Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (3 biz days early)
🕐 Clock stopped: Completed (Sep 25, 2025)
▶ Clock Running
Status: Created
Aug 6 → Aug 6, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 6 → Aug 6, 2025
0 business days (counted)
Running total: 0 of ? biz days used
3d
▶ Clock Running
Status: Assigned
Aug 6 → Aug 11, 2025
3 business days (counted)
Running total: 3 of ? biz days used
32d
▶ Clock Running
Status: Scheduled
Aug 11 → Sep 25, 2025
32 business days (counted)
Running total: 35 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 25 → Sep 25, 2025
0 business days (counted)
Running total: 35 of ? biz days used
Created: Aug 6, 2025
Completed: Sep 25, 2025
Show SLA Clock Detail (5 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Aug 6 → Aug 6 |
Created |
▶ Running
|
0 |
0 |
| Aug 6 → Aug 6 |
Ready for Scheduling |
▶ Running
|
0 |
0 |
| Aug 6 → Aug 11 |
Assigned |
▶ Running
|
3 |
3 |
| Aug 11 → Sep 25 |
Scheduled |
▶ Running
|
32 |
35 |
| Sep 25 → Sep 25 |
Tech On Site |
▶ Running
|
0 |
35 |
Coordinators
36.4 days
Over SLA
Billing
7.6 days
Over SLA
Created: Aug 6, 2025
Due: Sep 30, 2025
Completed: Sep 25, 2025 (5 days early)
⏱️
32.4d in Scheduled
Longest Stage
🔄
9 transitions
Status Changes
⚠️
39.5d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00516702
6007858198
Closed
28R
SYS-LC-129B2-E
Contract ends 06/27/2026 repair included
PM
PM only - customer supplies the UV lamp
G7137A
DEBBR00806 1290 Infinity II Bio Multisampler
G4761A
DEBDS10245 Upgrade InfinityLab Sample Thermostat
G7116B
DEBA413515 1290 Infinity II Multicolumn Thermostat
G7131A
DEBB400282 1290 Infinity II Bio Flexible Pump
G5641A
000000000033063301 Quick Change 2-Pos/10-Prt Bio Valve
G7115A
DEAC626305 1260 Infinity II Diode Array Detector WR
🚨
Primary Delay
32.4 days stuck in "Scheduled"
⏱️
Total Delay
39.5 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
32.4d
/ 2.0d SLA
Tech On Site
0.7d
/ 1.0d SLA
WO Correction Needed
0.3d
Ready to Bill
6.0d
/ 1.0d SLA
Invoice Pending
1.2d
/ 2.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
9.26.25 Hshaw - missing mileage both ways
11 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame proposal.
Please assign to Larry Alberty ARP to site is 30 miles. Zone 1
🔧
Work Performed
Completed LC PM.
🔍
Technician Findings
added mileage
⚠️
Problem Description
28R
SYS-LC-129B2-E
Contract ends 06/27/2026 repair included
PM
PM only - customer supplies the UV lamp
G7137A
DEBBR00806 1290 Infinity II Bio Multisampler
G4761A
DEBDS10245 Upgrade InfinityLab Sample Thermostat
G7116B
DEBA413515 1290 Infinity II Multicolumn Thermostat
G7131A
DEBB400282 1290 Infinity II Bio Flexible Pump
G5641A
000000000033063301 Quick Change 2-Pos/10-Prt Bio Valve
G7115A
DEAC626305 1260 Infinity II Diode Array Detector WR
📄
Description
Agilent - G7131A - 1290 Infinity II Bio Flexible Pump
📞
Call Description
SEP 2025 LC PM
📞
Call
Completed
Aug 11, 2025
11 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame proposal.
📅
WO-01296017 - Preventive Maintenance - G7131A - ALAMEDA - Scribe Therapeutics Inc
Sep 25, 2025 9:00am – 4:00pm
Work Order: WO-01296017
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007858198
Location: Scribe Therapeutics Inc
Address: 1100 Marina Village Pkwy, ALAMEDA, CA 94501
Manufacturer: Agilent
Model #: G7131A
Serial #: DEBB400282
Contact Name: Larry Dobson
Contact Phone:
Contact Email: ldo
Timeline
📞
📋
Work Order:
WO-01296017
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
a0hF0000001pE6KIAU, Larry Alberty
🗓️
📅
Scheduled For:
2025-09-25T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
44d 17h
🔩
⏱️
Type:
Labor
Status:
Open
Qty:
1, 4
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
5h 21m, 0m
✏️
From:
Closed
To:
WO Correction Needed
Duration in Previous:
1d 1h
🚗
🏁
From:
WO Correction Needed
To:
Closed
Duration in Previous:
2h 43m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
2d 13h
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
7d 8h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
19h 47m
🧾
Invoice Number:
SM-243053
Bottlenecks
Assigned
Duration: 4.0 business days (threshold: 4.0 business hours)
Exceeded by 3.5 business days
Scheduled
Duration: 32.4 business days (threshold: 2.0 business days)
Exceeded by 30.4 business days
Closed
Duration: 1.5 business days (threshold: 1.0 business days)
Exceeded by 4.2 business hours
Closed
Duration: 1.0 business days (threshold: 1.0 business days)
Exceeded by 0.4 business hours
Ready to Bill
Duration: 6.0 business days (threshold: 1.0 business days)
Exceeded by 5.0 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Sep 25, 9:00 AM
Work Details (7)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-02949397 |
Parts |
Open |
1 |
$0.00 |
Sep 25, 3:47 PM |
| WL-02949398 |
Parts |
Open |
1 |
$0.00 |
Sep 25, 3:47 PM |
| WL-02949402 |
Labor |
Open |
1 |
$0.00 |
Sep 25, 3:49 PM |
| WL-02949403 |
Labor |
Open |
4 |
$513.00 |
Sep 25, 3:49 PM |
| WL-02949404 |
Labor |
Open |
1 |
$0.00 |
Sep 25, 3:49 PM |
| WL-02951459 |
Travel |
Open |
30 |
$180.00 |
Sep 26, 7:34 PM |
| WL-02951460 |
Travel |
Open |
30 |
$0.00 |
Sep 26, 7:34 PM |