10/03 2nd call of today. Travel, mileage and zone are on WO-01296567. MD
Please assign to Maria Davis ARP to site is 64 miles. Zone 2
🔧Work Performed
10/03/2025 Data Acquisition is Chromeleon. LC (binary pump) PM was completed per Agilent. Work laptop and LAN card were used to connect; LAB Advisor was used to run tests. Systems was flushed thoroughly with IPA to prime the seals and with H2O for tests. Elasticity Calibration (90 min) was performed . All but Intensity passed. New lamp was installed and stabilized for some time. VWD tests passed. After customer was able to communicate with LC in Chromeleon.
⚠️Problem Description
28R
SYS-LC-1260
Contract ends 01/31/2026 repair included
PM
PM only - customer supplies the UV lamp
G1316A-B
DE63070422 1200 Thermostatted Column Compartment
1315D-B
DE64258558 1200 Series Diode Array Detector
G1379B
JP82008304 1260 Infinity Micro Degasser
G1329A
DE64768362 1200 Series Standard Autosampler
G1312B
DE63059913 1260 Binary Pump
📄Description
LC 1260 System
📞Call Description
OCT 2025 LC PM
📅
WO-01296526 - Preventive Maintenance - SYS-LC-1260 - Lewisville - Mary Kay Cosmetics Inc
Oct 3, 2025 10:00am – 4:00pm
Work Order: WO-01296526
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007940299
Location: Mary Kay Cosmetics Inc
Address: 2613 Denton Tap Rd, Lewisville, TX 75067
Manufacturer:
Model #: SYS-LC-1260
Serial #: S-MARY-LC-28720610889
Contact Name: Yuan Tang
Contact Phone: (972) 551-9726
Co
Timeline
📞
▶
4
Case Linked Aug 7, 11:24 AM
Case Linked → Work Order Created → Status: Ready for Scheduling → Technician Assigned
📋
Work Order Created
Work Order:WO-01296526
Type:Preventive Maintenance
Priority:PC
📅
Status: Ready for Scheduling by Leona Coonrod
From:Entered, Ready for Scheduling, L2 Screening
To:Ready for Scheduling, L2 Screening, Entered, Assigned