2.0 business days
Tech On Site
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.6 business hours
Completed
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.4 business hours
Ready to Bill
Duration: 13.6 business days (threshold: 1.0 business days)
Exceeded by 12.6 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Hermilo Solano
Scheduled
Oct 20, 11:00 AM
Work Details (13)
Name
Type
Status
Qty
Amount
Date
WL-02970945
Labor
Open
1.25
$0.00
Oct 14, 9:42 PM
WL-02970946
Labor
Open
2
$0.00
Oct 14, 9:42 PM
WL-02970947
Travel
Open
46
$180.00
Oct 14, 9:42 PM
WL-02970948
Travel
Open
46
$0.00
Oct 14, 9:42 PM
WL-02977677
Labor
Open
1.5
$0.00
Oct 20, 8:08 PM
WL-02977678
Labor
Open
4.75
$456.00
Oct 20, 8:08 PM
WL-02977679
Travel
Open
46
$180.00
Oct 20, 8:08 PM
WL-02977690
Parts
Open
1
$0.00
Oct 20, 8:13 PM
WL-02977691
Parts
Open
1
$0.00
Oct 20, 8:13 PM
WL-02977692
Parts
Open
2
$0.00
Oct 20, 8:13 PM
WL-02977693
Parts
Open
1
$0.00
Oct 20, 8:13 PM
WL-02977694
Parts
Open
1
$0.00
Oct 20, 8:13 PM
WL-02977695
Parts
Open
1
$0.00
Oct 20, 8:13 PM