Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met (3 biz days early)
🕐 Clock stopped: Tech Off Site (Oct 28, 2025)
▶ Clock Running
Status: Created
Aug 6 → Aug 6, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 6 → Aug 6, 2025
0 business days (counted)
Running total: 0 of ? biz days used
41d
▶ Clock Running
Status: Assigned
Aug 6 → Oct 3, 2025
41 business days (counted)
Running total: 41 of ? biz days used
15d
▶ Clock Running
Status: Scheduled
Oct 3 → Oct 27, 2025
15 business days (counted)
Running total: 56 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 27 → Oct 28, 2025
1 business day (counted)
Running total: 57 of ? biz days used
Created: Aug 6, 2025
Tech Off Site: Oct 28, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 6 → Aug 6
Created
▶ Running
0
0
Aug 6 → Aug 6
Ready for Scheduling
▶ Running
0
0
Aug 6 → Oct 3
Assigned
▶ Running
41
41
Oct 3 → Oct 27
Scheduled
▶ Running
15
56
Oct 27 → Oct 28
Tech On Site
▶ Running
1
57
Coordinators
57.3 days
Over SLA
Field Work
4.1 days
Over SLA
Billing
6.4 days
Over SLA
Created: Aug 6, 2025
Due: Oct 31, 2025
Completed: Oct 30, 2025 (1 days early)
⏱️
41.3d in Assigned
Longest Stage
🔄
9 transitions
Status Changes
⚠️
62.2d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00516720
6007870125
Closed
28R
SYS-LC-1260
Contract ends 12/31/2025 repair included
PM
PM only - customer supplies the UV lamp
G1311C
DEAB804030 1260 Quaternary Pump VL
G1316A
DEACN09599 1260 Thermostatted Column Compartment
G1314B
DEAAU02114 1260 Variable Wavelength Detector VL
G1367E
DEACO01781 1260 High Performance Autosampler
35900E
1279101109019 Dual-channel A/D interface box
🚨
Primary Delay
41.3 days stuck in "Assigned"
⏱️
Total Delay
62.2 business days over SLA thresholds
SLA vs Actual Time by Status
Assigned
41.3d
/ 0.5d SLA
Scheduled
16.0d
/ 2.0d SLA
Tech On Site
1.9d
/ 1.0d SLA
Tech Off Site
2.2d
/ 2.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
6.4d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📅 Events (1)
🔒
Internal CSA Notes
10/27 Google map was used to calculate zone. MD
Please assign to Maria Davis ARP to site is 53 miles. Zone 2
🔧
Work Performed
10/27/2025 LC PM was completed per Agilent. Ezchrom is customer's data acquisition. Lab advisor was use to run test, all tests passed. System was flushed with water, column installed and stabilized for some time. Pressure was as expected. Customer will run PQ
⚠️
Problem Description
28R
SYS-LC-1260
Contract ends 12/31/2025 repair included
PM
PM only - customer supplies the UV lamp
G1311C
DEAB804030 1260 Quaternary Pump VL
G1316A
DEACN09599 1260 Thermostatted Column Compartment
G1314B
DEAAU02114 1260 Variable Wavelength Detector VL
G1367E
DEACO01781 1260 High Performance Autosampler
35900E
1279101109019 Dual-channel A/D interface box
📄
Description
LC 1260 System
📞
Call Description
OCT 2025 LC PM
📅
WO-01296043 - Preventive Maintenance - SYS-LC-1260 - Dallas - PETNET Solutions
Oct 27, 2025 11:00am – 4:00pm
Work Order: WO-01296043
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007870125
Location: PETNET Solutions
Address: 1350 Manufacturing St Ste 1, Dallas, TX 75207
Manufacturer:
Model #: SYS-LC-1260
Serial #: S-PETN-LC-281143-45077
Contact Name: Pinkey Rahman
Contact Phone: 214-741-2075
Timeline
📞
📋
Work Order:
WO-01296043
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
🗓️
📅
Scheduled For:
2025-10-13T15:00:00.000+0000
📅
Scheduled For:
2025-10-27T15:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
24d 14h
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
1d 0h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
2, 4, 53, 51
🔩
✔️
From:
Tech Off Site
To:
Completed
Duration in Previous:
1d 9h
🏁
From:
Completed
To:
Closed
Duration in Previous:
2m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1d 18h
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
🧾
Invoice Number:
SM-246148
Bottlenecks
Assigned
Duration: 41.3 business days (threshold: 4.0 business hours)
Exceeded by 40.8 business days
Scheduled
Duration: 16.0 business days (threshold: 2.0 business days)
Exceeded by 14.0 business days
Tech On Site
Duration: 1.9 business days (threshold: 1.0 business days)
Exceeded by 7.3 business hours
Tech Off Site
Duration: 2.2 business days (threshold: 2.0 business days)
Exceeded by 1.7 business hours
Closed
Duration: 2.0 business days (threshold: 1.0 business days)
Exceeded by 1.0 business days
Ready to Bill
Duration: 6.4 business days (threshold: 1.0 business days)
Exceeded by 5.4 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Oct 27, 11:00 AM
Work Details (7)
Name
Type
Status
Qty
Amount
Date
WL-02989201
Labor
Open
2
$0.00
Oct 29, 10:18 PM
WL-02989202
Labor
Open
4
$456.00
Oct 29, 10:18 PM
WL-02989203
Labor
Open
2
$0.00
Oct 29, 10:18 PM
WL-02989204
Travel
Open
53
$359.00
Oct 29, 10:18 PM
WL-02989205
Travel
Open
51
$0.00
Oct 29, 10:18 PM
WL-02989253
Parts
Open
1
$0.00
Oct 29, 10:36 PM
WL-02989254
Parts
Open
1
$0.00
Oct 29, 10:36 PM