Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met
🕐 Clock stopped: Completed (Sep 30, 2025)
▶ Clock Running
Status: Created
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
14d
▶ Clock Running
Status: Assigned
Jul 23 → Aug 12, 2025
14 business days (counted)
Running total: 14 of ? biz days used
33d
▶ Clock Running
Status: Scheduled
Aug 12 → Sep 29, 2025
33 business days (counted)
Running total: 47 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 29 → Sep 29, 2025
0 business days (counted)
Running total: 47 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 29 → Sep 30, 2025
1 business day (counted)
Running total: 48 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 30 → Sep 30, 2025
0 business days (counted)
Running total: 48 of ? biz days used
Created: Jul 23, 2025
Completed: Sep 30, 2025
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Jul 23 → Jul 23
Created
▶ Running
0
0
Jul 23 → Jul 23
Ready for Scheduling
▶ Running
0
0
Jul 23 → Aug 12
Assigned
▶ Running
14
14
Aug 12 → Sep 29
Scheduled
▶ Running
33
47
Sep 29 → Sep 29
Tech On Site
▶ Running
0
47
Sep 29 → Sep 30
Tech Off Site
▶ Running
1
48
Sep 30 → Sep 30
Tech On Site
▶ Running
0
48
Coordinators
48.8 days
Over SLA
Field Work
3.1 days
Over SLA
Billing
4.8 days
Over SLA
Created: Jul 23, 2025
Due: Sep 30, 2025
Completed: Oct 1, 2025 (on time)
⏱️
33.8d in Scheduled
Longest Stage
🔄
10 transitions
Status Changes
⚠️
49.0d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Hermilo Solano — scheduling delays attributed to technician, not coordinators
Visit 1
Sep 29, 2025
Visit 2
Sep 30, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00512888
6007894082
Closed
15L
SYS-LC-1200
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1314B
DE60556004 1260 Variable Wavelength Detector VL
G1312A
DE60555717 1200 Series Binary Pump
G1316A-B
DE60556821 1200 Thermostatted Column Compartment
G1322A
JP62353704 1260 Standard Degasser
G1329A
DE60556202 1200 Series Standard Autosampler
Contact
Roderick DelRosario
🚨
Primary Delay
33.8 days stuck in "Scheduled"
⏱️
Total Delay
49.0 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
15.0d
/ 0.5d SLA
Scheduled
33.8d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Tech Off Site
1.0d
/ 2.0d SLA
Completed
1.1d
/ 1.0d SLA
Ready to Bill
3.5d
/ 1.0d SLA
Invoice Pending
1.2d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
09-29-Hsolano- "Travel to Site" is in WO-01293435.
Please assign to Hermilo Solano
ARP to site is 46 miles. Zone 1
🔧
Work Performed
Performed annual PMOQ per BACHEM custom EQP. All required PMOQ tests passed. Agilent's file CD was given to customer.
🔍
Technician Findings
N/A
⚠️
Problem Description
15L
SYS-LC-1200
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1314B
DE60556004 1260 Variable Wavelength Detector VL
G1312A
DE60555717 1200 Series Binary Pump
G1316A-B
DE60556821 1200 Thermostatted Column Compartment
G1322A
JP62353704 1260 Standard Degasser
G1329A
DE60556202 1200 Series Standard Autosampler
📄
Description
LC 1200 System
📞
Call Description
SEP 2025 LC EOQ
📅
WO-01293438 - EOQ - SYS-LC-1200 - Torrance - Bachem Inc
Sep 29, 2025 11:00am – 1:30am
Work Order: WO-01293438
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007894082
Location: Bachem Inc
Address: 3132 Kashiwa St, Torrance, CA 90505
Manufacturer:
Model #: SYS-LC-1200
Serial #: S-BACH-LC-39618129325
Contact Name: Roderick DelRosario
Contact Phone: 310 784 3317
Contact Ema
Timeline
📞
📋
Work Order:
WO-01293438
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
a0hVU000000HkpeYAC, Hermilo Solano
🗓️
📅
Scheduled For:
2025-09-29T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
48d 3h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
3h 36m
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1.5, 1.6666666666667, 46
🔧
From:
Tech Off Site
To:
Tech On Site
Duration in Previous:
17h 18m
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
2, 4.75, 46
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
4h 32m
🏁
From:
Completed
To:
Closed
Duration in Previous:
8h 30m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
13h 24m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
5d 2h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
19h 47m
🧾
Invoice Number:
SM-243053
Bottlenecks
Assigned
Duration: 15.0 business days (threshold: 4.0 business hours)
Exceeded by 14.5 business days
Scheduled
Duration: 33.8 business days (threshold: 2.0 business days)
Exceeded by 31.8 business days
Completed
Duration: 1.1 business days (threshold: 1.0 business days)
Exceeded by 0.5 business hours
Ready to Bill
Duration: 3.5 business days (threshold: 1.0 business days)
Exceeded by 2.5 business days
ℹ️ Work Order Details
Technician
Hermilo Solano
Scheduled
Sep 29, 11:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-02954217
Labor
Open
1.5
$0.00
Sep 30, 10:50 AM
WL-02954218
Labor
Open
1.6666666666667
$0.00
Sep 30, 10:50 AM
WL-02954219
Travel
Open
46
$0.00
Sep 30, 10:50 AM
WL-02954871
Labor
Open
2
$0.00
Sep 30, 5:30 PM
WL-02954872
Labor
Open
4.75
$798.00
Sep 30, 5:30 PM
WL-02954873
Labor
Open
2
$0.00
Sep 30, 5:30 PM
WL-02954874
Travel
Open
46
$180.00
Sep 30, 5:30 PM
WL-02954875
Travel
Open
46
$0.00
Sep 30, 5:30 PM