Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Oct 31, 2025
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Completed (Oct 10, 2025)
▶ Clock Running
Status: Created
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Aug 18 → Aug 18, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Aug 18 → Aug 20, 2025
2 business days (counted)
Running total: 2 of ? biz days used
36d
▶ Clock Running
Status: Scheduled
Aug 20 → Oct 10, 2025
36 business days (counted)
Running total: 38 of ? biz days used
▶ Clock Running
Status: Tech On Site
Oct 10 → Oct 10, 2025
0 business days (counted)
Running total: 38 of ? biz days used
Created: Aug 18, 2025
Completed: Oct 10, 2025
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Aug 18 → Aug 18
Created
▶ Running
0
0
Aug 18 → Aug 18
Ready for Scheduling
▶ Running
0
0
Aug 18 → Aug 20
Assigned
▶ Running
2
2
Aug 20 → Oct 10
Scheduled
▶ Running
36
38
Oct 10 → Oct 10
Tech On Site
▶ Running
0
38
Coordinators
39.8 days
Over SLA
Billing
7.3 days
Over SLA
Created: Aug 18, 2025
Due: Oct 31, 2025
Completed: Oct 10, 2025 (21 days early)
⏱️
36.8d in Scheduled
Longest Stage
🔄
8 transitions
Status Changes
⚠️
43.6d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00519805
6007873853
Closed
28R
SYS-LC-1290II
Contract ends 06/25/2026 repair included
PM
G7167B
DEBAQ05210 1290 Infinity II Multisampler
G7104A
DEBAX03756 1290 Infinity II Flexible Pump.
G7117A
DEBAV03550 1290 Infinity II Diode Array Detector FS
G7116B
DEBA407649 1290 Infinity II Multicolumn Thermostat
G4761A
DEBBP30456 Upgrade InfinityLab Sample Thermostat
🚨
Primary Delay
36.8 days stuck in "Scheduled"
⏱️
Total Delay
43.6 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
36.8d
/ 2.0d SLA
Tech On Site
0.0d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
Ready to Bill
7.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (3)
📅 Events (1)
🔒
Internal CSA Notes
10 OCT 2025 Larry Alberty
TECH ONSITE ENTRY UPON ARRIVAL TO LOCATION WAS NOT POSSIBLE DUE TO WIFI INTERUPTIONS AND OTHER TECHNICAL DIFIFICULTIES, UNTIL LATER IN THE DAY.
20 Aug 2025 Larry Alberty
Second attempt to schedule the onsite.
18 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
Please assign to Larry Alberty ARP to site is 15 miles. Zone 1
🔧
Work Performed
Completed LC PM.
⚠️
Problem Description
28R
SYS-LC-1290II
Contract ends 06/25/2026 repair included
PM
G7167B
DEBAQ05210 1290 Infinity II Multisampler
G7104A
DEBAX03756 1290 Infinity II Flexible Pump.
G7117A
DEBAV03550 1290 Infinity II Diode Array Detector FS
G7116B
DEBA407649 1290 Infinity II Multicolumn Thermostat
G4761A
DEBBP30456 Upgrade InfinityLab Sample Thermostat
📄
Description
Agilent - G7104A 1290 Infinity III Flexible Pump
📞
Call Description
OCT 2025 LC PM
📞
Call
Completed
Oct 10, 2025
10 OCT 2025 Larry Alberty
TECH ONSITE ENTRY UPON ARRIVAL TO LOCATION WAS NOT POSSIBLE DUE TO WIFI INTERUPTIONS AND OTHER TECHNICAL DIFIFICULTIES, UNTIL LATER IN THE DAY.
📞
Call
Completed
Aug 20, 2025
20 Aug 2025 Larry Alberty
Second attempt to schedule the onsite.
📞
Call
Completed
Aug 18, 2025
18 Aug 2025 Larry Alberty
Reached out to location with proposed onsite visit time frame.
📅
WO-01298165 - Preventive Maintenance - G7104A - Menlo Park - Antheia Inc
Oct 10, 2025 7:00am – 4:00pm
Work Order: WO-01298165
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6007873853
Location: Antheia Inc
Address: 1430 Obrien Dr Ste A, Menlo Park, CA 94025
Manufacturer:
Model #: G7104A
Serial #: DEBAX03756
Contact Name: Arlie Lehmkuhler
Contact Phone: 3177504418
Contact Email: arlie.leh
Timeline
📞
📋
Work Order:
WO-01298165
Type:
Preventive Maintenance
Priority:
PC
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2025-10-10T11:00:00.000+0000
🚗
Type:
Travel, Parts
Status:
Open
Qty:
20, 1
🔧
⏱️
Type:
Labor
Status:
Open
Qty:
1, 4
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
2m
🏁
From:
Completed
To:
Closed
Duration in Previous:
5m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
1h 45m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
2m
🧾
Invoice Number:
SM-244382
Bottlenecks
Assigned
Duration: 3.0 business days (threshold: 4.0 business hours)
Exceeded by 2.5 business days
Scheduled
Duration: 36.8 business days (threshold: 2.0 business days)
Exceeded by 34.8 business days
Ready to Bill
Duration: 7.3 business days (threshold: 1.0 business days)
Exceeded by 6.3 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Oct 10, 7:00 AM
Work Details (7)
Name
Type
Status
Qty
Amount
Date
WL-02966135
Travel
Open
20
$180.00
Oct 10, 7:37 AM
WL-02966136
Travel
Open
20
$0.00
Oct 10, 7:37 AM
WL-02966137
Parts
Open
1
$0.00
Oct 10, 7:37 AM
WL-02966138
Parts
Open
1
$0.00
Oct 10, 7:37 AM
WL-02966676
Labor
Open
1
$0.00
Oct 10, 3:24 PM
WL-02966677
Labor
Open
4
$456.00
Oct 10, 3:24 PM
WL-02966678
Labor
Open
1
$0.00
Oct 10, 3:24 PM