Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (2 biz days early)
🕐 Clock stopped: Completed (Sep 26, 2025)
▶ Clock Running
Status: Created
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jul 23 → Jul 23, 2025
0 business days (counted)
Running total: 0 of ? biz days used
14d
▶ Clock Running
Status: Assigned
Jul 23 → Aug 12, 2025
14 business days (counted)
Running total: 14 of ? biz days used
31d
▶ Clock Running
Status: Scheduled
Aug 12 → Sep 25, 2025
31 business days (counted)
Running total: 45 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 25 → Sep 26, 2025
1 business day (counted)
Running total: 46 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Sep 26 → Sep 26, 2025
0 business days (counted)
Running total: 46 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 26 → Sep 26, 2025
0 business days (counted)
Running total: 46 of ? biz days used
Created: Jul 23, 2025
Completed: Sep 26, 2025
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Jul 23 → Jul 23
Created
▶ Running
0
0
Jul 23 → Jul 23
Ready for Scheduling
▶ Running
0
0
Jul 23 → Aug 12
Assigned
▶ Running
14
14
Aug 12 → Sep 25
Scheduled
▶ Running
31
45
Sep 25 → Sep 26
Tech On Site
▶ Running
1
46
Sep 26 → Sep 26
Tech Off Site
▶ Running
0
46
Sep 26 → Sep 26
Tech On Site
▶ Running
0
46
Coordinators
46.8 days
Over SLA
Billing
6.7 days
Over SLA
Created: Jul 23, 2025
Due: Sep 30, 2025
Completed: Sep 26, 2025 (4 days early)
⏱️
31.8d in Scheduled
Longest Stage
🔄
10 transitions
Status Changes
⚠️
48.8d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🔄
2 On-Site Visits
2 on-site visits — follow-up trip required
👤 Self-scheduled by Hermilo Solano — scheduling delays attributed to technician, not coordinators
Visit 1
Sep 25, 2025
Visit 2
Sep 26, 2025
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00512897
6007894298
Closed
15L
SYS-LC-1260
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1329B
DEAAC43791 1260 Standard Autosampler
G1314F
DEABB20308 1260 Variable Wavelength Detector
G1316A
DEACN47480 1260 Thermostatted Column Compartment
G1311B
DEAE415614 1260 Quaternary Pump
Contact
Roderick DelRosario
🚨
Primary Delay
31.8 days stuck in "Scheduled"
⏱️
Total Delay
48.8 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
15.0d
/ 0.5d SLA
Scheduled
31.8d
/ 2.0d SLA
Tech On Site
1.1d
/ 1.0d SLA
Tech Off Site
1.0d
/ 2.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
5.4d
/ 1.0d SLA
Invoice Pending
1.2d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
09-25-HSolano-Travel "To Site" is in WO-01293448, which is the PM service of this instrument.
Please assign to Hermilo Solano
ARP to site is 46 miles. Zone 1
🔧
Work Performed
Performed annual PM/OQ service per BACHEM custom EQP 02.64. All required PMOQ tests passed.
🔍
Technician Findings
N/A
⚠️
Problem Description
15L
SYS-LC-1260
Contract ends 06/30/2026 repair included
PMPLUS / EOQ
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1329B
DEAAC43791 1260 Standard Autosampler
G1314F
DEABB20308 1260 Variable Wavelength Detector
G1316A
DEACN47480 1260 Thermostatted Column Compartment
G1311B
DEAE415614 1260 Quaternary Pump
📄
Description
1260 Quaternary Pump
📞
Call Description
SEP 2025 LC EOQ
📅
WO-01293449 - EOQ - G1311B - Torrance - Bachem Inc
Sep 25, 2025 11:00am – 1:30am
Work Order: WO-01293449
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007894298
Location: Bachem Inc
Address: 3132 Kashiwa St, Torrance, CA 90505
Manufacturer: Agilent Technologies
Model #: G1311B
Serial #: DEAE415614
Contact Name: Roderick DelRosario
Contact Phone: 310 784 3317
Contact
Timeline
📞
📋
Work Order:
WO-01293449
Type:
EOQ
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Hermilo Solano
🗓️
📅
Scheduled For:
2025-09-25T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
44d 3h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
5h 26m
🔧
From:
Tech Off Site
To:
Tech On Site
Duration in Previous:
17h 32m
⏱️
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
3h 41m
🏁
From:
Completed
To:
Closed
Duration in Previous:
5m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 20h
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
7d 1h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
19h 47m
🧾
Invoice Number:
SM-243053
Bottlenecks
Assigned
Duration: 15.0 business days (threshold: 4.0 business hours)
Exceeded by 14.5 business days
Scheduled
Duration: 31.8 business days (threshold: 2.0 business days)
Exceeded by 29.8 business days
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.2 business hours
Ready to Bill
Duration: 5.4 business days (threshold: 1.0 business days)
Exceeded by 4.4 business days
ℹ️ Work Order Details
Technician
Hermilo Solano
Scheduled
Sep 25, 11:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-02951469
Labor
Open
4
$0.00
Sep 26, 7:38 PM
WL-02951470
Labor
Open
1.5
$0.00
Sep 26, 7:38 PM
WL-02951471
Labor
Open
1.4166666666667
$0.00
Sep 26, 7:38 PM
WL-02951472
Labor
Open
4.75
$798.00
Sep 26, 7:38 PM
WL-02951473
Labor
Open
2
$0.00
Sep 26, 7:38 PM
WL-02951474
Travel
Open
46
$0.00
Sep 26, 7:38 PM
WL-02951475
Travel
Open
46
$180.00
Sep 26, 7:38 PM
WL-02951476
Travel
Open
46
$0.00
Sep 26, 7:38 PM