Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Sep 30, 2025
✓ SLA Met (2 biz days early)
🕐 Clock stopped: Completed (Sep 26, 2025)
▶ Clock Running
Status: Created
Aug 8 → Aug 8, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 8 → Aug 8, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 8 → Aug 11, 2025
1 business day (counted)
Running total: 1 of ? biz days used
33d
▶ Clock Running
Status: Scheduled
Aug 11 → Sep 26, 2025
33 business days (counted)
Running total: 34 of ? biz days used
▶ Clock Running
Status: Tech On Site
Sep 26 → Sep 26, 2025
0 business days (counted)
Running total: 34 of ? biz days used
Created: Aug 8, 2025
Completed: Sep 26, 2025
Show SLA Clock Detail (5 periods)
| Period |
Status |
Clock |
Biz Days |
Running Total |
| Aug 8 → Aug 8 |
Created |
▶ Running
|
0 |
0 |
| Aug 8 → Aug 8 |
Ready for Scheduling |
▶ Running
|
0 |
0 |
| Aug 8 → Aug 11 |
Assigned |
▶ Running
|
1 |
1 |
| Aug 11 → Sep 26 |
Scheduled |
▶ Running
|
33 |
34 |
| Sep 26 → Sep 26 |
Tech On Site |
▶ Running
|
0 |
34 |
Coordinators
35.4 days
Over SLA
Billing
7.6 days
Over SLA
Created: Aug 8, 2025
Due: Sep 30, 2025
Completed: Sep 26, 2025 (4 days early)
⏱️
33.4d in Scheduled
Longest Stage
🔄
9 transitions
Status Changes
⚠️
38.3d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00517376
6007858199
Closed
28R
SYS-LC-129B2
Contract ends 06/27/2026 repair included
PM
PM only - customer supplies the UV lamp
G7131A
DEBB400289 1290 Infinity II Bio Flexible Pump
G4761A
DEBDS10274 Upgrade InfinityLab Sample Thermostat
G7115A
DEAC626334 1260 Infinity II Diode Array Detector WR
G7137A
DEBBR00810 1290 Infinity II Bio Multisampler
G7116B
DEBA413516 1290 Infinity II Multicolumn Thermostat
G5641A
000000000033062849 Quick Change 2-Pos/10-Prt Bio Valve
🚨
Primary Delay
33.4 days stuck in "Scheduled"
⏱️
Total Delay
38.3 business days over SLA thresholds
SLA vs Actual Time by Status
Ready for Scheduling
0.0d
/ 1.0d SLA
Scheduled
33.4d
/ 2.0d SLA
Tech On Site
0.6d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
6.4d
/ 1.0d SLA
Invoice Pending
1.2d
/ 2.0d SLA
💬 Activities, Notes & Communications
🔒
Internal CSA Notes
11 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame proposal.
Please assign to Larry Alberty ARP to site is 29 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28R
SYS-LC-129B2
Contract ends 06/27/2026 repair included
PM
PM only - customer supplies the UV lamp
G7131A
DEBB400289 1290 Infinity II Bio Flexible Pump
G4761A
DEBDS10274 Upgrade InfinityLab Sample Thermostat
G7115A
DEAC626334 1260 Infinity II Diode Array Detector WR
G7137A
DEBBR00810 1290 Infinity II Bio Multisampler
G7116B
DEBA413516 1290 Infinity II Multicolumn Thermostat
G5641A
000000000033062849 Quick Change 2-Pos/10-Prt Bio Valve
📄
Description
Agilent - G7131A - 1290 Infinity II Bio Flexible Pump
📞
Call Description
SEP 2025 LC PM
📞
Call
Completed
Aug 11, 2025
11 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame proposal.
📅
WO-01296655 - Preventive Maintenance - G7131A - ALAMEDA - Scribe Therapeutics Inc
Sep 26, 2025 9:00am – 4:00pm
Work Order: WO-01296655
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007858199
Location: Scribe Therapeutics Inc
Address: 1100 Marina Village Pkwy, ALAMEDA, CA 94501
Manufacturer: Agilent
Model #: G7131A
Serial #: DEBB400289
Contact Name: Janelle Magaling
Contact Phone: 908-642-7374
Co
Timeline
📞
📋
Work Order:
WO-01296655
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered
To:
Ready for Scheduling
Duration in Previous:
0m
👷
Technician:
Larry Alberty
👷
From:
Ready for Scheduling
To:
Assigned
Duration in Previous:
1m
🗓️
📅
Scheduled For:
2025-09-26T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
45d 17h
🔩
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
4h 43m
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1, 3, 30
🏁
From:
Completed
To:
Closed
Duration in Previous:
4m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1h 22m
📨
From:
Ready to Bill
To:
Invoice Pending
Duration in Previous:
10d 1h
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
19h 47m
🧾
Invoice Number:
SM-243053
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 33.4 business days (threshold: 2.0 business days)
Exceeded by 31.4 business days
Ready to Bill
Duration: 6.4 business days (threshold: 1.0 business days)
Exceeded by 5.4 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Sep 26, 9:00 AM
Work Details (7)
| Name |
Type |
Status |
Qty |
Amount |
Date |
| WL-02951092 |
Parts |
Open |
1 |
$0.00 |
Sep 26, 3:28 PM |
| WL-02951093 |
Parts |
Open |
1 |
$0.00 |
Sep 26, 3:28 PM |
| WL-02951095 |
Labor |
Open |
1 |
$0.00 |
Sep 26, 3:32 PM |
| WL-02951096 |
Labor |
Open |
3 |
$456.00 |
Sep 26, 3:32 PM |
| WL-02951097 |
Labor |
Open |
1 |
$0.00 |
Sep 26, 3:32 PM |
| WL-02951098 |
Travel |
Open |
30 |
$180.00 |
Sep 26, 3:32 PM |
| WL-02951099 |
Travel |
Open |
30 |
$0.00 |
Sep 26, 3:32 PM |